Proposed Tech Specs Changing Util License Condition 2.C(36)
ML20150B122
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/01/1988
From:
SYSTEM ENERGY RESOURCES, INC.
To:
Shared Package
ML20150B120 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, NUDOCS 8807110306
Download: ML20150B122 (2)


Text

..

y ,, ) ,

l

. November 1, 1984 Attachment 1 SERI shall complete the following requirements on the schedule noted below:

Emergency Response Facilities (Generic Letter 82-33, NUREG-0737 Supplement 1. SSER #5)

SERI shall implement the specific items below, in the manner described in MP&L letter (AECM-83/0232) dated April 15, 1983, as modified in MP&L letter (AECM-83/0486) dated August 22, 1983, no later than the folicwing specified dates:

(a) Safety Parameter Display System (SPDS)

(1) Submit a safety analysis and an implementation July 1985 plan to the NRC (2) SPDS fully operational and operators trained Prior to startup following first refueling outage (b) Detailed Control Room Design Review (DCRDR)

( (1) Submit a program plan to the NRC December 1984 (2) Submit a summary report to the NRC including July 1986 a proposed schedule for implementation (c) Regulatory Guide 1.97 - Application to Emergency Response Facilities (1) Submit a report to the NRC describing how the February 1985 requirements of Supplement I to NUREG-0737 have been or will be met.

(2) Implement (installation or upgrado) Prior to startup requirements of R.G.1.97 with the exception following first of flux monitoring and coolant level monitoring. refueling outage.

, (3) Implement (installation or upgrade) Prior to startup

requirements of R.G.1.97 for coolant level following second monitoring. refueling outage.

(4) Implement (installation or upgrade) .

>' Prior to s rtu requirements of R.G. 1.97 for flux monitoring. followin refueling o _ _

(d) Upgrade Emergency Operating Procedures (EOP's)

(1) Submit a Procedures Generation Package to the April 1985 l ($d NRC l

Amendment No. 37 l SF-OL - 17 l$k71[ $ $$ $ {16

. ?L ,

\

, e ,

Attachment 2 to AECM-88/0110 TENTATIVE SCHEDULE FOR INSTALLATION OF INCORE NEUTRON MONITORING SYSTEM MILESTONE SCHEDULE

1) Evaluate alternate incore system June - September 1988 vendors for plant enhancement and R.G. 1.97 compliance. Establish incore system design requirements and number of instrument channels

! 2) Issue bid specification for incore October 1988 l system (as appropriate)

3) Evaluate and award contract for December 1988 incore system (as appropriate)
4) Perform detailed engineering and January - June 1989 design based on selected incore System (including evaluation of DW access 6t RF03 for design and installation considerations)
5) Obtain NRC Safety Evaluation Report February 1989 on generic incore system design (i.e., NED0 31439)
6) Issue purchase specification for July 1989 incore hardware
7) Develop and issue design change package July 1989 - Fd aars 1990 for GGNS installation of incore system
8) Submit GGNS Technical Specification October if >

change request for associated neutron monitoring system modification

9) Obtain NRC approval of GGNS Technical F .ch 1990 Specification changes
10) Receive incore hardware onsite for May 1990 RF04 installation I 11) Install incore system at fourth GGNS August 1990 refueling outage l

J12AECM88052401 - 6

_ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ -