ML20203G195
From kanterella
ML20203G195 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 12/12/1997 |
From: | Maret G VERMONT YANKEE NUCLEAR POWER CORP. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
BVY-97-171, NUDOCS 9712180075 | |
Download: ML20203G195 (2) | |
Similar Documents at Vermont Yankee | |
---|---|
Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER)
MONTHYEARBVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999
[Table view]Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-97-171, Special Rept:On 971105,fire Alarm Panel & Suppression Sys Were Out of Svc Greater than 14 Days.Caused by Hardware Problems W/New Zone Modules Developed During Mods.Sys Placed Back in Svc on 9711211997-12-12012 December 1997 Special Rept:On 971105,fire Alarm Panel & Suppression Sys Were Out of Svc Greater than 14 Days.Caused by Hardware Problems W/New Zone Modules Developed During Mods.Sys Placed Back in Svc on 971121 BVY-97-101, Special Rept:On 970717,determined Ongoing or Recent Contamination Event Could Be Source of Detected Environ Radioactivity.Collection,Analysis & Review of Results of Addl Grab Samples from North Storm Drain Outfall1997-08-0808 August 1997 Special Rept:On 970717,determined Ongoing or Recent Contamination Event Could Be Source of Detected Environ Radioactivity.Collection,Analysis & Review of Results of Addl Grab Samples from North Storm Drain Outfall ML20148B8701997-04-22022 April 1997 Special Rept:On 970123,periodic Source Leakage Test of 150 Uci Cs-137 Source Revealed Presence of Greater than 0.005 Uci of Removable Contamination.Source Removed from Svc & Will Be Disposed of IAW Applicable Regulatory Requirements ML20135E0261997-02-27027 February 1997 Special Rept:On 970116,Cable Vault CO2 & Diesel Fire Pump Day Tank Room CO2 Sys Place in Abort.Caused by Installation of New Low Pressure CO2 Sys for Switchgear Rooms.Established Compensatory Measures & Required Manual Initiation for Sys ML20112F8001996-06-0707 June 1996 Special Rept:On 960424,fire Protection Sys Declared Inoperable as Conservative Precaution for Greater than 14 Days.Calculations for Sys May Not Accurately Reflect Pressure Loss.Mods Being Developed ML20108C6711996-05-0202 May 1996 Special Rept:On 960320,switchgear CO2 Sys Declared Inoperable.Suppression Sys Remains Capable of Automatic Initiation & Compensatory Measure Will Remain in Effect Until Confirmatory Testing Completed ML20064C3501994-02-23023 February 1994 Special Rept:On 940127 & 0209,electric Fire Pump Motor Failed to Start Due to Motor Breaker Trip.Redirected Room Heater Discharge to Diesel Fire Pump Engine Area BVY-92-105, Special Rept:On 920810,electric Fire Pump Portion of Vital Fire Suppression Water Sys Equipment Inoperable for 17 Days. Caused by Need to Perform Preventive maint.Diesel-driven Fire Pump Remained Operable & Contingency Plans Developed1992-09-11011 September 1992 Special Rept:On 920810,electric Fire Pump Portion of Vital Fire Suppression Water Sys Equipment Inoperable for 17 Days. Caused by Need to Perform Preventive maint.Diesel-driven Fire Pump Remained Operable & Contingency Plans Developed ML20248B9851989-06-0202 June 1989 Special Rept:On 890421,cable Vault Carbon Dioxide (CO2) Sys & on 890424,diesel Fire Pump Day Tank Room CO2 Sys Declared Inoperable.Fire Protection Sys Out of Svc for More than 14 by 890602.Fire Watches Established ML20236E2751989-03-14014 March 1989 Special Rept:U Slab Source Found to Be Leaking Contamination During Semiannual Radioactive Source Leak Test.Caused by Break Down of Adhesive That Hold Mylar Covering.Source Removed from Svc & Deconned & Resealed W/New Covering ML20112E1821983-10-0707 October 1983 Rev 1 to RO 83-06:accumulative from 840810-23,buildup of Detectable Quantities of plant-related Co-60 in Connecticut River.Caused by Turbine Bldg Roof Vents Failing to Filter Waste.Procedural Changes Implemented ML20086E2201975-03-10010 March 1975 Ro:On 750209 & 10,excessive Level of Heat Rejected to Connecticut River & Filter Paper Sample Whisked from Numbed Technician Hand by Wind,Respectively.Events Caused by Lack of Communication & Wind,Respectively ML20086E4101975-01-0909 January 1975 Ro:On 741126,RHR Svc Water Pump C (P-8-1C) 1,200-amp Circuit Breaker Encountered Significant Damage During Attempted Start.Caused by Migrating Ionized Gases Causing Front Primary Disconnect Device Failure.Breaker Replaced ML20086E6571974-04-25025 April 1974 Ro:On 740414-16,each Operable Control Rod Not Fully Inserted Was Not Exercised One Notch During Surveillance Exercise. Cause Not Stated.Strict Adherence to Surveillance Test Schedule Emphasized ML20086D8711973-03-0606 March 1973 Ro:On 730205,all-purpose Fuel Grapple Became Detached from Jib Crane Hoist Cable When Tension Applied to Cable.Caused by Design Error.Grapple & Cable End Stud Reassembled,End Stud Drilled & Roll Pin Installed & Staked 1999-08-19 Category:TEXT-SAFETY REPORT MONTHYEARML20217L8831999-10-21021 October 1999
[Table view]Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20203G195&oldid=3031918"