MONTHYEARML20212F5461999-09-23023 September 1999 Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement ML20154R3691998-10-19019 October 1998 Notification of 981029 Meeting with Listed Utils in Rockville,Md to Discuss Proposed Consortium of Utils ML20198S7391998-01-20020 January 1998 Forwards Operator Licensee Exam Info,Including Facility Outline,Initial Exam & as Given Operating Exam Administered During Wk of 971215 ML20140C3821997-04-0101 April 1997 Forwards Evaluation of TAR on Potential Unreviewed Safety Questions Re Auxiliary Feedwater Sys at Plant ML20140B7331997-02-14014 February 1997 Forwards Tech Assistance Potential Unreviewed Safety Questions Identified at Plant ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20128G5751996-10-0303 October 1996 Forwards Ltr to Be Sent to Licensees of Six Pressurized Water Reactor Plants That Have Used Fuel Mfg by Siemens Power Corp Since 1986.Licensees Requested to Verify Compliance of 10CFR50.46 W/Regulations ML20134B7921996-06-24024 June 1996 Discusses Results of Audit Review of Changes to Siemens Large Break ECCS Evaluation Model NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20155F9301993-08-16016 August 1993 Forwards Trip Rept Provided by Cv Dodd,Documenting Findings as Result of Review of 930512 & 13 Participation in Special Review of Eddy Current Insp Program of SGs at Kewaunee NPP ML20196G4051988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector, for Consideration Due to Recent Events at Braidwood Unit 1 ML20151A2271988-03-28028 March 1988 Forwards Info Package Re Backround Info for Commissioner Carr 880404 & 05 Visits to Kewaunee & Point Beach Sites, Respectively IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl1988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20155K2001988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20147C7031988-03-0101 March 1988 Forwards Corrected Summary Rept on Multi-Plant Action D-05 Re Upper Plenium Injection,Recommendation Concerning Generic Priority & Items for Senior Mgt Attention ML20237B2681987-12-11011 December 1987 Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche ML20236S3591987-11-16016 November 1987 Forwards Licensee Responses to 10CFR21 Notification Re Potential Violation of Component Cooling Water Containment Isolation Function,Per 871106 Request ML20236P7451987-11-13013 November 1987 Reviews Latest Performance Indicators to Determine Whether Indicators Can Be Used to Ascertain Quality Performance.Five of Six Plants Achieving Very Good Quality Performance While One Plant Achieving Good Quality Performance ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20207R6021987-03-12012 March 1987 Forwards Insp Plan for mid-SALP Insp at Facility Beginning 870316 ML20212F6411986-12-31031 December 1986 Forwards Technical Review Rept AEOD/T612, Degradation of Safety Sys Due to Component Misalignment &/Or Mispositioned Control/Selector Switches. Study Results Should Be Published in, Power Reactor Events ML20212D9001986-12-29029 December 1986 Forwards Localized Rod Cluster Control Assembly (Rcca) Wear at PWR Plants, Engineering Evaluation Rept.Nrr Should Consider Whether There Is Need to Establish Periodic Insps of Rccas & Assess Feasibility of Reactor Water Chemistry ML20212D9041986-12-29029 December 1986 Forwards Localized Rod Cluster Control Assembly (Rcca) Wear at PWR Plants Engineering Evaluation Rept.Ie Info Notice Should Be Issued to Alert Licensees About Rcca Degradation ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20214C6861986-11-17017 November 1986 Forwards List of Missing SALP Evaluation Forms (0516B). Requests Review of Files to Locate Missing Forms.Recognizing That RP 0516B Issued in Mar 1986,request Applies Only to Repts Issued After Mar 1986 ML20203H2741986-07-28028 July 1986 Forwards,For Review,Latest Update of SALP Ratings ML20133F8921985-10-0202 October 1985 Notification of 851011 Meeting W/Exxon Nuclear Co,Inc in Bethesda,Md to Discuss Recent Exxon Activities Toward Resolving Safety Analysis Issues ML20127F3061985-06-18018 June 1985 Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed ML0828909131985-03-18018 March 1985 Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329 ML20215E6001984-03-30030 March 1984 Discusses Implementation of Immediate Notification Requirements in 10CFR50.72 Which Allow NRC to Eliminate Unusual Event Classification.Submits Answers to Licensee Requests for Clarification of Listed General Headings ML20215E5811984-03-23023 March 1984 Requests Div Response to R Nelson 840118 Request for Clarification of 10CFR50.72 Notification Requirements Re Major Loss of Offsite Response Capability.Emergency Preparedness Involved.Requests Response by 840420 ML20235D1571984-02-28028 February 1984 Responds to 831220 Request for Technical Assistance Re Applicability of 10CFR50,App J,Section III.D.2(b)(ii) Requirements to Steam Generator Flushing Evolutions Described Described in Rl Nelson ML20244C2711983-04-22022 April 1983 Forwards 830228 Memo Transmitting Evaluation of Containment Cooling Sys Operability,Per 820415 Memo Request.Request to Util to Review Matter & Propose Amend Appropriate to Tech Specs Also Encl.W/O Encl ML20244C1261983-02-28028 February 1983 Forwards SER Re Tech Specs for Containment Cooling Sys Operability.Current Tech Spec Deficient Since Combinations of Inoperable Containment Heat Removal Equipment May Result in Accident Conditions Less Conservative than FSAR ML20205T4511982-11-23023 November 1982 Discusses 820512 Part 21 Rept Re Unqualified Bullet Resistant Fire Doors at Plant.Mfg Refuses to Submit Modified Doors to Applicable Testing & Plant Unable to Produce Acceptable Certified Test Data ML20127A3681982-08-18018 August 1982 Forwards List of Plants for Which Leak Test Repts Were Selected for Review by Ornl.Leak Testing Criteria Will Be Prepared from Review.W/O Encl ML20244C3611982-04-15015 April 1982 Forwards Resident Inspector 820316 Memo Identifying Deficiencies in Tech Spec 3.3.b.2 Re Containment Cooling Sys Operability.Licensee Should Submit Tech Spec Change Request.Concerns May Be Generic to Plants W/O STS ML20126L2271981-05-0101 May 1981 Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels ML20148P6001980-12-24024 December 1980 Discusses Followup Study Re Degradation of Internal Appurtenances in LWR Piping During Normal Plant Operation & Potential Effects When Degraded Appurtenances Are Subj to Accident Loads.Recommends Review of Recurrent Problems ML20062G9601979-02-0505 February 1979 Forwards Joint Motion & Agreement of Nrc,Lakeshore Citizens & Safe Haven Inc, & Proposed Form of Order Re Agreement of Settlement Among Parties ML20062C4121978-10-23023 October 1978 Notice of 781101 Meeting W/Util Re Reactor Physics Methods Qualification ML20235N5961971-03-25025 March 1971 Discusses AEC Plans to Apply New Position Re Means for Providing Control of Combustible Gas Concentrations Following Design Basis LOCA in Water Cooled Nuclear Power Plants,Per Regulatory Info Meeting 422 on 700904 ML20234B0651970-07-16016 July 1970 Comments on Section III of ASME Boiler & Pressure Vessel Code Re Design Pressures for Steel Containment Vessels. Changes to Listed Plant Containment Design Pressure Parameters Should Be Made.Related Info Encl 1999-09-23
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212F5461999-09-23023 September 1999 Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement ML20154R3691998-10-19019 October 1998 Notification of 981029 Meeting with Listed Utils in Rockville,Md to Discuss Proposed Consortium of Utils ML20198S7391998-01-20020 January 1998 Forwards Operator Licensee Exam Info,Including Facility Outline,Initial Exam & as Given Operating Exam Administered During Wk of 971215 ML20140C3821997-04-0101 April 1997 Forwards Evaluation of TAR on Potential Unreviewed Safety Questions Re Auxiliary Feedwater Sys at Plant ML20140B7331997-02-14014 February 1997 Forwards Tech Assistance Potential Unreviewed Safety Questions Identified at Plant ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20128G5751996-10-0303 October 1996 Forwards Ltr to Be Sent to Licensees of Six Pressurized Water Reactor Plants That Have Used Fuel Mfg by Siemens Power Corp Since 1986.Licensees Requested to Verify Compliance of 10CFR50.46 W/Regulations ML20134B7921996-06-24024 June 1996 Discusses Results of Audit Review of Changes to Siemens Large Break ECCS Evaluation Model NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20155F9301993-08-16016 August 1993 Forwards Trip Rept Provided by Cv Dodd,Documenting Findings as Result of Review of 930512 & 13 Participation in Special Review of Eddy Current Insp Program of SGs at Kewaunee NPP ML20196G4051988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector, for Consideration Due to Recent Events at Braidwood Unit 1 ML20151A2271988-03-28028 March 1988 Forwards Info Package Re Backround Info for Commissioner Carr 880404 & 05 Visits to Kewaunee & Point Beach Sites, Respectively IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl1988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20155K2001988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20147C7031988-03-0101 March 1988 Forwards Corrected Summary Rept on Multi-Plant Action D-05 Re Upper Plenium Injection,Recommendation Concerning Generic Priority & Items for Senior Mgt Attention ML20237B2681987-12-11011 December 1987 Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche ML20236S3591987-11-16016 November 1987 Forwards Licensee Responses to 10CFR21 Notification Re Potential Violation of Component Cooling Water Containment Isolation Function,Per 871106 Request ML20236P7451987-11-13013 November 1987 Reviews Latest Performance Indicators to Determine Whether Indicators Can Be Used to Ascertain Quality Performance.Five of Six Plants Achieving Very Good Quality Performance While One Plant Achieving Good Quality Performance ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20207R6021987-03-12012 March 1987 Forwards Insp Plan for mid-SALP Insp at Facility Beginning 870316 ML20212F6411986-12-31031 December 1986 Forwards Technical Review Rept AEOD/T612, Degradation of Safety Sys Due to Component Misalignment &/Or Mispositioned Control/Selector Switches. Study Results Should Be Published in, Power Reactor Events ML20212D9001986-12-29029 December 1986 Forwards Localized Rod Cluster Control Assembly (Rcca) Wear at PWR Plants, Engineering Evaluation Rept.Nrr Should Consider Whether There Is Need to Establish Periodic Insps of Rccas & Assess Feasibility of Reactor Water Chemistry ML20212D9041986-12-29029 December 1986 Forwards Localized Rod Cluster Control Assembly (Rcca) Wear at PWR Plants Engineering Evaluation Rept.Ie Info Notice Should Be Issued to Alert Licensees About Rcca Degradation ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20214C6861986-11-17017 November 1986 Forwards List of Missing SALP Evaluation Forms (0516B). Requests Review of Files to Locate Missing Forms.Recognizing That RP 0516B Issued in Mar 1986,request Applies Only to Repts Issued After Mar 1986 ML20203H2741986-07-28028 July 1986 Forwards,For Review,Latest Update of SALP Ratings ML20133F8921985-10-0202 October 1985 Notification of 851011 Meeting W/Exxon Nuclear Co,Inc in Bethesda,Md to Discuss Recent Exxon Activities Toward Resolving Safety Analysis Issues ML20127F3061985-06-18018 June 1985 Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed ML0828909131985-03-18018 March 1985 Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329 ML20215E6001984-03-30030 March 1984 Discusses Implementation of Immediate Notification Requirements in 10CFR50.72 Which Allow NRC to Eliminate Unusual Event Classification.Submits Answers to Licensee Requests for Clarification of Listed General Headings ML20215E5811984-03-23023 March 1984 Requests Div Response to R Nelson 840118 Request for Clarification of 10CFR50.72 Notification Requirements Re Major Loss of Offsite Response Capability.Emergency Preparedness Involved.Requests Response by 840420 ML20235D1571984-02-28028 February 1984 Responds to 831220 Request for Technical Assistance Re Applicability of 10CFR50,App J,Section III.D.2(b)(ii) Requirements to Steam Generator Flushing Evolutions Described Described in Rl Nelson ML20244C2711983-04-22022 April 1983 Forwards 830228 Memo Transmitting Evaluation of Containment Cooling Sys Operability,Per 820415 Memo Request.Request to Util to Review Matter & Propose Amend Appropriate to Tech Specs Also Encl.W/O Encl ML20244C1261983-02-28028 February 1983 Forwards SER Re Tech Specs for Containment Cooling Sys Operability.Current Tech Spec Deficient Since Combinations of Inoperable Containment Heat Removal Equipment May Result in Accident Conditions Less Conservative than FSAR ML20205T4511982-11-23023 November 1982 Discusses 820512 Part 21 Rept Re Unqualified Bullet Resistant Fire Doors at Plant.Mfg Refuses to Submit Modified Doors to Applicable Testing & Plant Unable to Produce Acceptable Certified Test Data ML20127A3681982-08-18018 August 1982 Forwards List of Plants for Which Leak Test Repts Were Selected for Review by Ornl.Leak Testing Criteria Will Be Prepared from Review.W/O Encl ML20244C3611982-04-15015 April 1982 Forwards Resident Inspector 820316 Memo Identifying Deficiencies in Tech Spec 3.3.b.2 Re Containment Cooling Sys Operability.Licensee Should Submit Tech Spec Change Request.Concerns May Be Generic to Plants W/O STS ML20126L2271981-05-0101 May 1981 Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels ML20148P6001980-12-24024 December 1980 Discusses Followup Study Re Degradation of Internal Appurtenances in LWR Piping During Normal Plant Operation & Potential Effects When Degraded Appurtenances Are Subj to Accident Loads.Recommends Review of Recurrent Problems ML20062G9601979-02-0505 February 1979 Forwards Joint Motion & Agreement of Nrc,Lakeshore Citizens & Safe Haven Inc, & Proposed Form of Order Re Agreement of Settlement Among Parties ML20062C4121978-10-23023 October 1978 Notice of 781101 Meeting W/Util Re Reactor Physics Methods Qualification ML20235N5961971-03-25025 March 1971 Discusses AEC Plans to Apply New Position Re Means for Providing Control of Combustible Gas Concentrations Following Design Basis LOCA in Water Cooled Nuclear Power Plants,Per Regulatory Info Meeting 422 on 700904 ML20234B0651970-07-16016 July 1970 Comments on Section III of ASME Boiler & Pressure Vessel Code Re Design Pressures for Steel Containment Vessels. Changes to Listed Plant Containment Design Pressure Parameters Should Be Made.Related Info Encl 1999-09-23
[Table view] |
Text
- a n, e.
'g g UNITED STATES
! i, g* NUCLEAR RESULATORY COMMISSION WASHINGTON, D.C. asseHoot
%,..,...jl -
April 1, 1997 MEMORANDUM TO: Geoffrey E. Grant, Director j_ Division of Reactor Safety Region III ,
FROM:
etLLOCc~x Cynthia A. Carpenter, Lcting Diroctb F
~
Project Directorate I l-3 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation
SUBJECT:
TECHNICAL ASSISTANCE REQUEST (AIT 97-004) ON POTENTIAL UNREVIEWED SAFETY QUESTIONS RELATED TO THE AUXILIARY i
FEEDWATER SYSTEM - KEWAUNEE NUCLEAR POWER PLANT (TAC NO. M97969) l In a memorandum dated February 14, 1997, you requested technical a:,sistance l from the Office of Nuclear Reactor Regulation (NRR) to resolve concerns l regarding potential unreviewed safety questions associated with the auxiliary feedwater system at the Kewaunee Nuclear Power Plant. These concerns were raised as a result of a safety system operations inspection which exited with
, the licensee on January 31, 1997.
The Plant Systems Branch in cooperation with the Reactor Syrtems and Mechanical Engineering Branches have reviewed the subject Region III task interface agreement request and prepared the attached evaluation. This completes NRR action on the subject Action Item AIT 97-004 and closes TAC No.
M97969. -
If you have any questions regarding this evaluation, please contact Rich Laufer at (301) 415-1373.
Docket No. 50-305
Attachment:
As stated cc: J. Wiggins, RI J.~Jaudon, RII j T. Gwynn, RIV l
l CONTACT: Rich Laufer, NRR (301) 415-1373 i l
i l
6 u GJo # 040 / z 5) XA gh
j -
EVALUATION OF RIII CONCERNS (AIT 97-004) ON l.
POTENTIAL UNREVIEWED SAFETY OUESTIONS RELATED TO THE AUXILIARY FEEDWATER SYSTEM l KEWAUNEE NUCLEAR POWER PLANT I
BACKGROUND The P1' ant Systems Branch (SPLB) in cooperation with the Reactor Systems and Mechanical Engineering Branches (SRXB and EMEB) have reviewed the subject
!. Region III task interface agreement request (TIA) tr4nsmitted to the Office of i
Nuclear Reactor Regulation (NRR) by memorandum dated February 14, 1997. In l the TIA, the region requested assistance in detemining if the operation of the auxiliary feedwater (AFW) system was consistent with the design and licensing basis for the plant. As identified in the region's memorandum at issue is whether certain conditions constitute unreviewed safety question,s (USQs) and whether license amendments are now required to restart the plant from its current outage.
Region III completed a safety system operations inspection (SSOPI) at Kewaunee Nuclear Power Plant which exited on January 31, 1997. In the course of that l inspection, two issues were identified which appeared to be USQs. Region III I
requested that NRR evaluate the two conditions and determine if either constitutes a USQ. The region noted in the TIA that if the conditions are determined to be USQs, then they would have to be resolved prior to restarting the plant. These two issues and the staff's responses are discussed below.
The staff has concluded that neither of the identified issues constitute a USQ at this time, but Issue 1 is an operability concern and a potential USQ
- depending on the action
- of the licensee.
ISSUE 1 1
! The inspectors identified that the individual AFW pumps could not provide 200 gallons per minute (gpm) to the steam generators (SGs) as described in the plant licensing basis. The Kewaunee Updated Safety Analysis Report (USAR),
Section 6.6, describes the two motor-driven (MD) and the single turbine-driven (TD) AFW pumps as each having a capacity of 240 gpm with up to 40 gpm of the l 240 gpa providing continuous recirculation. Also in Section 6.6 of the USAR, it is stated that, "The feedwater flow rate required to prevent thermal
. cycling of the tube sheet and for removing residual heat is the same, about l 160 gpa for the reactor (or 80 gpa per SG). A 200 gpm flow to the SGs is, therefore, sufficient to fulfill the above functions." The Kewaunee technical specification (TS) basis Section 83.4.b also contains these same quoted words.
The licensee maintained that the " margin of safety" for AFW pump capacity was included in the conservatism in the Westinghouse analysis that established the 160 gpa figure. Thus, the 160 gpm represented the higher bounding figure of
! some unknown margin. The licensee reported that a subsequent computer j analysis was run using 160 gps, and design limits were not exceeded.
ATTACHMENT i
I l
- - - _ - . - . - - . - - - - . ~ . - _ - -
i
!'L i
i The inspectors, however, concluded that the 160 gpm to 200 gpm pump capacity l (to the SGs) represented a margin of safety as defined in the basis for a TS
! and, thus, a USQ is involved according to 10 CFR 50.59. Calculations by the inspectors indicated that the worst pump condition would provide 182 gpm (to
! the SGs); however, instrumentation inaccuracies were not included which could lower the capacity further. The licensee agreed that the 200 gpm could not be j delivered to the SGs against the highest potential pressure (the secondary
- relief valve setpoint plus accumulation). The licensee also told the
- inspectors that 200 gpm to the SGs (240 gpa pump capacity) had been used in their accident analyses.
j' RESP 0ESE..10.. ISSUE 1 I The staff agrees with the inspectors' conclusion that 200 gpm to the SGs (240 l- gpm total pump capacity) is the capacity that should be used as the basis for the TSs. This is because 240 gpm is the pump capacity that is assumed in the
. licensee's Chapter 14 accident analyses in the USAR. While 160 gpm may be j sufficient to remove decay heat and protect the core, it is not necessarily sufficient to meet all of the acceptance criteria used for accident analysis.
i If it is the licensee's intent not to restore the AFW pumps to the design i capacity, then revised Chapter 14 analyses (and other design-basis analyses l where 240 gpm capacity pumps were assumed such as station blackout, ATWS, and 1 fire protection safe shutdown) need to be performed and submitted along with j other appropriate USAR changes. The revised analyses would reduce the margin l cf safety as defined in the basis for the TSs. Therefore, proposed revisions to the Chapter 14 analyses would require the staff's approval.
l For the current situation, the plant should be considered outside of its
{ design basis and should have an operability determination that the AFW pumps .
! are still operable based on an appropriate analysis. The pumps may be 4
considered degraded, but operable based on Generic Letter 91-18. We are also l concerned that the acceptance criteri established to perform pump testing in
! accordance with the ASME Code allow the hydraulic performance of the AFW pumps l to degrade below the design condition. Although the Code does not require
- inservice testing to be performed at the flow rate specified in the safety i analysis, acceptance criteria must be established to prevent pump performance l from degrading below the required performance at the design-basis condition.
It appears that the pumps have degraded to below the point where they should l have been declared inoperable following ASME Code testing.
l The staff concludes that the design capacities (240 gpa) of the AFW pumps are
- . the current licensing and design basis. The licensee, therefore, should have
- declared the pumps degraded, made an operability determination, and
! established a long-term corrective action plan. However, if the licensee proposes to reduce the design-basis flow capacity of the AFW pumps, the licensee would have to get prior staff approval because it results
- in a USQ by reducing the safety margin used as a basis for the TSs.
l
-m .. , - , .
i.'
i i j
a i
l 2
ISSUE 2 -
. The inspectors also identified that a modification to provide AFW pump i protection may have involved a USQ. The modification installed a low l discharge pressure AFW pump trip. Inspectors identified that in the event of
- a faulted SG, a low discharge pressure would exist. If only two of.the three l pumps automatically started, their output would not be sufficient to maintain the discharge pressure above the setpoint of the trip, and both pumps would quickly trip. The safety evaluation for the modification and station l procedures did not recognize this as an expected result. One of the design i bases in Section 6.6.3 of the USAR states that the AFW pumps are capable of 4
automatically starting and delivering full flow within 1 minute after the j signal for pump operation. The inspectors concluded that the pumps tripping l during an event was a possible malfunction not previously evaluated and, i therefore, a USQ.
l The licensee believes that this condition was bounded by earlier reviews. A i January 3, 1996, revision to the TSs authorized low power throttling of the i AFW discharge valves and placing the pump control in the " pullout" position.
l The TS basis B3.4.b also indicated that this could have been acceptable at all power levels. In addition, the licensee also believed that this potential was i reviewed in response to Bulletin 80-04, " Steam Line Breaks with Continued l Feedwater Addition"; however, the low discharge pressure pump trips did not i exist at that time. Also, the USAR Chapter 14 accident analysis for a steam l line break considers a single failure as "one failure in the Auxiliary FW
- runout protection system." This implies that when the other single failure i cases were analyzed, they included AFW pump runout protection trips. To the i inspectors, these references were not specific enough to conclude that the j reviews were bounding. .
! RESPONSE TO ISSUE 2
! The staff does not totally agree with the licensee's response to the
- inspectors regarding the pump trip condition being bounded by the earlier i reviews cited. The analysis for the 1996 TS revision demonstrated that there
, was adequate time (10 minutes) to protect the plant with reliance only on
, operator action to initiate AFW flow to an intact SG. However, operator actions to initiate AFW to an intact SG may vary significantly from the conditions assumed in the TS evaluation (control room pump switch in the
- pullout position) compared to the conditions that may occur from unexpected
- pump trips. The probability of failure to restart (particularly for restarting the TD pump) within 10 minutes following pump trips is likely to be
. higher than the probability of failure to start with the switch in the pullout i position. Also, the staff only accepted manual actions to initiate AFW flow
! following an accident or transient with reactor power below 15 percent.
Although the analyses may show that there is no significant safety concern associated with manually restarting the pumps following a steam line break, i
- m. ._ _. _ _ _ _ . . _ _ _ _ _ _ _ _ . ._._. _ _ _ _ _ _ ____
l . '
- l . *
, i 4
! the resulting pump trips following a faulted SG (steam or feed line break)
{ should be considered as outside the plant licensing basis.
! The licensee's reference to the single failure of AFW pump runout protection
! implies that the purpose of the low discharge pressure trips is to trip the
- AFW pumps following a steam line break. However, as described in USAR j Chapter 6.6, the trips were added to protect the AFW pumps from a loss of the i condensate storage tank (CST) which is not seismic and not protected against >
l tornado missiles. It should be noted that (for containment and core effects) l an AFW pump trip following a main steam line break may be preferred (more conservative) when compared to continued AFW flow to the faulted SG. However,
! if the low discharge pressure trip was considered to provide pump runout l , protection, then the safety evaluation for the modification and the plant
- emergency procedures should have included the pump trips following a faulted SG as an expected result of the installation of the low discharge pressure trip, l
i The staff considered that the addition of an AFW pump low discharge pressure
! trip would involve a USQ. However, prior staff approval (as required by
{ 50.59) of this particular design change was.given by the staff in a letter j dated June 6, 1993. This design change is associated with a post TMI-1
- comitment made by the licensee to install low suction pressure trips to i protect the AFW pumps from a loss of the non-seismic Category I CST (not i
installed for pump runout protection during a steam line break). In a May 7, 1993, letter, the licensee indicated that in lieu of a low suction pressure i i trip, a low discharge pressure trip would be installed to alleviate concerns '
- associated with the need for sub-atmospheric trip setpoints. Based on the
! staff's prior approval, we conclude that the licensee adequately addressed the l requirements of 10 CFR 50.59. However, we also conclude that the licensee's e i evaluation of the design change was inadequate in that it failed to identify i
the potential failure mode identified by the inspectors in the recent SSOPI.
The licensee should have performed an operability determination when the new
- failure mode was discovered and should have plans to rectify any deficiencies.
i Additionally, the USAR Chapter 14 reference to a failure in the AFW runout protection system was added to the ijSAR in a November 1995 revision. However, to our knowledge the runout protection system is not described nor discussed i
anywhere else in the USAR. The licensee should revise the USAR to be consistent with the Chapter 14 analysis and with the existing plant design.
SUP91ARY OF CONCLUSIONS l At the present time, we have not identified any USQs related to these two
- issues. However, for Issue 1, if the licensee plans to change the design l basis for the AFW system (as a long-term fix) by reducing the design AFW flow
, of the pumps, then prior staff approval is necessary because these design l changes would involve a USQ. Regarding Issue 2, the licensee should perform a
- new evaluation under 50.59 for revisions to the emergency procedures. During i
1 5
- 4. - ,, _, - . . _ . .
( "
that evaluation, the licensee should determine if a USQ is involved with those revisions. Since prior staff approval was obtained for the modification, and the existing main steam and feedwater line break analyses already rely on operator action to isolate the affected SG and ensure adequate AFW flow to the intact SG, the staff does not anticipate that the changes would involve a USQ.
The licensee should also revise 611 applicable sections of the USAR to be consistent with the actual plant design and the Chapter 14 analys_es.-
Principal Contributors: Bill LeFave (SPLB), 415-3285 Chu-Yu Liang (SkXB), 415-2078 Joseph Colaccino (EMEB), 415-2753 Date: April 1, 1997 4