ML20210N642

From kanterella
Jump to navigation Jump to search
Notification of Licensee Meeting W/Util on 970904 to Discuss Results of Licensee self-assessment
ML20210N642
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/21/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9708260068
Download: ML20210N642 (5)


Text

-_ - _ _ - _ _ _ -__

,o .

M4 9' UNIT ED STATES e t NUCLEAR REGULATORY COMMISSION

$ REoloN IV

,0[ 611 RYAN PLAZA DRIVE. SulTE 400

+ ,*' - ARLINoTON. TEXAS 760118064 AUG 21 1997 NOTICE OF LICENSEE MEETING-Name of Licensee: Entergy Operations, Inc.

Name of Facility: Arkansas Nuclear One, Units 1 and 2 Dockct: 50 313;50-368 Date and Time September 4,1997 of Meeting: 1 p.m. (CDT)

Location of Meeting: Region IV office, Arlington, Texas 4th floor, Training Conference Room Purpose of Meeting: Management meeting to discuss the results of the licensee self-assessment NRC Attendees: E. Merschoff, Regional Administrator T. Gwynn, Director, Division of Reactor Projects (DRP)

A. Howell, Director, Division of Reactor Safety E. Collins, Chief, Project Branch C, DRP C. Marschall, Senior Project Engineer, Project Branch C, DRP K. Kennedy, Senior Resident inspector, DRP Licenses Attendees: R. Hutchinson, Vice President R. Edington, General Manager D. Mims, Director, Nuclear _ Safety and Licensing C. Zimmerman, Plant Manager, Unit 1 R. Lane, Director, Design Engineering R. Bement, Manager, Radiation Protection B. Allen, Manager, Unit 2 Maintenance NOTE (1) This meeting is open to attendance by members of the general public.

(2) NRC personnel, not listed above, that desire to attend this meeting should notify-Elmo Collins at (817) 860-8291 by COB on August 28,1997. I D-Approved y:

m omas P4fygDirector Division of Reactor Projects 9708260068 970821 PDR F

ADOCK 05000313 "oa ll!ElR!I!!EJHVEEll ,

. aj?A-

y =

~

Entergy Operations, Inc. - -

2- --

-cc:-

" C. Randy Hutchinson, Vice President Operations -

Arkansas Nuclear One Entergy Operations, Inc.

1448 S.Rs 333-Russellville,- Arkansas - 72801 0967

- Executive Vice President

& Chief Operating Officer

.Entergy Operations, Inc.

L

.P.O. Box 31995 -

Jackson, Mississippl- 39286 1995 Vice President -

Operations Support -i Entergy Operations, Inc.

P.O. Box 31995

~ Jackson, Mississippi 39286 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear

-- Power

.12300 Twinbrook Parkway, Suite 330 -

Rockville, Maryland 20852 -

County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn .

1400 L Street, N.W.

Wanhington, D.C. 20005 3502 David D. Snellings, Jr., Director -

Division of Radiation Control and Emergency Management Arkansas Department of Health l 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 _

l

,.n.,& sa- .g

-w

-] ,

Ertergy Operations, Inc.

_ 3-Manager Rockville Nuclear Licensing Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, Mar / land 20852 i

Entergy Operations,'inc._ AUG 2 l 1997

. E-l,4all To: E.QB'

-( ) NRC Attendees PMNS Mtg Announcement Coordinator JKR- E. L Jordan, DEDO PAB H. L. Thompson, DEDR FJM F. J. Miraglia,' A/D/NRR TTM T. T. Martin, Acting ADT/NRR RPZ R. P. Zimmerman, ADP/NRR '

GXK G. Kalman,- Project Manager, NRR .

OEMAIL - J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO ,

l MFH2 M. Hammond, PAO '

KEP K. Perkins, Director, WCFO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Secretaries CLG, LMB DRS Secretaries NLH, WSW DNMS Secretaries LSO L. Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DRP File DOCUMENT NAME: R:\_ANO\AN9-4MN.DRP To recalve copy of document, Indicate in box: "C" = Copy wthout enclosures "E" = Cop' th enc!%W w N" = No copy RIV:PE:DRP/C C:DRP/C PAO QQ RSLO Ugj ~II:DRP CSMarschall;d,f EEColling ( BWHenders6n CAHackney TPGwynn_

8/2/97 Mk '

8/M197 MS 8/M/97 8/1//97 8f/l/97 (/4Ed)

' OFFIClAL RECORD COPY

..._________J

, o

  • Entergy Operations, Inc. _ 4-AUG 2 l 1997 E Mail To: EQB

( ): NRC Attendees PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DEDO PAB- H. L. Thompson, DEDR FJM F. J. Miraglia, A/D/NRR TTM T. T. Martin, Acting ADT/NRR RPZ R. P. Zimmerman, ADP/NRR GXK G. Kalman, Project Manager, NRR

- OEMAIL J. Lieberman, D/OE LJC L. J. Chandler, OGC l CAH C. A. Hackney, RSLO l DMK1 D. M. Kunihiro, WCFO L GFS G. F. Sanborn, EO l BWH B. Henderson, PAO MFH2 M. Hammond, PAO KEP K. Perkins, Director, WCFO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Secretaries CLG, LMB DRS Secretaries NLH, WSW DNMS Secretaries LSO L. Ousley cc:

10 M S K 46)]

OEDO RIV Coordinator (17G21)

- Receptionist ORA File -

RIV File DRP File DOCUMENT NAME: R:\_ANO\AN9-4MN.DRP To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

~

RIV:PE:DRP/C C:DRP/C PAO $

RSLO @ D:DRP CSMarschall;d,f EEColling ( BWHenderstfn CAHackney TPGwynn_

8/S/97 Mk 8/g /97 MS 8/7\/97 8/.1//97 8$l/97 (XEd)

F

' OFFIClAL RELORD COPY

\

M