Finding | |
---|---|
Title | Failure to Meet Technical Specification 3.7.3 for Operability of Control Room Ventilation System |
Description | The inspectors identified a finding of very low safety significance with an associated non-cited violation of Technical Specification (TS) 3.7.3, Control Room Ventilation System, following the discovery of a crack on the Train B Control Room ventilation (VC) system return fan hub during investigation of the cause for high noise and vibration levels observed on May 23, 2011. The licensee failed to correctly evaluate the operability of the Train B VC system return fan in a timely manner to prevent exceeding the TS allowed outage time for entry into Mode 3. The licensee replaced the fan and returned it to an operable status. The failure to correctly evaluate a degraded/nonconforming condition potentially affecting the operability of structures, systems, and components (SSCs) required to be operable by TS would become a more significant safety concern if left uncorrected because it could reasonably result in an unrecognized condition of an SSC failing to fulfill a safety-related function. The finding was, therefore, of more than minor significance. Because the Control Room ventilation system supports the radiological barrier function to protect operators inside the Control Room following certain design basis accidents, the inspectors concluded that this issue was associated with the Barrier Integrity Cornerstone. The finding was a licensee performance deficiency of very low safety significance because it involved only a degradation of the radiological barrier function provided for the Control Room. The inspectors concluded that this finding affected the cross-cutting area of human performance. Specifically, licensee decision making to delay inspection of the fan hub and blades until after a new fan was delivered on site to confirm the initial operability determination was not conservative and not consistent with demonstrating that nuclear safety is an overriding priority. |
Site: | Clinton |
---|---|
Report | IR 05000461/2011004 Section 4OA3 |
Date counted | Sep 30, 2011 (2011Q3) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | B Kemker D Lords J Cassidy J Draper M Ring R Langstaff S Bell S Mischke V Myersb Kemkerc Brown D Lords D Szwarc J Bozga J Cassidy M Ring R Orlikowski S Bell S Mischke |
CCA | H.14, Conservative Bias |
INPO aspect | DM.2 |
' | |
Finding - Clinton - IR 05000461/2011004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Clinton) @ 2011Q3