Summary of 870212 Meeting W/Util in Arlington,Tx Re Compensatory Measures for Inadequate Barriers & Surveillance Aids & 10CFR73.71(c) Reportability.List of Attendees Encl
ML20207R561
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/04/1987
From: Caldwell R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20207R546 List:
References
NUDOCS 8703170366
Download: ML20207R561 (2)


Text

_

/ ,e MEETING

SUMMARY

Licensee: Arkansas Power & Light Company Facility: Arkansas Nuclear One Docket: 50-313/50-368

Subject:

Security Program Apparent Violations On February 12, 1987, representatives of Arkansas Power & Light met with Region IV personnel in Arlington, Texas, to discuss compensatory measures for inadequate barriers and surveillance aids and 10 CFR 73.71(c) reportability.

The attendance list is attached as Appendix A to this Summary. The meeting was held at the request of the NRC.

The Arkansas Power & Light - NRC meeting focused on the implementation at ANO of safeguards compensatory measures for maintaining the effectiveness of the security system until a discovered, failed, or degraded physical protection feature can be repaired or replaced. The compensatory measure would assure an essentially equivalent level of protection as a functional barrier, detection aid, or surveillance aid that meets the general performance objective and requirements of 10 CFR 73.55(a). Discussion was held on what is the equivalent measure for a degraded barrier, detection aid, or surveillance aid.

In addition, the requirement to report failed, degraded or inadequate personnel or hardware systems pursuant to the requirements of 10 CFR 73.71(c) was discussed.

The NRC staff concluded that further review was necessary prior to determining the adequacy or inadequacy of the ANO safeguard requirements for compensatory measures and reportability.

(h .

4b7 Ron'ald A. Calpwell Date Security Spec'ialist

Attachment:

Attendance List 8703170366 870311 R ADOCK 05000313 i PDR

f, ,

t 2

ATTENDANCE LIST Attendance at the Arkansas Power & Light - NRC meeting on February 12, 1987, at the NRC Region office:

Arkansas Power and Light Gene Campbell, Vice-President, Nuclear Operations James M. Levine, Director, Site Nuclear Operations Dan R. Howard, Manager, Special Projects Early C. Ewing, General Manager, Plant Support Carroll W. Dunn, General Manager, Corporate Security Horace L. Hollis, Security Superintendent Donald B. Lomax, Plant Licensing Supervisor NRC, Region IV Paul S. Check, Deputy Regional Administrator Richard L. Bangart, Director, Division of Radiation Safety and Safeguards Jim Gagliardo, Chief, Reactor Projects Branch William L. Fisher, Chief, Radiological and Safeguards Programs Branch

. William L. Brown, Regional Counsel Dale A. Powers, Enforcement Officer

] Dorwin R. Hunter, Chief, Reactor Project Section B Michael E. Murphy, Project Inspector

~

James A. Kelly, Senior Security Inspector Ronald A. Caldwell, Security Inspector l