ML20135A904

From kanterella
Revision as of 08:15, 1 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 96-100 W/Util on 961204 to Discuss Violations Documented Under NRC Insp Repts 50-213/95-27,96-201,96-06 & 96-08 Relating to Licensing Design Basis & Corrective Action Program
ML20135A904
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/14/1996
From: Rogge J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
96-100, EA-96-001, EA-96-1, EA-96-334, EA-96-337, EA-96-338, EA-96-339, EA-96-340, EA-96-407, EA-96-440, NUDOCS 9612040090
Download: ML20135A904 (3)


See also: IR 05000213/1995027

Text

_ _ . . _. _

a.~. .

,

.

3

i

EA Nos.96-001, 96-340, i

!- 96-339, 96-338,96-337,  !

!96-334, 96-407,96-440  !

!  !

i

- November 14,1996 MN No.96-100, l

Revision 2

i  !

{ NUCLEAR REGULATORY COMMISSION REGION I +

'

t

'

.

NOTICE OF SIGNIFICANT LICENSEE MEETING i

4

Licensee: Connecticut Yankee Atomic Power Company (CYAPCO) s

Facility: Haddam Neck

Docket No.: 50-213 i

Time and Date: 9:00 a.m., Wednesday, December 4,1996

Location: Millstone Simulator and Training Facility

Rope Ferry Road (Route 156)

Waterford, CT 06385

Purpose: Predecisional Enforcement Conference to discuss violations

documented under NRC Inspection Reports (irs) 50-213/95-27, 96-

201,96-06, and 96-08 relating to Licensing Design Basis and

Corrective Action Program, IR 50-213/96-07 relating to Emergency

Preparedness Weaknesses, and IR 50-213/96-80 relating to the

Augmented Inspection Team findings during its review of four events

including the Nitrogen Bubble in the Reactor Head event.

NRC Attendees: H. Miller, Regional Administrator - Region 1

R. Cooper, Director - Division of Reactor Projects (DRP)

J. Rogge, Chief, Projects Branch 8 - DRP  !

J. Wiggins, Director - Division of Reactor Safety i

W. Raymond, Senior Resident inspector - Haddam Neck, DRP .!'

M. Virgilio, Deputy Director, Division of Inspection and Support

Programs, NRR

P. McKee, Deputy Director for Licensing, Special Projects Office

(SPO), Office of Nuclear Reactor Regulation (NRR) l

S. Dembek, Haddam Neck Project Manager, SPO, NRR l

.CY Attendees: T. Feigenbaum, Vice President and Chief Nuclear Officer, NUSCO-

G. LaPlatney, Haddam Neck Unit Director, CYAPCO I

J. Hazeltine, Director, Engineering, CYAPCO

P. Stroup, Director, Emergency Planning, NUSCO

G. van Noordennen, Manager, Nuclear Licensing, NUSCO

9612040090 961114

PDR ADOCK 05000213 \

'

G PDR

6-

. .

,

4

Meeting Notice 96-100 2

Note: This meeting is open for public observation. Attendance by additional NRC

personnel or handicapped persons requiring assistance to attend the meeting should be

made known by November 30,1996, via telephone call to J. F. Rogge, Region 1 at (610)

337-5146.

l

ORIGINAL SIGNED BY:

Approved by:

John F. Rogge, Chief

Projects Branch 8

Division of Reactor Projects

DISTRIBUTION:

T. C. Feigenbaum, Executive Vice President and Chief Nuclear Officer - Northeast Utilities

Service Company

State of Connecticut SLO

PUBLIC

Regional Administrator Secretary, RI

Deputy Regional Administrator Secretary, RI

DRP Division Secretary, RI

DRS Division Secretary, RI

DRM Division Secretary, RI i

Region i Receptionist '

i

l

I

i

. .

.

Meeting Notice 96-100 3

Distribution (via E-Mail):

J. Taylor, Executive Director for Operations (

3 J. Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional

Operations and Research, DER

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and

i Operations Support, DEDS

, B. Grimes, Deputy Director, Division of Reactor Program Management, NRR

R. Spessard, Deputy Director, Division of Reactor Controls and Human Factors, NRR

,

J. Lieberman, Director, Office of Enforcement

F. Miraglia, Director, Office of Nuclear Reactor Regulation

A. Thadani, Associate Director for Technical Review, NRR

R. Zimmerman, Associate Director for Projects, NRR

S. Varga, Director, Division of Reactor Projects - 1/11, NRR

. W. Dean, Regional Coordinator, OEDO

N. Green, Jr., DRA, RES

P. McKee, Deputy Director for Licensing, Special Projects Office (SPO), NRR

S. Dembek, Haddam Neck Project Manager, SPO, NRR

3

D. Screnci, Public Affairs Officer, RI

N. Sheehan, Field Public Affairs Officer, RI

W. Raymond, DRP

M. Campion, ORA

D. Chawaga, ORA

>

DOCUMENT NAME: G:\ BRANCH 8\ MEETINGS \HN11-4.EFC

To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" =

Copy with attachment / enclosure "N" = No copy

OFFICE Rl/DRP Rl/DRP l / l

NAME ELConner M(d JFRogge // V

' ~

DATE 11/13/96 11/[)96 '

OFFICIAL RECORD COPY