05000397/FIN-2015003-03

From kanterella
Revision as of 23:22, 21 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
03
Site: Columbia Energy Northwest icon.png
Report IR 05000397/2015003 Section 1R04
Date counted Sep 30, 2015 (2015Q3)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.04
Inspectors (proximate) C Stott
D Bradley
J Groom
J O'Donnell
L Carson
M Phalen
N Greene
R Smith
Violation of: Technical Specification - Procedures

10 CFR 50 Appendix B Criterion III, Design Control

Technical Specification
CCA P.2, Evaluation
INPO aspect PI.2
'