Letter Sequence Request |
---|
EPID:L-2020-LLE-0179, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises, Due to COVID-19 Pandemic (Approved, Closed) |
|
MONTHYEARCNL-20-069, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises, Due to COVID-19 Pandemic2020-10-14014 October 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises, Due to COVID-19 Pandemic Project stage: Request ML20308A3602020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) Project stage: Request CNL-20-092, Request for an Exemption Regarding Calendar Year 2020 Force-on-Force Exercise2020-11-0404 November 2020 Request for an Exemption Regarding Calendar Year 2020 Force-on-Force Exercise Project stage: Request ML20316A0172020-11-0909 November 2020 NRR E-mail Capture - Acceptance for Review of Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1) for Watts Bar Nuclear Plant, Units 1 and 2 Project stage: Acceptance Review ML20318A0362020-12-0808 December 2020 Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel Subsection VI C.3(l)(1) (EPID L-2020-LLE-0179 (COVID-19)) Project stage: Approval 2020-11-04
[Table View] |
|
---|
Category:Exemption from NRC Requirements
MONTHYEARCNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML22117A1862022-04-29029 April 2022 Exemptions from the Requirements of 10 CFR Part 26, Section 26.205(d)(7) (EPID L-2022-LLE-0017) (Exemption) ML22117A1852022-04-29029 April 2022 Exemptions from the Requirements of 10 CFR Part 26, Section 26.205(d)(7) (EPID L-2022-LLE-0017) (Letter) CNL-22-054, Request for Exemption from Requirements of 10 CFR 26.205(d)(4), 26.205(d)(6) and 26.205(d)(7), Fitness for Duty Programs - Work Hours2022-04-15015 April 2022 Request for Exemption from Requirements of 10 CFR 26.205(d)(4), 26.205(d)(6) and 26.205(d)(7), Fitness for Duty Programs - Work Hours ML20318A0362020-12-0808 December 2020 Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel Subsection VI C.3(l)(1) (EPID L-2020-LLE-0179 (COVID-19)) CNL-20-092, Request for an Exemption Regarding Calendar Year 2020 Force-on-Force Exercise2020-11-0404 November 2020 Request for an Exemption Regarding Calendar Year 2020 Force-on-Force Exercise CNL-20-069, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises, Due to COVID-19 Pandemic2020-10-14014 October 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises, Due to COVID-19 Pandemic ML19112A0522019-07-25025 July 2019 Federal Register Notice: Watts Bar Nuclear Plant, Units 1 and 2 - Exemption from the Requirements of 10 CFR Section 50.46 and Appendix K to 10 CFR Part 50 ML1000604112010-03-0808 March 2010 FRN: General Notice. Watts Bar Nuclear Plant, Units 1 and 2 - Exemption from the Requirements of 10 CFR Part 73, Section 73.55 NRC-2010-0019, FRN: General Notice. Watts Bar Nuclear Plant, Units 1 and 2 - Exemption from the Requirements of 10 CFR Part 73, Section 73.55 (TAC Nos. ME2601 and ME2602)2010-03-0808 March 2010 FRN: General Notice. Watts Bar Nuclear Plant, Units 1 and 2 - Exemption from the Requirements of 10 CFR Part 73, Section 73.55 (TAC Nos. ME2601 and ME2602) ML0531802632005-12-20020 December 2005 One-Time Exemption from NRC Requirements, EP Scheduler Exemption 2023-12-21
[Table view] Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. 2024-01-09
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-20-069 October 14, 2020 10 CFR 73.5 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390 and 50-391
Subject:
Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises, Due to COVID-19 Pandemic
Reference:
NRC Letter from H. Nieh and J. Lubinski to NEI, U.S. Nuclear Regulatory Commission Planned Actions Related to the Requirements for Part 73, Appendix B,Section VI During the Coronavirus Disease 2019 Public Health Emergency, dated April 20, 2020 (ML20105A483)
On January 31, 2020, the U.S. Department of Health and Human Services declared a public health emergency (PHE) for the United States to aid the nations healthcare community in responding to the Coronavirus Disease 2019 (COVID-19). On March 12, 2020, the Governor of the State of Tennessee declared a state of emergency. In addition, on March 11, 2020, the World Health Organization characterized the COVID-19 outbreak as a pandemic and, on March 13, 2020, the President of the United States of America declared the COVID-19 pandemic a national emergency. In response to these declarations and in accordance with the corporate pandemic response plan, Tennessee Valley Authority (TVA) has postponed some site activities due to isolation activities (e.g., social distancing, group size limitations, maximum telework, and self-quarantining), and also has considered the possibility of isolation of required station personnel to maintain necessary staffing levels.
In accordance with the provisions of 10 CFR 73.5, and consistent with the conditions specified in the Enforcement Guidance Memorandum 20-002 and the Reference letter, TVA is requesting temporary exemption from the requirements of Appendix B to Part 73,Section VI, C.3.(l)(1) for Watts Bar Nuclear Plant (WBN), Units 1 and 2, regarding the conduct of a force-on-force (FOF) exercise. As a result of the COVID-19 PHE, TVA expects that WBN will no longer be able to comply with the requirements of the specified regulation, and will implement site-specific COVID-19 PHE training requalification controls consistent with those conditions outlined in the enclosure to the referenced letter.
U.S. Nuclear Regulatory Commission CNL-20-069 Page 2 October 14, 2020 This temporary exemption supports the isolation restrictions (e.g., social distancing, group size limitations, self-quarantining, etc.) necessary to protect required site personnel in response to the COVID-19 virus. These restrictions are needed to ensure personnel are isolated from the COVID-19 virus and remain capable of maintaining plant security. WBN implemented proactive isolation restrictions for site personnel on March 23, 2020.
This exemption is specific to security personnel who have previously demonstrated proficiency and are currently qualified in accordance with 10 CFR Part 73, Appendix B, Section VI, Nuclear Power Reactor Training and Qualification Plan for Personnel Performing Security Program Duties. Additionally, because of the rigorous nature of WBN security personnel training programs, which consists of regularly scheduled training activities to include weapons training, contingency response drills and exercises, and demonstrated acceptable performance of day-to-day job activities (e.g., detection and assessment, patrols, searches, and defensive operations), it is reasonable to conclude that security personnel will continue to maintain their proficiency, even though the requalification periodicity is temporarily exceeded.
WBN requests a temporary exemption from the following specific FOF exercise requirements of 10 CFR 73, Appendix B, VI.C.3.(l)(1):
Each member of each shift who is assigned duties and responsibilities required to implement the safeguards contingency plan and licensee protective strategy participates in at least one (1) tactical response drill on a quarterly basis and one (1) force-on-force exercise on an annual basis.
The FOF exercise grace period expires on November 5, 2020. TVA has extended its maximum telework/reintegration Phase 1 posture until, at least, January 1, 2021. Because of these company guidelines and social distancing expectations, WBN will not be able to complete the 2020 FOF annual exercises. These restrictions are needed to ensure WBN essential personnel are isolated from the COVID-19 disease and remain capable of maintaining plant security.
WBN will implement the following controls to ensure impacted security personnel maintain the knowledge, skills, and abilities required to effectively perform assigned duties and responsibilities.
- WBN will maintain a list of the names of the individuals who will not meet the requalification requirements and will include the dates of the last qualification.
- WBN will ensure contingency response readiness of security personnel not participating in an annual FOF exercise, by conducting the following scenario-based evolution.
o Continue to conduct quarterly tactical response drills, including tabletop exercises, to ensure the security force maintains response readiness.
WBN is scheduled to complete 2021 FOF annual exercise in August of 2021, providing the PHE has ended. However, should unforeseen circumstances arise that would inhibit resuming these activities, TVA will provide an updated request for exemption with as much advance notice as practicable.
U.S. Nuclear Regulatory Commission CNL-20-069 Page 3 October 14, 2020 Part 73.5 of 10 CFR, Specific exemptions, states that the NRC may grant exemptions from the requirements of the regulations of this part provided three conditions are met. They are:
(1) The exemptions are authorized by law.
(2) The exemptions will not endanger life or property or the common defense and security.
(3) The exemptions are otherwise in the public interest.
TVA has evaluated the requested exemption against the criteria of 10 CFR 73.5 and determined the criteria are satisfied as described below.
- 1. This exemption is authorized by law.
The requested exemption is authorized by law in that no law precludes the activities covered by this exemption request. Granting of the request does not result in a violation of the Atomic Energy Act of 1954, as amended.
- 2. This exemption will not endanger life or property or the common defense and security.
The requested exemption will not endanger life or property or the common defense and security. The requested exemption is a one-time exemption to allow deferring of security training requalification requirements. TVA had scheduled these requalification activities to comply with the regulation. However, these activities must be rescheduled to allow implementation of the TVA pandemic plan mitigation strategies. These strategies serve the public interest by ensuring adequate staff isolation and maintaining staff health to perform their job function actions during the COVID-19 pandemic.
The proposed exemption is related to training requalification and does not change physical security plans or the defensive strategy. Security personnel impacted by this exemption are currently satisfactorily qualified on all required tasks. In addition, security personnel are monitored regularly by supervisory personnel and have implemented controls as identified above. Therefore, granting the requested temporary one-time exemption will not endanger or compromise the common defense or security, or safeguarding of WBN.
- 3. This exemption is otherwise in the public interest.
The TVA pandemic response plan is based on NEI 06-03, Nuclear Sector Coordination Council, Influenza Pandemic Threat Summary and Planning, Preparation, and Response Reference Guide, which recommends isolation strategies such as sequestering, use of super crews or minimum staffing as well as social distancing, group size limitations and self-quarantining, in the event of a pandemic, to prevent the spread of the virus to the plant.
NEI 06-03 provides other mitigation strategies that serve the public interest during a pandemic by ensuring adequate staff is isolated from the pandemic and remains healthy to perform their job function.
Keeping WBN in operation during the pandemic will help to support the public need for reliable electricity supply to cope with the pandemic. As the U.S. Departments of Homeland Security and Energy have stated in their guidance, the electric grid and nuclear plant
U.S. Nuclear Regulatory Commission CNL-20-069 Page 4 October 14, 2020 operation make up the nation's critical infrastructure similar to the medical, food, communications, and other critical industries. If the plant operation is impacted because it cannot comply with the security training requalification requirements while isolation activities are in effect for essential crew members, the area electrical grid would lose this reliable source of baseload power. In addition, WBN personnel could face the added transient challenge of shutting down their respective plant and possibly not restarting it until the pandemic passes. This does not serve the public interest in maintaining a safe and reliable supply of electricity.
TVA has determined that the exemption involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite; that there is no significant increase in individual or cumulative public or occupational radiation exposure; that there is no construction impact; and there is no significant increase in the potential for or consequences from a radiological accident. Furthermore, the requirements for which an exemption is being requested involve security training requalification requirements.
Accordingly, the proposed exemption meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(25). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this proposed exemption request.
The period during which the exemption is necessary will be in effect until the end of calendar year 2020.
There are no new regulatory commitments associated with this submittal. Please address any questions regarding this request to Gordon Williams, Senior Manager, Fleet Licensing (Acting) at 423-751-2687.
Respectfully, Jonathan T. Johnson Director, Nuclear Regulatory Affairs (Acting) cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant