Similar Documents at Hatch |
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20140E2991997-06-0202 June 1997 Proposed Criteria for ECCS Strainer Design,Technical Evaluation Rept L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 21996-12-31031 December 1996 Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 ML20086G5161995-06-29029 June 1995 Technical Evaluation Rept on Individual Plant Exam Front End Analysis ML20086G5211994-12-31031 December 1994 Technical Evaluation Rept on Individual Plant Exam Back-End Analysis ML20086G5281994-11-30030 November 1994 Technical Evaluation Rept on Individual Plant Exam Human Reliability Analysis ML20079S0781994-09-26026 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2 ML20045A5211993-05-31031 May 1993 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power Station ML20058H5991990-11-15015 November 1990 Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing ML19325C1401989-06-20020 June 1989 Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26. ML20235L5621987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal Rept ML20215M2121987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept ML20214Q8981987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept ML20204G3921986-08-0101 August 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept ML20210L2711986-04-30030 April 1986 Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20142A1201986-01-0909 January 1986 SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2 ML20132D1871985-06-30030 June 1985 Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2 ML20127N6311985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2 ML20102A7931985-01-31031 January 1985 Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2 ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20080N4631983-09-30030 September 1983 Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts ML20080K6341983-09-27027 September 1983 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20091D5961983-07-31031 July 1983 Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping Sys ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept ML20151H2421982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20063C7431982-06-25025 June 1982 Masonry Wall Design, Technical Evaluation Rept ML20062B2991982-06-0707 June 1982 Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2 ML20050S9651982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20041D2271982-01-31031 January 1982 Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept ML20041D2291982-01-31031 January 1982 Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept ML20041D2331982-01-31031 January 1982 Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20040D1291981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20040D1281981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20008F7911981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981 ML19247E1981981-02-28028 February 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept ML19331C9041980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept ML20055A4361980-02-28028 February 1980 Electrical,Instrumentation & Control Sys Support, Interim Rept ML20236N8341978-11-30030 November 1978 Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977 1997-06-02
[Table view] Category:QUICK LOOK
MONTHYEARML20140E2991997-06-0202 June 1997 Proposed Criteria for ECCS Strainer Design,Technical Evaluation Rept L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 21996-12-31031 December 1996 Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 ML20086G5161995-06-29029 June 1995 Technical Evaluation Rept on Individual Plant Exam Front End Analysis ML20086G5211994-12-31031 December 1994 Technical Evaluation Rept on Individual Plant Exam Back-End Analysis ML20086G5281994-11-30030 November 1994 Technical Evaluation Rept on Individual Plant Exam Human Reliability Analysis ML20079S0781994-09-26026 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2 ML20045A5211993-05-31031 May 1993 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power Station ML20058H5991990-11-15015 November 1990 Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing ML19325C1401989-06-20020 June 1989 Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26. ML20235L5621987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal Rept ML20215M2121987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept ML20214Q8981987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept ML20204G3921986-08-0101 August 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept ML20210L2711986-04-30030 April 1986 Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20142A1201986-01-0909 January 1986 SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2 ML20132D1871985-06-30030 June 1985 Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2 ML20127N6311985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2 ML20102A7931985-01-31031 January 1985 Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2 ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20080N4631983-09-30030 September 1983 Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts ML20080K6341983-09-27027 September 1983 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20091D5961983-07-31031 July 1983 Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping Sys ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept ML20151H2421982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20063C7431982-06-25025 June 1982 Masonry Wall Design, Technical Evaluation Rept ML20062B2991982-06-0707 June 1982 Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2 ML20050S9651982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20041D2271982-01-31031 January 1982 Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept ML20041D2291982-01-31031 January 1982 Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept ML20041D2331982-01-31031 January 1982 Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20040D1291981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20040D1281981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20008F7911981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981 ML19247E1981981-02-28028 February 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept ML19331C9041980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept ML20055A4361980-02-28028 February 1980 Electrical,Instrumentation & Control Sys Support, Interim Rept ML20236N8341978-11-30030 November 1978 Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977 1997-06-02
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20140E2991997-06-0202 June 1997 Proposed Criteria for ECCS Strainer Design,Technical Evaluation Rept L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 21996-12-31031 December 1996 Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 ML20086G5161995-06-29029 June 1995 Technical Evaluation Rept on Individual Plant Exam Front End Analysis ML20086G5211994-12-31031 December 1994 Technical Evaluation Rept on Individual Plant Exam Back-End Analysis ML20086G5281994-11-30030 November 1994 Technical Evaluation Rept on Individual Plant Exam Human Reliability Analysis ML20079S0781994-09-26026 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2 ML20045A5211993-05-31031 May 1993 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power Station ML20058H5991990-11-15015 November 1990 Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing ML19325C1401989-06-20020 June 1989 Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26. ML20235L5621987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal Rept ML20215M2121987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept ML20214Q8981987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept ML20204G3921986-08-0101 August 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept ML20210L2711986-04-30030 April 1986 Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20142A1201986-01-0909 January 1986 SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2 ML20132D1871985-06-30030 June 1985 Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2 ML20127N6311985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2 ML20102A7931985-01-31031 January 1985 Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2 ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20080N4631983-09-30030 September 1983 Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts ML20080K6341983-09-27027 September 1983 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20091D5961983-07-31031 July 1983 Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping Sys ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept ML20151H2421982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20063C7431982-06-25025 June 1982 Masonry Wall Design, Technical Evaluation Rept ML20062B2991982-06-0707 June 1982 Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2 ML20050S9651982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20041D2271982-01-31031 January 1982 Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept ML20041D2291982-01-31031 January 1982 Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept ML20041D2331982-01-31031 January 1982 Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20040D1291981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20040D1281981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20008F7911981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981 ML19247E1981981-02-28028 February 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept ML19331C9041980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept ML20055A4361980-02-28028 February 1980 Electrical,Instrumentation & Control Sys Support, Interim Rept ML20236N8341978-11-30030 November 1978 Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977 1997-06-02
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20140E2991997-06-0202 June 1997 Proposed Criteria for ECCS Strainer Design,Technical Evaluation Rept L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 21996-12-31031 December 1996 Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 ML20086G5161995-06-29029 June 1995 Technical Evaluation Rept on Individual Plant Exam Front End Analysis ML20086G5211994-12-31031 December 1994 Technical Evaluation Rept on Individual Plant Exam Back-End Analysis ML20086G5281994-11-30030 November 1994 Technical Evaluation Rept on Individual Plant Exam Human Reliability Analysis ML20079S0781994-09-26026 September 1994 Technical Evaluation Rept;Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Hatch-1/-2 ML20045A5211993-05-31031 May 1993 High Pressure Coolant Injection System RISK-BASED Inspection Guide for Hatch Nuclear Power Station ML20058H5991990-11-15015 November 1990 Analysis of Ei Hatch Unit 2 Integrated Leakage Rate Testing Data Using Sbir Analysis of State-of-Art Methods of Containment Integrated Leakage Rate Testing ML19325C1401989-06-20020 June 1989 Preimplementation Audit Rept for Dcrdr at Georgia Power Co Edwin I Hatch Nuclear Power Plant,Units 1 & 2,890424-26. ML20235L5621987-06-30030 June 1987 Technical Evaluation Rept for Radiological Effluent Release & Environ Operating Repts for 1985 - Ei Hatch Nuclear Plant, Units 1 & 2, Informal Rept ML20215M2121987-05-31031 May 1987 Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components, Informal Rept ML20214Q8981987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept ML20204G3921986-08-0101 August 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Edwin I Hatch Nuclear Plant Units 1 & 2, Supplementary Technical Evaluation Rept ML20210L2711986-04-30030 April 1986 Second Interval Inservice Insp Program,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20214G9591986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 2) Equipment Qualification (Reactor Trip Sys Components), Selected GE BWR Plants ML20211F0301986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (RTS Components) Selected GE BWR Plants (Grand Gulf 1 & 2,Hatch 1 & 2,LaSalle 1 & 2 & Millstone 1) ML20142A1201986-01-0909 January 1986 SPDS Progress Review,Ei Hatch Nuclear Plants,Units 1 & 2 ML20132D1871985-06-30030 June 1985 Conformance to Reg Guide 1.97,Edwin I Hatch Nuclear Plant Units 1 & 2 ML20127N6311985-05-0303 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, 'Post-Trip Review & Data & Info Capabilities,' for Ei Hatch Nuclear Plant,Units 1 & 2 ML20102A7931985-01-31031 January 1985 Conformance to Reg Guide 1.97,EI Hatch Nuclear Plant Units 1 & 2 ML20087M8321984-03-27027 March 1984 Control of Heavy Loads (C-10),Georgia Power Co,Ei Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20080N4631983-09-30030 September 1983 Technical Evaluation of Hatch Units 1 & 2 Plant-Unique Analysis Repts ML20080K6341983-09-27027 September 1983 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors,Ei Hatch Nuclear Plant Units 1 & 2, Technical Evaluation Rept ML20091D5961983-07-31031 July 1983 Technical Evaluation of Integrity of Edwin I Hatch Nuclear Power Plant Unit 1 & 2 RCPB Piping Sys ML20076C4281983-02-0808 February 1983 ECCS Repts (F-47),TMI Action Plan Requirements,Edwin Hatch Nuclear Plant,Units 1 & 2, Technical Evaluation Rept ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept ML20151H2421982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20063C7431982-06-25025 June 1982 Masonry Wall Design, Technical Evaluation Rept ML20062B2991982-06-0707 June 1982 Operating Reactor - TMI Lessons Learned NUREG-0737 Response Evaluations (Program Ii),Project 1 - RCS Vents (Item II.B.1), Final Technical Evaluation Rept for Hatch 1 & 2 ML20050S9651982-02-28028 February 1982 Degraded Grid Protection for Class IE Power Sys,Ei Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20041D2271982-01-31031 January 1982 Evaluation of Licensee Response to NUREG-0737 ,Item II.B.2 - Design Review of Plant Shielding Edwin I. Hatch Nuclear Plant Units 1 & 2 - Dockets 50-321 & 50-366, Technical Evaluation Rept ML20041D2291982-01-31031 January 1982 Degraded Grid Protection for Class IE Power Sys,Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Preliminary Rept ML20041D2331982-01-31031 January 1982 Adequacy of Station Electric Distribution Sys Voltages, Edwin I. Hatch Nuclear Power Plant,Units 1 & 2, Informal Rept ML20040D1291981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20040D1281981-12-11011 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment, Request for Addl Info ML20008F7911981-04-30030 April 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin I Hatch Nuclear Power Station, Informal Rept for Apr 1981 ML19247E1981981-02-28028 February 1981 Adequacy of Station Electric Distribution Sys Voltages, Edwin Hatch Nuclear Power Station - Units 1 & 2,Dockets 50-321 & 50-366, Informal Rept ML19331C9041980-07-21021 July 1980 Primary Coolant Sys Pressure Isolation Valves,Hatch Units 1 & 2, Technical Evaluation Rept ML20055A4361980-02-28028 February 1980 Electrical,Instrumentation & Control Sys Support, Interim Rept ML20236N8341978-11-30030 November 1978 Aerial Radiological Survey of Area Surrounding E Hatch Nuclear Plant, Date of Survey Mar 1977 1997-06-02
[Table view] |
Text
__ _
SAIC-85/1519-2 REVIEW OF LICENSEE AND APPLICANT RESPONSES TO NRC GENERIC LETTER 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2
" POST-TRIP REVIEW: DATA AND INFORMATION CAPABILITIES" FOR EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (50-321, 50-366)
Technical Evaluation Report Prepared by Science Applications International Corporation 1710 Goodridge Drive McLean, Virginia 22102 '
Prepared for U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l
Contract No. NRC-03-82-096 8505230594 850503 f PDR ADOCK 05000321 P PDR E
1 FOREWORD This report contains the technical evaluation of the Edwin I. Hatch 4 . #. Nuclear Plant response to Generic Letter 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events). Item 1.2 " Post Trip Review:
Data and Information Capabilities."
For the purposes of this evaluation, the review criteria, presented-in
-part 2 of this report, were divided into five separate categories. These
- are
- 1. The parameters monitored by the sequence of events and the time
- history recorders,
- 2. The performance characteristics of the sequence of events recorders ,
- 3. The performance characteristics of the time history recorders,
- 4. The data output format, and
- 5. The long-term data retention capability for post-trip review
, material.
All available responses to Generic Letter 83-28 were evaluated. The plart for which this report is applicable was found to have adequately .-
responded to. -ain! met, category 4. ggf gf cM&/A The report describes the specific methods used to dete mine the cate-gorization of the responses to Generic Letter 83-28. Sine this evaluation report was intended to apply to more than one nuclear pow plant specifics regarding how each plant met (or failed to meet) the r;- '=:;;;; are not presented. Instead, the evaluation presents a categorization of the responses according to which categories of m& r;;te are satisfied and which are not. The evaluations are based on s ific criteria (Section 2)
- derived from the requirements as stated in the neric letter.
rey /et /Cftb!^ '
l
- ,e a TABLE OF CONTENTS Section Page Introduction. . . . . . . . . . . . . . . . . . . . . . . . . I
- 1. Background. . . . . . . . . . . . . . . . . . . . . . . . . . 2
- 2. Review Criteria . . . . . . . . . . . . . . . . . . . . . . . 3
- 3. Evaluation. . . . . . . . . . . . . . . . . . . . . . . . . . 8
- 4. Conclusion. . . . . . . . . . . . . . . . . . . . . . . . . . 9
- 5. Re fe re nc e s . . . . . . . . . . . . . . . . . . . . . . . . . . 10 (r. Soffortspir doc,unu;T*t*kW WCM - . * ' ' '
INTRODUCTION 1
SAIC has reviewedsubmittals the,srsdru'$ prepared in response to Generic Letter 83-28, item 1.2 " Post-Trip Review: Data and Information Capability".
The submittals (see references) contained sufficient information to determine that. the data and information capabilities at this plant are acceptable in the f 11owing area.
e The output format of the recorded data, f However, the data and information capabilities, as described in the submittal, either fall to meet the review criteria or provide insufficient information to allow determination of the adequacy of the data and information capabilities in the following areas.
l l e The parameters monitored by both the sequence-of-events and time history recorders.
e The sequence-of-events recorder (s) performance charac-teristics. .
e The time history recorder (s) performance characteris-tics.
e The long-term data retention, record keeping, capa-bility.
i l
! 1
- 1. Background
~
~
On February 25. 1984, both of the scram circuit breakers at Unit 1 of the Sales Nuclear Power ' Plant failed to open upon an automatic reactor trip signal from the reactor protection system. This incident occurred during the plant startup and the reactor was tripped manually by the operator about 30 seconds after the initiation of the automatic trip signal. The failure of the circuit breakers has been determined to be related to the sticking of the under voltage trip attachment. Prior to this incident; on February 22, )
1983; at Unit 1 of the Salen Nuclear Power Plant an automatic trip signal )
was generated based on steam generator low-low level during plant startup.
In this case the reactor was tripped manually by the operator almost coinci-dentally with the automatic trip. At that time, because the utility did not
! - have a requirement for the systematic evaluation of the reactor trip, no
- investigation was performed to determine whether the reactor was tripped ;
automatically as expected or manually. The utilities' written procedures
- required only that the cause of the trip be determined and identified the 1
responsible personnel that could authorize a restart if the cause of the
! trip is known. Following the second trip which clearly indicated the problem with the trip breakers, the question was raised on whether the circuit breakers had functioned properly during the earlier incident. The most useful source of information in this case, namely the sequence of events printout which would have indicated whether the reactor was tripped i
automatically or manually during the February 22 incident, was not retained after the incident. Thus, no ju.dgment on the proper functioning of the trip system during the earlier incident could be made.
Following these incidents; on February 28, 1983; the NRC Executive Director for Operations (ED0), directed the staff to investigate and report on the. generic implications of these occurrences at Unit 1 of the Salem Nuclear Power Plant.' The results of the staff's inquiry into the generic implications of the Salem Unit incidents is reported in NUREG-1000. " Generic Implications of ATWS Events at the Salen Nuclear Power Plant." Based on the results of this study, a set of required actions were developed and included in Generic Letter 83-28 which was issued on July 8,1983 and sent to all licensees of operating reactors, appitcants for operating license, and construction permit holders. The required actions in this generic letter '
consist of four categories. These are: (1) Post-Trip Review, (2) Equipment i
2
ww-nevw -, ,,,.,--v.-r.,,,,m.- , - , , , _ - - . .,,,,,.n.,,,,mn, nrm,, myc-n--_cg-nws-,--wys-,.n--.,_eg,
. Classification and Vender Interface. (3) Post Maintenance Testing, and (4)
Reactor Trip System Reliability Improvements.
The first required action of the generic letter, Post-Trip Revihw, is the subject of this TER and consists of action item 1.1 " Program Description and Procedure" and action item 1.2 " Data and Information Capability." In the next section the review criteria used to assess the adequacy of the -
utilities' responses to the requirements of action item 1.2 will be discussed.
- 2. Review Criteria The intent of the Post Trip Review requirements of Generic Letter 83-28 is to ensure that the licensee has adequya :e procedures and data and information sources to understand the caus{and progression of a reactor trip. This understanding should go beyond a simple identification of the course of the event. It should include the capability to determine the root cause of the reactor trip and to determine whether safety limits have been exceeded and if so to what extent. Sufficient information about the reactor trip event should be available so that a decision on the acceptability of a reactor restart can be made.
The following are the review criteria developed for the requirements of Generic Letter 83-28, action item 1.2:
The equipment that provides the digital sequence of events (SOE) record and the analog time history records of an unscheduled shutdown should pro-vide a reliable source of the necessary information to be used in the post trip review. Each plant variable which is necessary to determine the cause(s) and progression of the event (s) following a plant trip should be monitored by at least one recorder [such as a, sequence-of-events recorder or a plant process computer for digital parameters; and strip charts, a plant process computer or analog recorder for analog (time history) variableg.
Ea.ch device used to record an analog or digital plant variable should be described in sufficient detail so that a determination can be made as to whether the following performance characteristics are met:
3
e Each sequence-of-events recorder should be capable of detecting and recording the sequence of events with a sufficient time discrimination capability to ensure that the time responses asso-ciated with each monitored safety-related system can be ascer-tained, and that a determination can be made as to whether the time response is within acceptable limits based on FSAR Chapter 15 Accident Analyses. The recommended guideline for the SOE time discrimination is approxi-mately 100 usec. If current SOE recorders do not have this time discrimination capability the licensee or applicant should show that the current time discrimination capability is sufficient for an adequate reconstruction of the course of the reactor trip. As a minimum this should include the ability to adequately recon-struct the accident scenarios presented in Chapter 15 of the plant FSAR. '
e Each analog time history data recorder should have a sample inter-val small enough so that the incident can be accurately reconstructed following a reactor trip. As a minimum, the licensee or applicant should be able to reconstruct the course of the accident sequences evaluated in the accident analysis of the plant FSAR (Chapter 15). The recommended guideline for the sample interval is 10 sec. If the time history equipment does not meet this guideline, the licensee or applicant should show that the current time history c,apability is sufficient to accurately recon-struct the accident sequences presented in Chapter 15 of the FSAR.
~
e To support the post trip analysis of the cause of the trip and the proper functioning of involved safety related equipment, each analog time history data recorder should be capable of updating and retaining information from approximately five minutes prior to the trip until at least ten minutes after the trip.
, e The information gathered by the sequence-of-events and time history data collectors should be stored in a manner that will allow for retrieval and analysis. The data may be retained in either hardcopy (computer printout, strip chart output, etc.)
or in an accessible memory (magnetic disc or tape). This 4
{ information~ should be presented in a readable and meaningful format, taking into consideration good human factors practices
~ '
(such as those outlined in NUREG-0700). -
.e All equipment used to record sequence of events and time history information should be powered from a reliable and non-interruptible power source. The power source used need not be
- safety related. -
1 The sequence of events and time history recording equipment should monitor sufficient digital and analog parameters, respectively, to assure that the course of the re, actor trip can be reconstructed. The parameters
! monitored should provide sufficient information to determine the root cause of the reactor trip, the prcgression of the reactor trip, and the response of the plant parameters and systems to the reactor trip. Specifically, all input parameters associated with reactor trips, safety injections and other safety-related systems as well as output parameters sufficient to record the proper functioning of these systems should be recortled for use in the post trip review. The parameters deemed necessary, as a minimum, to perform a post-trip review (one that would determine if the plant remained within its design envelope) are presented on Tables 1.2-1 and 1.2-2. If the appli-cants' or licensees' SOE recorders and time history recorders do not monitor i all of the parameters suggested in these tables the applicant or licensee i should show that the existing set of monitored parameters are sufficient to establish that the plant remaine,d within the design envelope for the appro- l priate accident conditions; such as those analyzed in Chapter 15 of the l plant Safety Analysis Report.
Information gathered during the post trip review is required input for future post trip reviews. Data from all unscheduled shutdowns provides a valuable reference source for the determination of the acceptability of the plant vital parameter and equipment response to future unscheduled shut-downs. It is therefore necessary that information gathered during all post trip reviews be maintained in an accessible manner for the life of the plant.
5 l
Table 1.2-1. PWR Parameter List SOE Time History
' Recorder Recorder Parameter / Signal (l} x Reactor Trip (1) x Safety Injection x Containment Isolation (1) x Turbine Trip x Control Rod Position
- (1) x x Neutron Flux, Power x T Containment Pressure (2) Containment Radiation x Containment Sump Level (1) x x Primary System Pressure (1) x x Primary System Temperature (1) x Pressurizer Level (1) x Reactor Coolant Pump Status (1)x x Primary System Flow (3) Safety Inj.; Flow. Pump / Valve Status x MSIV Position x x Steam Generator Pressure (1) x x Steam Generator Level (1) x x Feedwater Flow (1) x x . Steam Flow (3) Auxiliary Feedwater System; Flow.
Pump /Value Status x AC and DC System Status (Bus Voltage) x Diesel Generator Status (Start /Stop.. l On/0ff) -
l x PORV Position j (1): Trip parameters (2): Parameter may be monitored by either an SOE or time history recorder.
(3): Acceptable recorder options are: (a) system flow recorded on an SOE recorder (b) system flow recorded on a time history recorder, or (c) equipment status recorded on an SOE recorder.
6
4 Table 1.2-2. BWR Parameter List SOE Time History
- Recorder: R'ecorder Parameter / Signal x Reactor Trip x Safety Injection
.x Containment Isolation x Turbine Trip x- Control Rod Position x (1) x Neutron Flux, Power x (1) Main Steam Radiation (2) Containment (DryWell) Radiation x (1) x Drywell Pressure (Containment Pressure)
-(2) Suppression Pool Temperature x(1) x Primary System Pressure
-x(1) x Primary System Level x MSIV Position
, x(1) Turbine Stop Valve / Control Valve Position
!- x Turbine Bypass Valve Position x Feedwater Flow x Steam Flow (3) Recirculation; Flow. Pump Status x (1) Scram Discharge Level x(1) ,
Condenser Vacuum x AC and DC System Status (Bus Voltage)
(3)(4) Safety Injection; Flow. Pump / Valve Status i' x Diesel Generator Status (On/0ff.
Start /Stop)
(1): Trip parameters.
(2): Parameter may be recorded by either an SOE or time history recorder.
(3): Acceptable recorder options are: (a) system flow recorded on an SOE recorder. (b) system flow recorded on a time history recorder, or (c)equipmentstatusrecordedonanSOErecorder.
(4): Includes recording of parameters for all applicable systems from the following: HPCI. LPCI LPCS, IC. RCIC.
7 4
i
3.. Evaluation The parameters identified in part 2 of this report as a part of the review criteria are those deemed necessary to perform an adequate post-trip review. ' The recording of these parameters on equipment that meets the guidelines of the review criteria will result in a source of information that can be used to determine the cause of the reactor trip and the plant response to the trip, including the responses of important plant systems.
I The parameters identified in this submittal as being recorded by the sequence of events and time history recorders do not correspond to the parameters specified in part 2 of this report.
The review criteria require that the equipment being used to record the sequence of events and time history data required for a post-trip review meet certain performance characteristics. These characteristics are intended to ensure that, if the proper parameters are recorded, the record-1 ing equipment will provide an adequate source of information for an effec- l tive post-trip review. The information provided in this submittal does not indicate that either the time history or SOE equipment used would meet the intent of the performance criteria outlined in part 2 of this report.
The data and information recorded for use in the post-trip review should be output in a format that allows for ease of identification and use j of the data to meet the review criterion that calls for information in a readable and meaningful format. , The information contained in this submittal indicates that this requirement is set. .gjg The data and information used during a post-tr p review should be j retained as part of the plant flies. This informati n could prove useful during future post-trip reviews. Therefore, one ..,. M ; n: is that infor-mation used during a post-trip review be maintained in an accessible manner i for the life of the plant. The information contained within this submittal does not indicate that this criterion will be met.
8 1
5
e
- 4. Conclusion
.. o The information supplied in response to Generic Letter 83-28 indicates ;
that the current post-trip review data and information capabilities are adequate in the following area:
- 1. The recorded data is output in a readable and meaningful format. D The information supplied in response to Generic Letter 83-28 does not ;
indicate that the post-trip review data and information capabilities are :
adequate in the following areas.
- 1. Based upon the information contained in the submittal, all of the parameters specified in part 2 of this report that should be recorded for use in a post-trip review are not recorded.
- 2. Time history recorders, as described in the submittal, do not meet the minimum performance characteristics.
- 3. The sequence of events recorders, as described in the submittal, E do not meet the minimum performance requirements.
- 4. The data retention procedures, as described in the submittal, do not indicate that the information recorded for the post-trip review is maintained in an accessible manner for the life of the
~
' plant. gph cNk*NA t
It is possible that the current data and information capabilities at this ~
nuclear power plant are adequate to meet the intent of these n; ....;...t.
but were not completely described. Under these circumstances, the licensee should provide an updated, more complete, description to show in more detail the data and information capabilities at this nuclear power plant. If the information provided accurately represents all current data and information
'l capabilties, then the licensee should either show that the data and informa- l tion capabilities meet the intent of the criteria in part 2 of this report, or detail future modifications that would enable the licensee to meet the intent of the evaluation criteria.
l 9
i i
l
~
REFERENCES NRC Generic Letter 83-28. " Letter to all licensees _of operating
-reactors, applicants for operating license, and holders of construction permits regarding Required Actions Based on Generic Implications of
-Salem ATWS Events." July 8, 1983.
NUREG-1000 Generic Implications of ATWS Events at the Salem Nuclear Power Plant, April 1983.
Letter from L.T. Gucwa, Georgia Power, to J.F. Stolz, NRC, dated November 7, 1983, Accession Number 8311160062 in response to Generic Letter 83-28 of July 8,1983, with attachment.
Plant Edwin I. Hatch, Units 1 and 2. Salem Generic Requirements Status Report, Nov=mber 7,1983.
Letter from L.T. Gucwa, Georgia Power, to J.F. Stolz, NRC, dated February 29,1984, Accession Number 8403070251 transmitting updated plans and schedules, and Vendor Equipment Technical Information Program in response to Section 2.2.2, with attachment.
Pl* ant Edwin I. Hatch Units 1 and 2 Response to Generic Letter 83-28 Salem Generic Requirements, dated February 29, 1984.
NUTAC Vendor Equipment Technical Information Program dated February, 1984.
10
SUffMWNV 000unthct % Tm .
Hatch
- 1. Parameters recorded: Unsatisfactory See attached table for discrepancies.
2.' SOE recorders performance characteristics: Unsatisfactory Plant process computer: non-interruptible power supply; time discrimi-nation between events is not provided
- 3. Time history recorders performance characteristics: Unsatisfactory Plant process computer: data is collected at 5 sec intervals for the period from 5 minutes before to 5 minutes after the trip Strip charts are also used, but little or no information is provided.
- 4. Data output format: Satisfactory SOE data: format includes time, input point and event descriptor Analog data: format includes time, parameter value and name, and input ID
- 5. Data retention capability: Unsatisfactory Procedures exist to ensure data retention but length of retention is not specified.
9 11
f f
. . \
~
RseAle
- M ui d BWR Parameters for Post Trip Review (circled parameters are not recorded)
SOE Time History Recorder Recorder Parameter / Signal l Reactor Trip Safety Injection x Containment Isolation 8x x
Turbine Trip Control Rod Position x (1) x Neutron Flux, Power x (1), Main Steam Radiation
@ Containment (Dry Well) Radiation x (1) Drywell Pressure (Containment Pressure)
@ Suppression Pool Temperature ~
x (1) x Primary System Pressure x (1) x Primary System Level ,
x MSIV Position x Turbine Stop Valve / Control Valve Position 8x(1) x Turbine Bypass Valve Position Feedwater Flow x Steam Flow (3) Recirculation; Flow. Pump Status x (1) Scram Discharge Level x (1) Condenser Vacuum AC and DC System Status (3)(4) Safety Injection; Flow. Pamp/ Valve Status x Diesel Generator Status (1): Trip parameters.
~
(2): Parameter may be recorded by either an SOE or time history recorder.
(3): Acceptable recorder options are: (a) system flow recorded on an SOE recorder, (b) system flow recorded on a time history recorder, or (c) equipment status recorded on an SOE recorder.
(4): Includes recording of parameters for all applicable systems from the following: HPCI, LPCI, LPCS, IC, RCIC.
l%