ML20189A114
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/29/2020
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20189A066 List:
References
RA-20-0136
Download: ML20189A114 (5)


Text

Oconee Nuclear Station UFSAR Appendix 18A. Tables Appendix 18A. Tables

Oconee Nuclear Station UFSAR Table 18-1 (Page 1 of 4)

Table 18-1. Summary Listing of the Programs, Activities and TLAA Topic Program/Activity or UFSAR/ITS/SLC TLAA Location Alloy 600 Aging Management Program Program/Activity 18.3.1 Auxiliary Building Ventilation Inspection Program/Activity 18.3.17.18 Battery Rack Inspections Program/Activity ITS:

SR 3.8.1.11, SR3.8.3.3, SR 3.10.1.10 18.3.26 Boric Acid Corrosion Control Program Program/Activity 18.3.10 Cast Iron Selective Leaching Inspection Program/Activity 18.2.1 Chemistry Control Program Program/Activity 18.3.2 ITS 5.5.14 ITS 3.10.1.8 Chilled Water Refrigeration Unit PM Program/Activity 18.3.17.2 Coatings Program Program/Activity 3.8.1.1.1 6.2.1.6 18.3.17.1 18.3.17.5 Containment Inservice Inspection Plan Program/Activity 18.3.3 ITS 3.6.1 B3.6.1 5.5.7 SLC 16.6.2 Containment Leak Rate Testing Program Program/Activity ITS 5.5.2 3.6.1 B3.6.1 SLC 16.6.1 Containment Liner Plate and Penetrations - TLAA 3.8.1.5.3 Thermal Cycles Containment Post-Tensioning System - TLAA 3.8.1.5.2 Prestress Loss 16.6.2 18.3.3 Control Rod Drive Mechanism Nozzle and Program/Activity 18.3.1.2 Other Vessel Closure Penetrations Inspection Program Control Room Pressurization & Filtration Program/Activity 18.3.17.19 Inspection Control Room Ventilation System Program/Activity 18.3.17.6 Examination (31 DEC 2014)

Oconee Nuclear Station UFSAR Table 18-1 (Page 2 of 4)

Topic Program/Activity or UFSAR/ITS/SLC TLAA Location Crane Inspection Program Program/Activity 18.3.5 Cranes and Control of Heavy Loads TLAA 3.12 Duke Power Five-Year Underwater Program/Activity 18.3.6 Inspection of Hydroelectric Dams and Appurtenances Elevated Water Storage Tank Inspection Program/Activity 18.3.7 Environmental Qualification of Electrical TLAA 3.11 Equipment Federal Energy Regulatory Commission Program/Activity 18.3.8 (FERC) Five Year Inspections Fire Protection Program Program/Activity 16.9.1, 16.9.2, 16.9.4, 16.9.5, 18.3.17.8 Flow Accelerated Corrosion Program Program/Activity 18.3.9 Deleted Row per 2012 Update Galvanic Susceptibility Inspection Program/Activity 18.2.2, 18.3.21 Generator Stator Water Cooler Inspection Program/Activity 18.3.17.23 Heat Exchangers Program/Activity 18.3.11 18.3.17.3 18.3.17.4 18.3.17.7 18.3.17.9 18.3.17.11 18.317.12 18.3.17.13 18.3.17.15 Inservice Inspection Plan Program/Activity 18.3.12 5.2.3.12.4 SLC 16.9.18 Inspection Program for Civil Engineering Program/Activity 18.3.13 Structures and Components Insulated Cables and Connections Aging Program/Activity 18.3.14 Management Program Keowee Air and Gas Systems Inspection Program/Activity 18.2.3, 18.3.21 Keowee Oil Sampling Program Program/Activity 18.3.15 Keowee Turbine Generator Cooling Water Program/Activity 18.3.17.10 Strainer PM (31 DEC 2014)

Oconee Nuclear Station UFSAR Table 18-1 (Page 3 of 4)

Topic Program/Activity or UFSAR/ITS/SLC TLAA Location Keowee Turbine Guide Bearing Oil Cooler Program/Activity 18.3.17.22 Examination Keowee 230 kV Transmission Line Program/Activity 18.3.24 Inspections Non-Class 1 Piping - Thermal Cycles TLAA 3.2.2.2 Once Through Steam Generator Upper Program/Activity 18.2.4 Lateral Support Inspection Penetration Room Ventilation System Program/Activity 18.3.17.20 Inspection Penstock Inspection Program/Activity 18.3.16 Pressurizer Examinations and Inspections Program/Activity 18.2.5 18.2.5.1 18.2.5.2 18.3.1.3 Preventive Maintenance Activities Program/Activity 18.3.17 Program to Inspect High Pressure Injection Program/Activity 18.3.18 Connections to the Reactor Coolant System Reactor Building Cooling System Inspection Program/Activity 18.3.17.17 Reactor Building Purge System Inspection Program/Activity 18.3.17.21 Reactor Building Spray System Inspection Program/Activity 18.2.6 Reactor Coolant Pump Flywheel Inspection Program/Activity ITS 5.5.8 Program 5.4.4.3.2 18.3.25 Reactor Coolant Pump Motor Oil Collection Program/Activity 18.2.7 System Inspection Reactor Coolant System and Class 1 TLAA 5.2.1.4 Components (include leak-before-break) 18.4 (Oconee Thermal Fatigue Management Program)

Reactor Coolant System Operational Program/Activity ITS 3.4.13 Leakage Monitoring ITS 3.4.15 SLC 16.11.3 (31 DEC 2014)

Oconee Nuclear Station UFSAR Table 18-1 (Page 4 of 4)

Topic Program/Activity or UFSAR/ITS/SLC TLAA Location Reactor Vessel Integrity Program TLAA 5.2.3.3.2 Program/Activity 5.2.3.3.3 5.2.3.3.4 5.2.3.3.5 5.2.3.3.6 5.2.3.3.10 5.2.3.3.11 18.3.19 18.4 Reactor Vessel Internals TLAA 4.5.1.2 18.4 Reactor Vessel Internals Inspection Program/Activity 18.3.20 Service Water Piping Corrosion Program Program/Activity 18.3.21, 18.2.2, 18.2.3 Small Bore Piping Inspection Program/Activity 18.2.8 Spent Fuel Rack Boraflex None 9.1.2.5 SSF - Diesel Fuel Oil Storage Tank Program/Activity 18.3.17.14 Inspection Standby Shutdown Facility HVAC Inspection Program/Activity 18.3.17.16 Steam Generator (SG) Program Program/Activity ITS 5.5.10 ITS 3.4.16 18.3.27 System Performance Testing Activities Program/Activity 18.3.22 Tendon - Secondary Shield Wall - Program/Activity 18.3.23 Surveillance Program ITS 5.5.7 Treated Water Systems Stainless Steel Program/Activity 18.2.9 Inspection (31 DEC 2014)