list | - Information Notice 2012-01, Seismic Considerations--Principally Issues Involving Tanks (26 January 2012, Topic: Functionality Assessment, Earthquake)
- Information Notice 2012-02, Potentially Nonconservative Screening Value for Dam Failure Frequency in Probabilistic Risk Assessments (5 March 2012, Topic: Ultimate heat sink, Probabilistic Risk Assessment, Earthquake, Generic Issues Program)
- Information Notice 2012-02, Potentially Nonconservative Screening Value For Dam Failure Frequency In Probabilistic Risk Assessments (5 March 2012, Topic: Ultimate heat sink, Probabilistic Risk Assessment, Earthquake, Generic Issues Program)
- Information Notice 2012-03, Design Vulnerability in Electric Power System (1 March 2012, Topic: Offsite Circuit)
- Information Notice 2012-03, Design Vulnerability In Electric Power System (1 March 2012, Topic: Anticipated operational occurrence, Offsite Circuit)
- Information Notice 2012-04, Impacts on Normal Plant Operations Due to Leaks or Spills of Chemicals (19 April 2012)
- Information Notice 2012-05, Abnormal Releases of Radioactive Water Potentially Resulting in Groundwater Contamination (25 April 2012, Topic: Coatings)
- Information Notice 2012-06, Ineffective Use of Vendor Technical Recommendations (24 April 2012, Topic: Hydrostatic, Preliminary White Finding)
- Information Notice 2012-07, Tube-to-Tube Contact Resulting in Wear in Once-Through Steam Generators (17 July 2012, Topic: Nondestructive Examination)
- Information Notice 2012-08, High Dose-Rate Remote Afterloader (Hdr) Physical Presence Requirements (10 April 2012, Topic: Enforcement Discretion)
- Information Notice 2012-08, High Dose-Rate Remote Afterloader (HDR) Physical Presence Requirements (10 April 2012, Topic: Enforcement Discretion)
- Information Notice 2012-09, PWROG-16043-NP-A, Revision 2, PWROG Program to Address NRC Information Notice 2012-09: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength for Westinghouse and CE PWR Fuel Designs. (30 November 2019, Topic: Anticipated operational occurrence, Safe Shutdown Earthquake, Earthquake)
- Information Notice 2012-10, Recent Issues Associated with Submittal of NRC Form 396, Certification of Medical Examination by Facility Licensee, for Applicants and Licensed Operators at Non-Power Reactors (16 July 2012)
- Information Notice 2012-10, Recent Issues Associated With Submittal Of NRC Form 396, Certification Of Medical Examination By Facility Licensee, For Applicants And Licensed Operators At Non-Power Reactors (16 July 2012)
- Information Notice 2012-11, Age Related Capacitor Degradation (23 July 2012)
- Information Notice 2012-12, HVAC Design Control Issues Challenge Safety System Function (24 July 2012, Topic: Unanalyzed Condition, Enforcement Discretion)
- Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool (10 August 2012)
- Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool (10 August 2012)
- Information Notice 2012-14, Motor-Operated Valve Inoperable Due To Stem-Disc Separation (24 July 2012, Topic: Safe Shutdown, Incorporated by reference)
- Information Notice 2012-14, Motor-Operated Valve Inoperable Due to Stem-Disc Separation (24 July 2012, Topic: Safe Shutdown, Incorporated by reference)
- Information Notice 2012-15, Use of Enclosures to Mitigate Leakage from Joints That Use A-286 Bolts (9 August 2012, Topic: Boric Acid, Liquid penetrant)
- Information Notice 2012-15, Use of Enclosures to Mitigate Leakage From Joints That Use A-286 Bolts (9 August 2012, Topic: Boric Acid, Liquid penetrant)
- Information Notice 2012-16, Preconditioning of Pressure Switches Before Surveillance Testing (29 August 2012)
- Information Notice 2012-17, Certified Material Test Reports and Age Hardened Concrete Compressive Strength (6 September 2012, Topic: Internal Flooding, Earthquake)
- Information Notice 2012-19, License Renewal Post-Approval Site Inspection Issues (23 October 2012, Topic: Aging Management)
- Information Notice 2012-20, Potential Chloride-Induced Stress Corrosion Cracking of Austenitic Stainless Steel and Maintenance of Dry Cask Storage System Canisters (14 November 2012, Topic: Boric Acid, Aging Management, Fuel cladding, Backfit)
- Information Notice 2012-21, Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup (10 December 2012, Topic: Unanalyzed Condition, Hydrostatic)
- Information Notice 2012-22, Rev. 1 - Counterfeit, Fraudulent, Suspect Item Training Offerings (20 November 2019)
- Information Notice 2012-25, Performance Issues with Seismic Instrumentation and Associated Systems for Operating Reactors (1 February 2013, Topic: Safe Shutdown Earthquake, Operating Basis Earthquake, Earthquake)
|
---|