MONTHYEARML20196D0071999-06-16016 June 1999 Application for Amend to License DPR-35,changing TS Re Reactivity Control by Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8101999-05-11011 May 1999 Application for Amend to License DPR-35,requesting NRC Review & Approval of Change to TS Section 3/4.5.C, HPCI, Sys,Section 3/4.5.D, RCIC Sys & Bases Associated with Sections ML20206H9651999-05-0505 May 1999 Application for Amend to License DPR-35,modifying Licensing Basis for EDG on-site Diesel Fuel Storage Requirement & Corresponding TSs ML20203B5721999-02-0505 February 1999 Redacted Application for Amend to License DPR-35, Transferring FOL & Matls License 20-07626-04 from Boston Edison to Entergy Nuclear ML20202B4821999-01-21021 January 1999 Application for Amend to License DPR-35,using New Values for post-accident Containment Pressure in Plant NPSH Analyses Performed for ECCS Pumps.Calculations Supporting Request, Encl ML20198G5731998-12-21021 December 1998 Application for Amends to License DPR-35 & Matls License 20-07626-04,transferring PNPS from Boston Edison to Entergy Nuclear.Proprietary Info Encl.Proprietary Info Withheld. Pages 608 Through 621 of Incoming Submittal Not Included ML20249C7081998-06-26026 June 1998 Application for Amend to License DPR-35,correcting Typos & Updating Bases.Changes Are Considered Administrative ML20217H2681998-03-25025 March 1998 Application for Amend to License DPR-35,modifying Tech Specs 3.6.A.1 & 4.6.A.1 as It Pertains to Primary Sys Boundary, Thermal & Pressurization Limitations & Surveillance Requirements & Basis 3/4.6.A.Calculation Encl ML20203D4851998-02-20020 February 1998 Application for Amend to License DPR-35,to Change TS 3/4.5.B & Bases to Incorporate Ultimate Heat Sink Temperature 75 F, as Required by Amend 173.Request Fulfills Commitment to Submit TS Amend for UHS Temperature by First Quarter 1998 ML20203A0781998-02-11011 February 1998 Application for Amend to License DPR-35 UFSAR Section 10.7, Clarifying Design Basis for Salt Water Svc Water Sys BECO-LTR-97-107, Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed1997-10-24024 October 1997 Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed BECO-97-096, Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-14331997-09-19019 September 1997 Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-1433 BECO-LTR-97-002, Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld1997-01-24024 January 1997 Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld ML20135C1271996-11-26026 November 1996 Application for Amend to License DPR-35,modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consistent W/Lco 3/4.7.A.2.a.4 BECO-96-042, Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control1996-05-0101 May 1996 Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control ML20111B4121996-05-0101 May 1996 Application for Amend to License DPR-35,revising TS to Reflect Implementation of 10CFR50 App J,Option B ML20108C0781996-05-0101 May 1996 Application for Amend to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Util QA Manual ML20108C0261996-05-0101 May 1996 Application for Amend to License DPR-35 Re Core Alteration & LCO & Surveillance Conditions Associated W/Secondary Containment BECO-LTR-96-040, Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant1996-04-25025 April 1996 Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant BECO-95-074, Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 111995-07-14014 July 1995 Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078N4751995-02-0909 February 1995 Application for Amend to License DPR-35,increasing Reactor High Water Level Isolation Trip Level Setting BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-2011994-11-22022 November 1994 Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 ML20078K7881994-11-22022 November 1994 Application for Amend to License DPR-35 to TS Re Change to MSIV Leakage Requirement BECO-94-127, Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly1994-11-22022 November 1994 Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly BECO-94-126, Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days1994-11-22022 November 1994 Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days BECO-94-098, Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe1994-09-0606 September 1994 Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe ML20072S0741994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20072S0331994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Setpoint for Reactor Pressure to Isolate Shutdown Cooling Sys ML20072R9891994-09-0606 September 1994 Application for Amend to License DPR-35 Involving Proposed Administrative Change to TSs Re Control Room Annunciator. Amend Involves Relocation of Alarms for Drywell Suppression Vacuum Breakers ML20069M3181994-06-0909 June 1994 Application for Amend to License DPR-35,revising TS to Increase Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys.Proposed Change Also Made to Section 4.5.H, Maint Of...Discharged Pipe to Reflect Amend 149 ML20067B6941994-02-0909 February 1994 Application for Amend to License DPR-35,proposing Changes to TS by Revising Wording for Page 3 of License DPR-35,adding Clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion ML20058N0131993-12-10010 December 1993 Application for Amend to License DPR-35,proposing Changes to Ts,Re Request for Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20062J3311993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to Remove Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint BECO-93-133, Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors1993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors ML20046D0411993-08-0909 August 1993 Application for Amend to License DPR-35,proposing 24 Month Fuel Cycle ML20044G1251993-05-20020 May 1993 Application for Amend to License DPR-35,revising TS Re MSIV Turbine Inlet Low Pressure Setpoint to Reduce Potential Spurious Isolations Caused by Existing Higher Setpoint.Ge Repts MDE-70-0586 & NEDO-31296 Encl ML20128P3651993-02-11011 February 1993 Application for Amend to License DPR-35,changing TS to Increase Allowed Fuel Assembly Storage Cells from 2,320 to 3,859 & Changing Max Loads Allowed to Travel Over Spent Fuel Assemblies to 2,000 Lbs.Holtec Rept HI092925 Encl BECO-92-126, Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii)1992-10-30030 October 1992 Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii) BECO-92-121, Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time1992-10-23023 October 1992 Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time BECO-92-116, Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations1992-10-0808 October 1992 Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations BECO-92-101, Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.971992-08-17017 August 1992 Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.97 BECO-92-097, Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations1992-08-10010 August 1992 Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations BECO-92-079, Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions1992-07-24024 July 1992 Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions BECO-92-039, Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing1992-04-0808 April 1992 Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing BECO-92-012, Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests1992-02-0707 February 1992 Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests ML20086J5411991-12-0606 December 1991 Application for Amend to License DPR-35,revising Section 3/4.9, Auxiliary Electrical Sys,To Incorporate Surveillance for Inverters Associated W/Hpci & RCIC Sys BECO-91-136, Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO1991-10-24024 October 1991 Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO BECO-91-127, Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR1991-10-0707 October 1991 Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR BECO-91-076, Application for Amend to License DPR-35,revising Thermal & Pressurization Limit Curves of Tech Specs Figures 3.6.1 & 3.6.2 & Adding New Curve to Figure 3.6.3 to Cover Operation Between 10 & 32 Effective Full Power Years1991-06-11011 June 1991 Application for Amend to License DPR-35,revising Thermal & Pressurization Limit Curves of Tech Specs Figures 3.6.1 & 3.6.2 & Adding New Curve to Figure 3.6.3 to Cover Operation Between 10 & 32 Effective Full Power Years BECO-91-052, Revised Application for Amend to License DPR-35,changing Tech Spec Re Reactor Coolant Leakage Detection Sys at Plant1991-04-10010 April 1991 Revised Application for Amend to License DPR-35,changing Tech Spec Re Reactor Coolant Leakage Detection Sys at Plant 1999-06-16
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20196D0071999-06-16016 June 1999 Application for Amend to License DPR-35,changing TS Re Reactivity Control by Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8101999-05-11011 May 1999 Application for Amend to License DPR-35,requesting NRC Review & Approval of Change to TS Section 3/4.5.C, HPCI, Sys,Section 3/4.5.D, RCIC Sys & Bases Associated with Sections ML20206H9651999-05-0505 May 1999 Application for Amend to License DPR-35,modifying Licensing Basis for EDG on-site Diesel Fuel Storage Requirement & Corresponding TSs ML20203B5721999-02-0505 February 1999 Redacted Application for Amend to License DPR-35, Transferring FOL & Matls License 20-07626-04 from Boston Edison to Entergy Nuclear ML20202B4821999-01-21021 January 1999 Application for Amend to License DPR-35,using New Values for post-accident Containment Pressure in Plant NPSH Analyses Performed for ECCS Pumps.Calculations Supporting Request, Encl ML20198G5731998-12-21021 December 1998 Application for Amends to License DPR-35 & Matls License 20-07626-04,transferring PNPS from Boston Edison to Entergy Nuclear.Proprietary Info Encl.Proprietary Info Withheld. Pages 608 Through 621 of Incoming Submittal Not Included ML20249C7081998-06-26026 June 1998 Application for Amend to License DPR-35,correcting Typos & Updating Bases.Changes Are Considered Administrative ML20217H2681998-03-25025 March 1998 Application for Amend to License DPR-35,modifying Tech Specs 3.6.A.1 & 4.6.A.1 as It Pertains to Primary Sys Boundary, Thermal & Pressurization Limitations & Surveillance Requirements & Basis 3/4.6.A.Calculation Encl ML20203D4851998-02-20020 February 1998 Application for Amend to License DPR-35,to Change TS 3/4.5.B & Bases to Incorporate Ultimate Heat Sink Temperature 75 F, as Required by Amend 173.Request Fulfills Commitment to Submit TS Amend for UHS Temperature by First Quarter 1998 ML20203A0781998-02-11011 February 1998 Application for Amend to License DPR-35 UFSAR Section 10.7, Clarifying Design Basis for Salt Water Svc Water Sys BECO-LTR-97-107, Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed1997-10-24024 October 1997 Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed BECO-97-096, Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-14331997-09-19019 September 1997 Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-1433 BECO-LTR-97-002, Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld1997-01-24024 January 1997 Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld ML20135C1271996-11-26026 November 1996 Application for Amend to License DPR-35,modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consistent W/Lco 3/4.7.A.2.a.4 ML20108C0261996-05-0101 May 1996 Application for Amend to License DPR-35 Re Core Alteration & LCO & Surveillance Conditions Associated W/Secondary Containment BECO-96-042, Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control1996-05-0101 May 1996 Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control ML20111B4121996-05-0101 May 1996 Application for Amend to License DPR-35,revising TS to Reflect Implementation of 10CFR50 App J,Option B ML20108C0781996-05-0101 May 1996 Application for Amend to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Util QA Manual BECO-LTR-96-040, Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant1996-04-25025 April 1996 Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant BECO-95-074, Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 111995-07-14014 July 1995 Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078N4751995-02-0909 February 1995 Application for Amend to License DPR-35,increasing Reactor High Water Level Isolation Trip Level Setting BECO-94-126, Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days1994-11-22022 November 1994 Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days ML20078K7881994-11-22022 November 1994 Application for Amend to License DPR-35 to TS Re Change to MSIV Leakage Requirement BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-2011994-11-22022 November 1994 Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 BECO-94-127, Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly1994-11-22022 November 1994 Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly ML20072S0741994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20072S0331994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Setpoint for Reactor Pressure to Isolate Shutdown Cooling Sys ML20072R9891994-09-0606 September 1994 Application for Amend to License DPR-35 Involving Proposed Administrative Change to TSs Re Control Room Annunciator. Amend Involves Relocation of Alarms for Drywell Suppression Vacuum Breakers BECO-94-098, Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe1994-09-0606 September 1994 Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe ML20069M3181994-06-0909 June 1994 Application for Amend to License DPR-35,revising TS to Increase Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys.Proposed Change Also Made to Section 4.5.H, Maint Of...Discharged Pipe to Reflect Amend 149 ML20067B6941994-02-0909 February 1994 Application for Amend to License DPR-35,proposing Changes to TS by Revising Wording for Page 3 of License DPR-35,adding Clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion ML20058N0131993-12-10010 December 1993 Application for Amend to License DPR-35,proposing Changes to Ts,Re Request for Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20059J1651993-11-0404 November 1993 Corrected Amend 149 to License DPR-35,correcting Administrative Errors ML20062J3311993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to Remove Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint BECO-93-133, Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors1993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors ML20046D0411993-08-0909 August 1993 Application for Amend to License DPR-35,proposing 24 Month Fuel Cycle ML20044G1251993-05-20020 May 1993 Application for Amend to License DPR-35,revising TS Re MSIV Turbine Inlet Low Pressure Setpoint to Reduce Potential Spurious Isolations Caused by Existing Higher Setpoint.Ge Repts MDE-70-0586 & NEDO-31296 Encl ML20128P3651993-02-11011 February 1993 Application for Amend to License DPR-35,changing TS to Increase Allowed Fuel Assembly Storage Cells from 2,320 to 3,859 & Changing Max Loads Allowed to Travel Over Spent Fuel Assemblies to 2,000 Lbs.Holtec Rept HI092925 Encl ML20127P5311993-01-25025 January 1993 Amend 145 to License DPR-35,revising TS SRs for Station Batteries by Replacing Rated Load Discharge Test W/Svc Discharge Test once-per-cycle & Performance Discharge Test Every Five Yrs BECO-92-126, Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii)1992-10-30030 October 1992 Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii) BECO-92-121, Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time1992-10-23023 October 1992 Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time BECO-92-116, Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations1992-10-0808 October 1992 Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations BECO-92-101, Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.971992-08-17017 August 1992 Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.97 BECO-92-097, Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations1992-08-10010 August 1992 Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations BECO-92-079, Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions1992-07-24024 July 1992 Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions BECO-92-039, Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing1992-04-0808 April 1992 Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing BECO-92-012, Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests1992-02-0707 February 1992 Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests ML20086J5411991-12-0606 December 1991 Application for Amend to License DPR-35,revising Section 3/4.9, Auxiliary Electrical Sys,To Incorporate Surveillance for Inverters Associated W/Hpci & RCIC Sys BECO-91-136, Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO1991-10-24024 October 1991 Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO BECO-91-127, Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR1991-10-0707 October 1991 Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR 1999-06-16
[Table view] |
Text
a
.. ~..
10CFR50.90 eosrwasm Executive Offices 800 Boylston street Boston, Massachusetts 02199 BECo 88- 102.
Ralph G. Bird Proposed Change 88- 03 senior Vice President - Nuclear June 30, 1988 U. S. Nuclear Regulatory Commission Document' Control Desk Hashington, DC 20555 License DPR-35 Docket 50-293 PROPOSED TECHNICAL SPECIFICATION CHANGE DEGRADED VOLTAGE TRIP AND ALARH SETPOINTS
Dear Sir:
Pursuant to 10CFR50.90, Boston Edison Company (BECo) proposes the following revisions to Facility Operating License No. OPR-35, Appendix A. The requested change is to Technical Specification Trip and Alarm setpoints for degraded voltage protection.
An application fee of one hundred and fifty dollars ($150.00) will be electronically transferred to your offices in accordance with the requirements of 10CFR Part 170.12(c).
d GGH/jcp/1894 Attachments 1 signed original and 37 copies cc: See next page Commonwealth of Massachusetts) e :" County of Suffolk )
Then personally appeared before me, Ralph G. Bird, who being duly sworn, did a state that he is Senior Vice President - Nuclear of Boston Edison Company and o@8 that he is duly authorized to execute and file the submittal contained herein ggo- in the name and on behalf of Boston Edison Company and that the statements in gg said submittal are true to the best of his knowledge and belief.
8d My comm /e's: fPR 0 31992 '
]j/ kk "
88 .c e . ' .,' c DATE NOTARY PUBLIC 8" a'ly *W' o.,a c. m., b*oi )
k c.y ij tw., rn , ;
.(
@@o, Mr Commission Empires April 3,1992 e
f,g:
f?y p\
BOSTOM EDISON COMPANY U.S. Nuclear Regulatory Commission Page 2 cc: Mr. D. Mcdonald, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Station P1-137 Hashington, DC 20555 U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 NRC Senior Resident Inspector j Pilgrim Nuclear Power Station o
l Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd Floor Boston, MA 02111 l
l i
l l
1 l
l l-t
l ATTACHMENT A TO BECO LETTER 88-102 Proposed Technical Specification Change to Dearaded Voltage Trio and Alarm Setooints Proposed Changes:
On page 49. Table 3.2.B; instrumentation that Initiates or Controls the Core and Containment Coolina Systems Change the Remarks for the Core Spray and LPCI Pump Start Times From: "In conjunction with loss of power initiates sequential starting of CSCS pumps."
To: "Initiates sequential starting of CSCS pumps on any auto l start.
t On page 50a, Table 3.2.B; Instrumentation That Initiates or Controls The Core And Containment Cooling Systems Change Trio Level Settina From: 3745V i 2%
To: 3868V i 0.5%
l On page 53a, Table 3.2.B.1; Instrumentation That Monitors Emeraency Bus Voltage Change setting L From: 3850V i 2%
To: 3959V 0.5%
Add to the Remarks, on page 53a "Provides permissive to initiate load shedding in conjunction with LOCA signal."
On page 197, Section 3.9.B.6; Ooeration Hith Inocerable Eauiomeat Change that portion of the first sentence in Section 3.9.B.6 l
l From: "less that 3950 but above 3745" l
l To: "less than 3959V but above 3868V" l
l 1
1 l
l
Attachment A to BECo Letter 88-102 l
Reason for Cleange A recent sel f-ini tiated effort to improve inhouse analysis capability for electrical power distribution system (EPDS) design and control identified the ,
need to change the trip and alarm setpoints for the PNPS degraded voltage l relays. The existing setpoints are based on an incorrect assumption made in 1976 that, if 4160V and 480V load center buses do not fall below 90% rated l voltage, the voltage supplied to the end equipment would be greater than the l equipment manufacturer's recommended minimum values. LER 88-003-00, "Low i Setpoints of Degraded Grid Voltage Relays due to Error in Model Used in l Analysis" dated Feb. 29, 1988, provided written notification of this discovery l and listed as corrective actions additional analysis to determine the correct !
setpoints and to propose technical specification changes accordingly. l The attached proposed changes to the degraded voltage trip and alarm setpoints have been determined as the result of additional analysis of the EPDS for i PNPS. The study indicated the trip setpoint should be set at 3868V 0.5% in l order that the safety related devices on the worse case motor control center I to have sufficient voltage for proper and safe operation. The alarm setpoint should be set at 3959 1 0.5% to allow for required operator action and permit load s'edding when required during a LOCA. The installation of newer, more reliable, and higher quality solid state relays allows the revised setpoints j and tolerances to be used.
l l The proposed degraded voltage trip setpoint of 3868V, with a tolerance of 0.5%, yields 3849V as the lowest allowed trip setpoint. This setpoint provides adequate margin over the minimum bus voltage which assures the l adequacy of the 480V power supply. The corrected degraded voltage trip setpoint calculations indicated a 480V motor control center voltage of 434V l will occur when the 4KV bus is at 3849V (assuming worse case LOCA loading I conditions with load shedding initiated). This provides 4V of margin over the corrected mininum acceptable voltage of 430V.
, Based on this trip setpoint the relays will reset at a maximum of 3907 volts.
t This voltage is the 4160V bus voltage that corresponds to a switchyard voltage of 340 KV under maximum LOCA loading with load shedding initiated. The 340 KV switchyard voltage is the minimum switchyard voltage expected after a trip.
The degraded voltage alarm relay is also being used to enable load shedding on the safety related buses. The proposed degraded voltage alarm setpoint of 3959V, with a tolarance of i 0.5%, yields 3939V as the lowest allowed alarm setpoint. This setpoint provides adequate margin over the minimum bus voltage which assures the adequacy of the 480V power supply. The corrected degraded voltage alarm setpoint calculation indicated that, with worse case LOCA loading conditions, but without load shedding initiated, a 480V bus voltage of 434V will result when there is 3939V on the 4KV bus. Therefore, if 4KV bus voltage drops below the lowest allowed alarm setpoint, load shedding must be initiated to assure the adequacy of the 480 V power supply when a signal indicating a LOCA is received.
2
1 Attachment A to BECo Letter 88-102 l
-During conditions when the plant is being supplied from the startup transformer, and supply voltage remains below the degraded voltage trip setpoint for longer than 9.2 seconds; 1) the startup transformer supply breakers for both safety related 4160V buses are opened, 2) the safety-related buses are deenergized, and 3) the diesel generators are started. Ten seconds after the bus is deenergized, if the diesel generator is within acceptable speed and voltage, the diesel supply breaker closes to supply its safety-related buses. Required safety-related equipment will then 4equence onto the diesels. Conversely, during conditions where the plant is being supplied from the startup transformer, and supply voltage does not remain .
below the degraded voltage setpoint for longer than 9.2 seconds, the 4160V safety-related buses remain energized from the startup transformer at the voltage the startup transformer is supplying. This voltage may be only slightly above the degraded voltage setpoint; however, with the existing 3745V setpoint, safety-related end devices will not have adequate voltage to operate properly. The degraded voltage setpoints are, therefore, being raised to assure the supply voltage to safety-related equipment remains adequate under l this operating condition.
l During conditions wheie the plant is being supplied from the startup transformer and the supply voltage remains below the alarm setpoint for 9.2 seconds an alarm will result. In addition, alarm relay contacts in the load shed logic will close prov' ding a permissive for load shedding i f a LOCA occurs.
Coincident with the proposed setroint changes, we are performing the following modifications under 10CFR50.59:
- 1. Installation of new degraded voltage relayr with improved sensitivity (pick-up to drop-out ratio) to accommodate higher trip and alarm setpoints. Except for the use of the alarm relay contacts in the load shed Icgic, the new relays will use the same wiring to perform the same function as original design.
- 2. Change to the load shedding logic that would activate the same load shedding sequence for LOCA conditions when on the startup transformer as when on the diesel generator (existing design). This load shedding, when I initiated by a LOCA signal, will occur only when the EPDS voltage is below the degraded voltage alarm setting (nominal 3959 V i 0.57.).
In addition to the logic changes, we have provided the following:
A. Addition of load shedding alarms for improved operator information.
- 8. Removal of Feedwater Pump Auxiliary Lube 011 Pump from load shedding under all conditions to improve availability of the Feedwater System.
- 3. Sequencing of Core Spray and P.HR pump motors to prevent large voltage drops during motor starting for all LOCA conditions whether on startup transformer (added) or on the diesel generators or shutdown transformer (existing design).
- 4. Relccate the station heating water pumps and station hot water boilers from the safety-related buses to non-safety related buses.
3 i
t . _ . - . .. -. - . . _ . .- - - - . .-
Attachment A to BECo Letter 88-102 Other technical specification changes being proposed are desired to maintain continuity within the technical specifications. For example, the "Remarks" portion of pages 49 and 53a are similar to the "Bases" sections of Technical Specifications and are provided for operator information. These "Remarks" are being reworded to provide the operators with a more detal ed description of the load shedding logic associated with the degraded voltage relays.
Also, the alarm setpoint on page 197, section 3.9.8.6, is being changed to reflect the new setpoint. The remainder of the action statement is unchanged (directing the operator to transfer the safety-related buses to the diesel generators when safety bus voltage drops below the degraded voltage alarm setpoint, but above the degraded voltage trip setpoint). This action allows a conservative range for paralleling the diesel generators to the safety-related 4160V buses when powered from the Unit Auxiliary Transformer to preclude both: a) damaging safety-related equipment by operation under sustained degraded voltage, and b) connecting the diesel generator to a severely degraded electrical power grid system.
Safety Evaluation and Determination of No Sianificant Hazards Considerations 10CFR50.91 requires that at the time a licensee requests an amendment, it must provide to the Commission its analysis using the standards in 10CFR50.92, to determine no significant hazards considerations. In accordance with 10CFR50.91, we have performed an analysis for the proposed degraded voltage setpoint changes and their effect on the following affected safety systems:
- 1) Auxiliary Power Distribution System (APDS)
The purpose of the degraded voltage protection relays is to ensure safety-related equipment requiring power from the APDS is supplied sufficient voltage to ensure proper operation and to preclude equipment ddmage.
If the Startup Transformer secondary voltage drops below the degraded voltage trip setpoint, and stays for more than 9.2 seconds, the safety-related buses will trip and be loaded onto the diesel generators. Also , if the startup transformer secondary voltage drops below the degraded voltage alarm voltage setpoint and stays for more than 9.2 seconds during a LOCA when operating from the startup trans former, the existing diesel generator load shed logic will be initiated. This will reduce station loading sufficiently to maintain acceptable 480 volt bus voltage down to the degraded voltage trip setpoint discussed above. The 9.2 second time delay for the alarm relays are the same as the trip relays.
The 9.2 second time delay on the trip and alarm relays has not been changed. Since only the voltage setpoints and associated tolerances of the relays are being changed, the response of the degraded voltage relays to degraded voltage is essentially unchanged from the original design.
Initiation of load shed logic when operating on the startup transformer l when the 4KV bus voltage is below the alarm setpoint trips '
non-essential loads and sequences the restart of safety-related loads required to mitigate the consequences of a LOCA. Initiation of load 4
l 1
Attachment A to BECo Letter 88-102 shedding when on the diesel generator or shutdown transformer is included in the existing design basis. Therefore, the safety performance of the APDS is not reduced.
Raising the degraded voltage setpoints and- using tighter, more
, conservative setpoint tolerances does not affect the operation of I safety-related equipment as relied upon in the accident analysis other than its initiation at a higher voltage which ensures the voltage at the safety-related devices continues to be maintained above the voltage where proper operation can be assured.
- 2) Standby AC Power Source (Diesel Generators)
The degraded voltage trip signal will start both Diesel Generators
- after the Startup and Unit Auxiliary supply breakers to A5 and A6 are l opened.
l l An analysis was performed to determine the probability of Pilgrim l experiencing a sustained degraded voltage condition. The study identified an approximate 47. probability that grid voltage could degrade to below 340KV, with an expected duration of 2.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, thus leading to an automatic diesel start. This event assumes that a number of major generators on the grid, as well as Pilgrim, are off the line due to forced outages. Assuming 1988 peak loading conditions, this is equivalent to about one additional automatic diesel start in 25 years.
Another condition analyzed was if the regional electric power pool alerted Boston Edison of an existing grid condition where the 345KV line could drop below 340KV if Pilgrim were to experience a forced outage. To preclude this occurrence, when notified we would use existing station procedures to manually start and maintain the diesels in standby. The probability of a precautionary start of Pilgrim's l diesels is about one additional start every four years.
l Weighing the negligible impact of diesel generator start on diesel generator availability against the negative impact of degraded voltage on safety-related components, we conclude overall plant safety is not significantly impacted by raising the degraded voltage trip and alarm setpoints.
- 3) Core Spray System (CSS)
The Core Spray pump time delay of 1/3rd second, imposed when the CSS is powered by the diesel generators or shutdown transformer, is now
, imposed when the system is on the startup transformer. Therefore, the l 1/3rd second time delay will be initiated on any automatic pump start.
This modification is being made to support the revised degraded voltage setpoints. As this time delay of 1/3rd seconds is the same as that
- assumed in the LOCA analysis for operation of the Core Spray System l
from the diesel generators or shutdown transformer, the safety performance of the Core Spray System is not affected.
5
Attachment A to BECo Letter 88-102
- 4) Residual Heat Removal (RHR) l A 5 second time delay will be imposed on any automatic start of A&B RHR l pumps and a 10 second time delay will be imposed on any automatic start i of C&D RHR pumps. l I
This modification is being made to support the revised degraded voltage I setpoints. As these delays of 5 seconds and 10 seconds are the same as those currently assumed in the LOCA analysis for operation of the RHR System from the diesel generators or shutdown transformer, the safety 1 performance of the RHR system is not affected. '
In summary, this proposed amendment does not create a significant hazards 1 consideration because:
- 1. The proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
Raising the degraded voltage setpoints does not affect the operation of r equipment relied on in the accident analysis because the voltage at the l safety-related devices continues to be maintained above the voltage i where proper operation can be assured. l The proposed changes are being made to maintain the existing protection provided by the degraded voltage protection relays. Previously evaluated performance of safety systems will not be degraded by raising the degraded voltage trip and alarm setpoints.
- 2. The proposed amendment will not create the possibility of a new or I different kind of accident from any accident previously evaluated. It
( is concluded from the above system ev&luations that the proposed
! degraded voltage setpoints do not change any accident analyses l previously evaluated for the affected systems. Safety-related I equipmerrt continues to be provided adequate voltage to perform their l intended safety functions.
- 3. The proposed amendment will not involve a significant reduction in the margin of safety. For the reasons stated in one and two above and in the individual systems analyses in this section, it is concluded that the proposed changes do not alter or remove other existing technical specifications and do not reduce the margin of safety for equipment relied on in the accident analysis.
l This change has been reviewed and recommended for approval by the Operations Review Committee, and reviewed by the Nuclear Safety Review and Audit Committee.
l l Schedule of Chanae ~
l This change will be put into effect upon receipt of approval by the NRC.
l l
l l 6 l
. . - --__. .