MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR ML20207J4931999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20127J5121993-01-19019 January 1993 Notification of 930202-03 Meetings W/Licensee in Columbia,Al Re Safety Audit of Storage Pond Dam & Dike by NRC & FERC ML20126B1451992-12-11011 December 1992 Notification of 921218 Meeting W/Util in Rockville,Md to Discuss Amend Request for Steam Generator Tube Alternate Plugging Criteria ML20058F4581990-11-0505 November 1990 Submits Daily Highlight.Notifies of 901107 Meeting W/Util to Discuss Technical & Regulatory Concerns Re Steam Generator Tube Collapse Under LOCA & Safe Shutdown Earthquake Loads ML20058E0461990-11-0202 November 1990 Notification of 901120 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Actions ML20058E8271990-11-0202 November 1990 Notification of 901106 Meeting W/Licensee in Rockville,Md to Discuss Facility Steam Generators & Use of EPRI Alternative Tube Plugging Criteria.Agenda Encl ML20058H8871990-11-0202 November 1990 Notification of Cancellation of 901120 Meeting W/Util to Discuss Status of Licensing Actions 1999-06-23
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR ML20207J4931999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20127J5121993-01-19019 January 1993 Notification of 930202-03 Meetings W/Licensee in Columbia,Al Re Safety Audit of Storage Pond Dam & Dike by NRC & FERC ML20126B1451992-12-11011 December 1992 Notification of 921218 Meeting W/Util in Rockville,Md to Discuss Amend Request for Steam Generator Tube Alternate Plugging Criteria ML20058F4581990-11-0505 November 1990 Submits Daily Highlight.Notifies of 901107 Meeting W/Util to Discuss Technical & Regulatory Concerns Re Steam Generator Tube Collapse Under LOCA & Safe Shutdown Earthquake Loads ML20058E0461990-11-0202 November 1990 Notification of 901120 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Actions ML20058E8271990-11-0202 November 1990 Notification of 901106 Meeting W/Licensee in Rockville,Md to Discuss Facility Steam Generators & Use of EPRI Alternative Tube Plugging Criteria.Agenda Encl ML20058H8871990-11-0202 November 1990 Notification of Cancellation of 901120 Meeting W/Util to Discuss Status of Licensing Actions 1999-06-23
[Table view] |
Text
._ _ _ . . _ - _ _. _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _
November 12, 1998 MEMORANDUM TO: Docket File FROM: Jacob 1. Zimmerman, Project Manager Original signed by:
Project Directorate ll-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
SUBJECT:
FARLEY NUCLEAR PLANT, UNIT 1 - PUTTING A DOCUMENT IN THE PUBLIC DOCUMENT ROOM I
The attached message was faxed today to Mark Ajiuni of Southern Nuclear Operating 1
Company, Inc. (SNC). The purpose of the message is to prepare SNC personnel for a l l
conference call. The message itself does not constitute a formal request for information or
^
represent a formal NRC staff position. l Docket No. 50-348 I
Attachment:
As stated .,
Distribution Docket File PUBLIC H. Berkow S. Coffin
]
9811160271 981112 PDR ADOCK 05000348 G PDR To receive a copy of this document, indicate in the box: "C" = Copy without attachment /
"E" = Copy with attachment / enclosure "N" = No copyn OFFICE PM:P&p-) l6 1.$PDi@ l D:PD([tVM l
! NAME JZimrpelrrnan:en YBerry" HBerk3w -Gor DATE /'/ /A/98 11/ W98I Il/lW98 / /98 / /98 / /97 DOCUMENT NAME: G:\FARLEY\SGPDR.MEM OFFICIAL RECORD COPY EM FRE EDif 3 CGPY
',n_.,J
A uro p i UNITED STATES j g j NUCLEAR REGULATORY COMMISSION j g I WASHINGTON, D.C. 30666 4001 8 November 12, 1998
% ,. . . . . ,o l '
l MEMORANDUM TO: Docket File FROM: Jacob 1. Zimmerman, Project Manager j- Project Directorate ll-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
SUBJECT:
FARLEY NUCLEAR PLANT, UNIT 1 - PUTTING A DOCUMENT IN THE PUBLIC DOCUMENT ROOM i
The attached message was faxed today to Mark Ajiuni of Southem Nuclear Operating Company, Inc. (SNC). The purpose of the message is to prepare SNC personnel for a j conference call. The message itself does not constitute a formal request for information or represent a formal NRC staff position.
I Docket No. 50-348
Attachment:
As stated l
l t
h i
l.
l . o Steam Generator Tube inspection Results Licensees steam generator *(SG) tube eddy current (EC) inspections play a vital role in the g
management of SG tube degradation. The results are used to demonstrate adequate structural and leakage integrity of the SG tubes. .
L NRC staff is interested in discussing the SNC's steam generator inspection plans and results, although you are not required to participate in this discussion. Typical areas of discussion include:
i e Primary to secondary leakage prior to shutdown
- e Results of secondary side hydro l- )
i e For each steam generator, a general description of areas examined; including expansion criteria and type of probe used in each area e For analyzed EC results, a description of bobbin indications (those not examined with RPC .
l (Rotating Pancake Coil)) and RPC/Plus Point /Cecco indications. Including the following l information: location, number, degradation mode, disposition, and voltages / depths / lengths of most significant indications e Description of repair / plugging plans e Discussion of previous history; "look backs" performed; consideration of similar plants' l experiences
- Discussion of new inspection findings, including loose parts indications e Description of in-situ pressure test plans and results; include tube selection criteria, test pressure plans, test configuration l
e Describe tube pull plans and preliminary results; include tube selection criteria and evaluation plans e Assessment of tube integrity for previous operating cycle e Assessment of tube integrity for next operating cycle e Provide schedule for steam generator-related activities during remainder of current outage t