Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program ML20216F1001998-04-15015 April 1998 Safety Evaluation Accepting 980331 Licensee Proposal to Perform Alternative Testing for Containment Pressurization Test for Vynp ML20217F3421998-03-25025 March 1998 SER Accepting Plans for 1998 & 1999 Refueling Outages Re Reactor Vessel Internals for Plant ML20212H1521998-03-0606 March 1998 Correction to Page 7 of SE Re Relief Request for Third 10-yr Interval Pump & Valve IST Program for Plant ML20217N4911998-02-27027 February 1998 SER Pertaining to Cracking of EDG Lube Oil Piping at Vermont Yankee ML20198P9941998-01-15015 January 1998 SE Authorizing Relief Requests for Third Interval Pump & Valve Inservice Testing Program ML20141A4151997-06-18018 June 1997 Revised SE Accepting Proposed Onsite Disposal of Slightly Contaminated Silt Removed from Vermont Yankee Cooling Towers ML20135E5401997-03-0303 March 1997 Safety Assessment Accepting Mod of RHR & CS Sys Containment Isolation Function Configuration ML20134N8271996-11-20020 November 1996 Safety Evaluation Accepting Licensee Scope & Insp Methods Proposed for Insp of Core Spray Internal Piping During Fall 1996 Refueling Outage at Plant ML20134F9631996-11-0505 November 1996 Safety Evaluation Re Power/Flow Exclusion Region Calculation Method Using LAPUR5 Computer Code & Implementation of Solomon Stability Monitor for Licensee Facility ML20128N3531996-10-11011 October 1996 Safety Evaluation Accepting Licensee Flaw Evaluation of Indication Found During Reactor Pressure Vessel Insp at Plant ML20129G3611996-10-0202 October 1996 Safety Evaluation Accepting Proposed Repair for Plant Core Shroud ML20057A6991993-09-0303 September 1993 Safety Evaluation of IST Program Relief Requests for Pumps & Valves for Third 10-yr Insp Interval ML20057A2791993-08-12012 August 1993 Safety Evaluation Accepting Licensee Reasons Given for Delay in Completing short-term Actions Requested in Ieb 93-003, Resolution of Issues Re to Rv Water Level Instrumentation in Bwrs ML20246D7731989-08-21021 August 1989 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Item 2.2.1, Required Actions Based on Generic Implications of Salem ATWS Events. Equipment Classification Program for safety-related Components Acceptable ML20244D0311989-06-0707 June 1989 Safety Evaluation Accepting Util Second 10-yr Interval Inservice Insp Program Plan ML20205T4181988-10-14014 October 1988 Errata to Safety Evaluation Concluding Util Submittal Re Spent Fuel Pool Expansion ML20204F7271988-10-14014 October 1988 Safety Evaluation Supporting Proposed Expansion of Spent Fuel Pool at Facility ML20236N6461987-08-0707 August 1987 Safety Evaluation Re Permanent Elimination of Liquid Penetrant Exam of Feedwater Nozzles at Facility.Due to Lack of Reasonable Assurance That Ultrasonic Exam Can Totally Replace Penetrant Exam,Request Unacceptable ML20214T9891987-05-28028 May 1987 Safety Evaluation Re Util 870112 Proposed Plans to Inspect Two Overlay Repaired Core Spray safe-ends in Lieu of Replacement During Upcoming 1987 Refueling Outage.Plans Acceptable,Providing That Insp Results Satisfactory ML20207S7801987-03-12012 March 1987 Safety Evaluation Granting Relief from Tech Spec 4.7.A.3 on one-time Basis to Perform RHR Pump Wear Ring Replacement ML20214T4921986-11-24024 November 1986 Safety Evaluation Accepting Licensee 830511 & 860117 Responses to Generic Ltr 83-08 Re Mod of Vaccum Breakers on Mark I Containments ML20215M5871986-10-24024 October 1986 Preliminary Evaluation of Containment Study Transmitted w/860902 Ltr.Licensee Estimates Appear Optimistic Considering Uncertainties Inherent in Failure Rate Data ML20206F3651986-06-16016 June 1986 Safety Evaluation Re Proposed Repair of Core Spray safe- Ends,During Current Refueling Outage.Plant Can Be Safely Returned to Power Operation After Satisfactory Completion of Core Spray safe-end Repairs ML20206F0681986-06-13013 June 1986 Safety Evaluation Supporting 850514,0710,860327,0411 & 0513 Requests for Approval to Use Pvrc Damping Values (ASME Code Case N-411) for Piping Sys Reanalysis ML20202J4211986-03-31031 March 1986 Safety Evaluation Accepting Util Design Mods & Tech Spec Changes Re Degraded Grid Voltage Protection for Class 1E Sys.Lll Technical Evaluation Rept Encl ML20155B8351986-03-31031 March 1986 Safety Evaluation Supporting Revised Procedure OP-3140, Providing Technically Acceptable Actions During Degraded Grid Voltage Conditions W/O LOCA to Assure Protection of Class 1E Electrical Sys & Equipment ML20140H9881986-03-25025 March 1986 Safety Evaluation Re Util 851008 Request to Install Carpet Over Vinyl Asbestos Tiled Control Room Floor Covering. Installation of Carpet Will Not Decrease Level of Fire Safety in Control Room & Deviation Acceptable ML20138E4201985-12-0202 December 1985 Safety Evaluation Supporting Util 831107 & 840320 Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 Re post-maint Testing & Reactor Trip Sys Reliability ML20136F1241985-11-18018 November 1985 Safety Evaluation Re IE Bulletin 80-11, Masonry Wall Design. Issues Re Arching Action Theory Resolved ML20137S7331985-09-27027 September 1985 Safety Evaluation Approving Use of Fuel Thermal Performance Code,Frosstey,For Analysis of LOCA Conditions at Low & Moderate Burnups ML20135C8921985-09-10010 September 1985 Safety Evaluation Supporting 840824 Commitment to Convert Air Containment Atmosphere Dilution Sys to Nitrogen Sys,In Response to Generic Ltr 84-09 ML20135C9121985-09-10010 September 1985 Safety Evaluation Supporting Conclusion That Diversification of Scram Discharge Vol Level Instrumentation Not Necessary & Tech Specs,As Modified in Amend 76,resolve Staff Concerns Re Need for Instrumentation Diversity ML20134K7351985-08-19019 August 1985 Safety Evaluation Accepting 831107 Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing ML20136G3611985-08-12012 August 1985 Safety Evaluation Accepting Seismic Design Criteria Utilized for Evaluation of Modified Recirculation Sys ML20132D8971985-07-22022 July 1985 Safety Evaluation Supporting Use of Pvrc Damping Values (ASME Code Case N-411) for Response Spectrum Seismic Piping Analyses ML20127D8991985-05-0606 May 1985 Safety Evaluation Re 840925 & 1002 Responses to Generic Ltr 83-28,Item 1.1 Concerning post-trip Review Program & Procedures.Program & Procedures Acceptable 1999-09-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
. , _ . . . _ - -. . -- .
sanw 4 UNITED STATES
[ NUCLEAR REGULATORY COMMISSION i 3 WASHINGTON, D. C. 20555 1
%...../;C SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO SALEM ATWS EVENT, ITEMS 3.1.3 AND 3.2.3 -
-VERMONT YANKEE NUCLEAR POWER CORPORATION VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 1
1.0 INTRODUCTION
f i
7_ . By letter dated November 7,1983, the Yemont Yankee Nuclear Power Corporation (the licensee) submitted a response to our Generic Letter 83-28 for the Yemont Yankee Nuclear Power Station. This review covers Items' 3.1.3 and 3.2.3.
t0 BACKGROUNP
~
On February 25, 1983, both of the scram circuit breakers at Unit 1 of the Salem Nuclear Power Plant failed to open upon an automatic reactor trip
, signal from the Reactor Protection System. This incident occurred during
, the plant startup and the reactor was tripped manually by the operator about 30 seconds after the initiation of the automatic trip signal. The failure of the circuit breakers has been determined to be related to the sticking o,. of the under voltage trip attachment. Prior to this incident, on February 22, 1983, at Unit 1 of the Salem Nuclear Power Plant, an z.utomatic -
trip signal was generated based on steam generator low-low level during plant startup.- In this case, the reactor was tripped manual,1y by the
_.- operator almost coincidentally with the automatic trip. Following these . *
- incidents, on February'28, 1983, the NRC Executive Director for' Operations _.
(EDO), directed the staff to investigate and report on the generic
- .7 implications of these occurrences at Unit 1 of the Salem Nuclear Power Plant. The results of the staff's inquiry into the generic implications of the Salem unit incidents are reported in NUREG-1000, " Generic Implications of the ATWS Events at the Salem Nuclear Power Plant." As a result of this investigation, the Commission (NRC) requested (by Generic Letter 83-28 dated July 8,1983) all licensees of operating reactors, applicants for an operating license, and holders of construction permits to respond to certain generic concerns. These concerns are categorized into four areas:
(1) Post-Trip Review, (2) Equipment Classification and Vendor Interface, (3) Post-Maintenance Testing, and (4) Reactor Trip System Reliability Improvements. .
Item 3.1.3 (Post-Maintenance Testing of Reactor Trip System (RT()
Components) requires licensees and applicants to identify, if applicable, any post-maintenance for the RTS in existing Technical Specificalions which can be demonstrated to degrade rather than enhance safety. Item 3.2.3 extends this same requirement to include all other safety-related 8508300308 850019 PDR ADOCK 05000271
.P. PDR
components. Any proposed Technical Specification changes resulting from this action shall receive a pre-implementation review by NRC. ;
3.0 EVALUATION Our review of the licensee's submittal was performed with the assistance of EG&G, Idaho, Inc. The submittal from the licensee was reviewed to determine compliance with Items 3.1.3 and 3.2.3 of the generic letter.
First, the submittal was reviewed to determine if these two items were specifically addressed. Second, the submittal was checked to determine if there were any post-maintenance test requirements specified by the Technical Specifications that were suspected to degrade rather than enhance safety. Last, the submittal was reviewed for evidence of special conditions or other significant information relating to the two items of concern.
The review of Generic Letter 83-28, Item 4.5.3 may result in proposed changes to the Technical Specification requirements for surveillance testing frequency and out-of-service intervals for testing. The primary
. concern of Item 4.5.3 is the surveillance testing intervals. Items 3.1.3 and 3.2.3 are specifically directed at post-maintenance test requirements.
These concerns are essentially independent. 14owever, the evaluation of these concerns are coordinated so that any correlation between these concerns will be adequately considered. Since no specific proposal to change the Technical Specifications has been submitted, there is no identifiable need at this time for correlating the reviews of Item 4.5.3
- . with this review.
We have reviewed the November 7, 1983 licensee response to Items 3.1.3
- and 3.2.3 of Generic Letter 83-28. Within the response, the licensee's
~
evaluation is that at the present time there are no proposed Technical :
Specification changes required for Items 3.1.3 and 3.2.3. The licensee has
~
committed to continuously review Technical Specification requirements and - -
. . identify the need for revision in the future. A complete Technical ,
-+ Specification review to clarify wording and provide consistency with all 1 Technical Specification sections has been planned. Any identifiable J deficiencies would be the subject of future proposed Technical l Specification changes. I 1
4.0 CONCLUSION
l The licensee stated that no items have been identified in the Technical Specifications that degrade safety. Based on our review, assisted by our 1 contractor, EG&G, Idaho, Inc., we find that the licensee's submittal is I acceptable. ',
Principal Contributor: D. Lasher :. I Cf Dated: August 19, 1985