ML20205G312
From kanterella
ML20205G312 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 08/04/1986 |
From: | Bournia A Office of Nuclear Reactor Regulation |
To: | Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8608190459 | |
Download: ML20205G312 (67) | |
Similar Documents at LaSalle | |
---|---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20134M3841997-02-13013 February 1997
[Table view]Summary of 970128 Meeting W/Util to Discuss Program to Dispose of Weapons Grade Pu Through Use as Mixed Oxide Fuel. List of Attendees & Matl Used in Presentation Encl ML20059J8071994-01-19019 January 1994 Summary of Operating Reactors Events Meeting 94-02 on 940112 ML20217D4611993-12-0808 December 1993 Summary of 931206 Meeting W/Commonwealth Edison Co Re Items of Mutual Interest Re Operations at Utilities Nuclear Power Plants,W/Special Attention Devoted to Activities at Quad Cities Nuclear Station,Units 1 & 2 ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20059C9731993-09-0808 September 1993 Summary of 400th ACRS Meeting on 930805-06 in Bethesda,Md Re Proposed Resolution of GSI 57, Effects of Fire Protection Sys Actuation on Safety-Related Equipment & Lessons Learned from LaSalle Fire & Report on ABWR Fire Safety Issues ML20056D7471993-07-27027 July 1993 Summary of 930617 Meeting W/Util to Discuss Steps Being Taken by Licensee to Resolve Reactor Vessel Water Level Instrumentation Degassing Issue.List of Attendees Encl ML20059C7311993-01-30030 January 1993 Summary of 391st ACRS Meeting on 921105-07 in Bethesda,Md Re NRC Regulatory Analysis Guidelines & Reactor Operating Events & Occurrences,Shearon Harris Plant Loss of High Head SI & LaSalle Overfill Due to Failure of MFW Pumps to Trip ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20214F6731987-05-18018 May 1987 Summary of 870514 Meeting W/Util Re Review of Status of Pending Licensing Actions on Util Plants.Meeting Agenda & List of Attendees Encl ML20210T4791987-02-0404 February 1987 Summary of 870122 Meeting W/Util & Signals & Safeguards,Inc Re long-term Resolution W/Static O-Ring,Inc Switches as Result of Studies.List of Attendees & Viewgraphs Encl ML20207P6271987-01-12012 January 1987 Summary of Operating Reactor Events Meeting 86-46 on 861229.List of Attendees,Events Discussed & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20215F0151986-12-16016 December 1986 Summary of Operating Reactor Events Meeting 86-43 on 861208. List of Attendees,Events Discussed & Significant Elements of Events Encl ML20207L9571986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl1986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl ML20210C4211986-09-11011 September 1986 Summary of Operating Reactors Events Meeting 86-31 on 860908.Lists of Attendees,Events & Significant Elements & Assignments Encl NUREG-0518, Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants1986-08-18018 August 1986 Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants ML20205G3121986-08-0404 August 1986 Summary of 860718 Meeting W/Util,Cygna Energy Svcs,Static O- Ring,Inc,Gpu & Sargent & Lundy to Discuss Util Test Results of Static O-Ring Switches.List of Meeting Attendees & Viewgraphs Encl ML20207E2811986-07-16016 July 1986 Summary of Operating Reactors Events Meeting 86-24 on 860714 Re Events Occurring Since 860707 Meeting ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20237C9681986-02-19019 February 1986 Trip Rept of Attendance at State of Il 860213 Meeting Re Training Session on NRC Incident Response Program & NRC Participation in 860408 Plant Emergency Exercise.List of Attendees & Partial Agenda Encl ML20141H8551986-01-10010 January 1986 Trip Rept of 851112-15 Site Visits Re Wrong Unit/Wrong Train Events.Visit Conducted as Part of short-term Effort to Determine If Low Cost Improvements Can Be Identified & Implemented to Reduce Frequency of Events ML20128K7491985-07-12012 July 1985 Summary of Operating Reactor Events Meeting 85-11 on 850701. List of Attendees,Events Discussed,Significant Elements of Events & Assignment of Followup Review Responsibility Encl ML20148C1311979-12-20020 December 1979 Summary of Meeting W/Mark II Owners Group in Bethesda,Md Re Status of Several long-term Program Tasks in Advance of Final Documentation.Agenda,List of Attendees & Viewgraphs Encl ML20213D0331979-08-22022 August 1979 Summary of 790717-18 Meeting W/Mark II Owners Group Re long-term Program Tasks ML20213C8911979-03-14014 March 1979 Summary of 790213-14 Meeting W/Mark II Owners Group Re Lead Plant Acceptance Criteria & Intermediate Plant Program Tasks ML20150C6821978-11-13013 November 1978 Agenda for 781128-30 ACRS Meeting in San Francisco of Fluid Hydraulic Dynamic Effects Subcomm Re Mark II LOCA & SRV Pool Dynamic Loads & Load Combinations ML20214G8691978-01-10010 January 1978 Summary of 770518-19 Meetings W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads Program ML20214G8451977-12-0202 December 1977 Summary of 770510 Meeting W/Mark II Owners Executive Committee Re Mark II Containment Dynamic Loads Program.List of Attendees & Viewgraphs Encl ML20214G8351977-11-29029 November 1977 Summary of 770401 & 0707 Meetings W/Mark II Owners & GE Re Methods for Combining Dynamic Loads for Structural Design of Mark II Containment.List of Attendees & Viewgraphs Encl ML20214G7951977-08-0202 August 1977 Summary of 770729 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Load Program ML20214G7841977-06-23023 June 1977 Summary of 770615 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Loads.List of Attendees Encl ML20214G7741977-06-0808 June 1977 Summary of 770526 Meeting W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads.List of Meeting Attendees Encl ML20214G6951977-04-18018 April 1977 Summary of 770216-17 Meeting W/Mark II Owners,Ge & BNL Re Mark II Containment Pool Dynamic Load Support Program.List of Meeting Attendees & Viewgraphs Encl ML20214G4271976-12-29029 December 1976 Summary of 761202 Meeting W/Mark II Owners & GE Re Mark II Containment Structural Design & Pool Dynamic Loads Supporting Program.Attendee List & Viewgraphs Encl ML20214G4371976-12-0707 December 1976 Summary of 761027-28 Meetings W/Mark II Owners,Ge & BNL Re Pool Dynamic Loads Analytical Model & Test Program.Lists of Attendees & Viewgraphs Encl ML20214G4501976-06-0808 June 1976 Summary of 760429 Meeting W/Ge,Mark II Owners & Respective Aes Re GE 751105 Design Basis Document NEDE-21061, Mark II Containment Dynamic Forcing Function Info Rept (Dffr) ML20214G6031975-08-26026 August 1975 Summary of 750821 Meeting W/Mark II Owners,Sargent & Lundy, Bechtel,S&W & B&R in Bethesda,Md Re Load Factors & Load Combinations for Assessing Capability of Mark II Containments to Accommodate Safety/Relief Valve Loads ML20214G7791975-07-0303 July 1975 Summary of 750630 Meeting W/Mark II Owners,Aes & GE in Bethesda,Md Re Role of Mark II Owners,Status of Const of Various Mark II Units & Program for Determining Mark II LOCA & Safety/Relief Valve Loads 1997-02-13 Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT) MONTHYEARML20134M3841997-02-13013 February 1997
[Table view]Summary of 970128 Meeting W/Util to Discuss Program to Dispose of Weapons Grade Pu Through Use as Mixed Oxide Fuel. List of Attendees & Matl Used in Presentation Encl ML20059J8071994-01-19019 January 1994 Summary of Operating Reactors Events Meeting 94-02 on 940112 ML20217D4611993-12-0808 December 1993 Summary of 931206 Meeting W/Commonwealth Edison Co Re Items of Mutual Interest Re Operations at Utilities Nuclear Power Plants,W/Special Attention Devoted to Activities at Quad Cities Nuclear Station,Units 1 & 2 ML20058M5891993-09-27027 September 1993 Summary of Operating Reactors Events Meeting 93-36 on 930922 ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20059C9731993-09-0808 September 1993 Summary of 400th ACRS Meeting on 930805-06 in Bethesda,Md Re Proposed Resolution of GSI 57, Effects of Fire Protection Sys Actuation on Safety-Related Equipment & Lessons Learned from LaSalle Fire & Report on ABWR Fire Safety Issues ML20056D7471993-07-27027 July 1993 Summary of 930617 Meeting W/Util to Discuss Steps Being Taken by Licensee to Resolve Reactor Vessel Water Level Instrumentation Degassing Issue.List of Attendees Encl ML20059C7311993-01-30030 January 1993 Summary of 391st ACRS Meeting on 921105-07 in Bethesda,Md Re NRC Regulatory Analysis Guidelines & Reactor Operating Events & Occurrences,Shearon Harris Plant Loss of High Head SI & LaSalle Overfill Due to Failure of MFW Pumps to Trip ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20214F6731987-05-18018 May 1987 Summary of 870514 Meeting W/Util Re Review of Status of Pending Licensing Actions on Util Plants.Meeting Agenda & List of Attendees Encl ML20210T4791987-02-0404 February 1987 Summary of 870122 Meeting W/Util & Signals & Safeguards,Inc Re long-term Resolution W/Static O-Ring,Inc Switches as Result of Studies.List of Attendees & Viewgraphs Encl ML20207P6271987-01-12012 January 1987 Summary of Operating Reactor Events Meeting 86-46 on 861229.List of Attendees,Events Discussed & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20215F0151986-12-16016 December 1986 Summary of Operating Reactor Events Meeting 86-43 on 861208. List of Attendees,Events Discussed & Significant Elements of Events Encl ML20207L9571986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl IA-86-855, Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl1986-11-18018 November 1986 Summary of 860909 Meeting W/Utils Re Improving Lines of Communication Between NRC & Licensees,Including Sholly Process,Interpretation of 10CFR50.59,Tech Spec Improvement Program & Discretionary Enforcement.Related Info Encl ML20210C4211986-09-11011 September 1986 Summary of Operating Reactors Events Meeting 86-31 on 860908.Lists of Attendees,Events & Significant Elements & Assignments Encl NUREG-0518, Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants1986-08-18018 August 1986 Summary of ACRS 316th Meeting on 860807-09 in Washington,Dc Re Proposed Standardization Policy Statement & Review of Issues Related to Reorganization of TVA Mgt Structure & Shutdown of TVA Nuclear Power Plants ML20205G3121986-08-0404 August 1986 Summary of 860718 Meeting W/Util,Cygna Energy Svcs,Static O- Ring,Inc,Gpu & Sargent & Lundy to Discuss Util Test Results of Static O-Ring Switches.List of Meeting Attendees & Viewgraphs Encl ML20207E2811986-07-16016 July 1986 Summary of Operating Reactors Events Meeting 86-24 on 860714 Re Events Occurring Since 860707 Meeting ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20211G9361986-06-0606 June 1986 Summary of Operating Reactor Events Meeting 86-18 on 860602 Re Events Occurring Since 860519 Meeting.Attendee List, Events,Significant Elements of Events & Completion Dates for Assignments Encl ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20128K7491985-07-12012 July 1985 Summary of Operating Reactor Events Meeting 85-11 on 850701. List of Attendees,Events Discussed,Significant Elements of Events & Assignment of Followup Review Responsibility Encl ML20148C1311979-12-20020 December 1979 Summary of Meeting W/Mark II Owners Group in Bethesda,Md Re Status of Several long-term Program Tasks in Advance of Final Documentation.Agenda,List of Attendees & Viewgraphs Encl ML20213D0331979-08-22022 August 1979 Summary of 790717-18 Meeting W/Mark II Owners Group Re long-term Program Tasks ML20213C8911979-03-14014 March 1979 Summary of 790213-14 Meeting W/Mark II Owners Group Re Lead Plant Acceptance Criteria & Intermediate Plant Program Tasks ML20214G8691978-01-10010 January 1978 Summary of 770518-19 Meetings W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads Program ML20214G8451977-12-0202 December 1977 Summary of 770510 Meeting W/Mark II Owners Executive Committee Re Mark II Containment Dynamic Loads Program.List of Attendees & Viewgraphs Encl ML20214G8351977-11-29029 November 1977 Summary of 770401 & 0707 Meetings W/Mark II Owners & GE Re Methods for Combining Dynamic Loads for Structural Design of Mark II Containment.List of Attendees & Viewgraphs Encl ML20214G7951977-08-0202 August 1977 Summary of 770729 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Load Program ML20214G7841977-06-23023 June 1977 Summary of 770615 Meeting W/Utils & GE Re Mark II Containment Pool Dynamic Loads.List of Attendees Encl ML20214G7741977-06-0808 June 1977 Summary of 770526 Meeting W/Mark II Owners & GE Re Mark II Containment Pool Dynamic Loads.List of Meeting Attendees Encl ML20214G6951977-04-18018 April 1977 Summary of 770216-17 Meeting W/Mark II Owners,Ge & BNL Re Mark II Containment Pool Dynamic Load Support Program.List of Meeting Attendees & Viewgraphs Encl ML20214G4271976-12-29029 December 1976 Summary of 761202 Meeting W/Mark II Owners & GE Re Mark II Containment Structural Design & Pool Dynamic Loads Supporting Program.Attendee List & Viewgraphs Encl ML20214G4371976-12-0707 December 1976 Summary of 761027-28 Meetings W/Mark II Owners,Ge & BNL Re Pool Dynamic Loads Analytical Model & Test Program.Lists of Attendees & Viewgraphs Encl ML20214G4501976-06-0808 June 1976 Summary of 760429 Meeting W/Ge,Mark II Owners & Respective Aes Re GE 751105 Design Basis Document NEDE-21061, Mark II Containment Dynamic Forcing Function Info Rept (Dffr) ML20214G6031975-08-26026 August 1975 Summary of 750821 Meeting W/Mark II Owners,Sargent & Lundy, Bechtel,S&W & B&R in Bethesda,Md Re Load Factors & Load Combinations for Assessing Capability of Mark II Containments to Accommodate Safety/Relief Valve Loads ML20214G7791975-07-0303 July 1975 Summary of 750630 Meeting W/Mark II Owners,Aes & GE in Bethesda,Md Re Role of Mark II Owners,Status of Const of Various Mark II Units & Program for Determining Mark II LOCA & Safety/Relief Valve Loads 1997-02-13 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20205G312&oldid=3022282"