Memorandum of Agreement Between Advisory Council on Historic Preservation,Nrc,State of Ga Historic Preservation Officer & Util Re Implementation of Alternative IV Operational Strategy Concerning Location of Transmission Line
ML20132B734
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/18/1985
From: Adensam E, Baker, John Baker, Dawey R, Foster D, Lyon E
ADVISORY COUNCIL ON HISTORIC PRESERVATION, GEORGIA POWER CO., GEORGIA, STATE OF, Office of Nuclear Reactor Regulation
To:
Shared Package
ML20132B720 List:
References
NUDOCS 8509260290
Download: ML20132B734 (2)


Text

.. . - -- -. __ . - - . - - _ - _ _ . - . . -. - -

MEMORANDUM OF AGREEMENT WHEREAS, the Nuclear Regulatory Commission (NRC) has issued a Constructh..

Permit for the Alvin W. Vogtle Electric Generating Plant (VEGP) and it's associated transmission lines to Georgia '

Power Company as agent for itself Oglethorpe Power Corporation, the Municipal Electric Authority of Georgia, and the City of Dalton Georgia; and, WHEREAS, the NRC in consultations with the State Historic Preservation Officer (SHPO) for Georgia and Georgia Power Company has determined that the construction of one of these associated '

transmission lines would adversely effect the Francis Plantation, a property listed in the National Register of Historic Places  :

by visually intruding upon the historical s.etting of this property and by relocating a structure located on this property; and, WHEREAS, pursuant to the procedures of the Advisory Council for Historic Preservation (ACHP) (36 C.F.R. Part 800) the ANCP, the NRC, the SHP0 for Georgia, and Georgia Power Company have consulted ,

and reviewed the feasible and reasonable alternatives for avoiding or mitigating these adverse effects.

NOW THEREFORE:

It is mutually agreed that. implementation of the planning and operational strategy identified as " Alternative IV" in a letter dated February 18, 1985, from Georgia Power Company to the SHP0 for Georgia, under the stipulations detailed hereinafter, constitutes the most feasible and reasonable alternative for the mitigation of adverse effects to the Francis Plantation associated with the construction, operation and normal maintenance of the subject transmission line.

STIPULATIONS:

F (1) Georgia Power Company will take the following actions to mitigate the adverse effects to the Francis Plantation due to the construction of the transmission line:

(A) Georgia Power Company will construct the transmission tower in the location described as Alternative IV to avoid the requirement of moving the domestic structure now located in the proposed transmission line right-of-way.

(B) Georgia Power Company will infom the land owner that relocation of the domestic structure now located in the transmission line corridor will not be required.

, (C) Georgia Power Company will construct the transmission line

" tower (height 152') at the site as located in the description of Alternative IV.

l A

M $bst4 pm

~, ~

1 (D) Georgia Power Company will top and trim by hand trees located in the proposed right-of-way in the area of the domestic l structure to maintain a 25-foot conductor clearance, remove ,

debris, and conduct in the same manner necessary side triming of trees along the northern boundary of the transmission line corridor.

(2) Georgia Power Company will continue to utilize hand trimming

and removal operations for the purposes of the normal maintenance of the subject transmission line corridor.

(3 Georgia fower Company will report annually to the SHP0 for Georgia, i r ga n the implementation and continuation of these stipulations.

0 Y b , l [{ f i 7207..' ""'.'2"ee" r A

Nuclear Regulatory Comission i YMS M f Yfl~  :

. ' Date i by: Elinor G. Mensam, Chief: Licensing Branch No. 4, Division of Licensing State

$) -

G 19Rr toric Preservation Ffficer.for Georgia by: zabeth A. Lyon, D uty SHPO / Date' Georgia Power Company

~

AL 7. Mar

by
D. O. Foster

/ Date Vice Preside Project General Manager t1e t