Forwards Original & Amend 37 to Security Plan.Encl Withheld (Ref 10CFR73.21)
ML20078S373
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/15/1995
From: Simpson B
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03250-ECS-A, 102-3250-ECS-A, NUDOCS 9502240106
Download: ML20078S373 (7)


Text

_ ,

SA:EGUARDS 10 CFR 50.54(p)(2) l Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P O BOX 52034 = PHOENIX ARIZONA 85072-2034 102-03250-ECS/AKK/JAK ,

eERTSi%$"

c February 15,1995 <

NUCLE AR $vPPOf41 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20S55-0001

Dear Sirs:

Subject:

Palo VeNa Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Security Plan Amendrdent 37 File: 95-006-493: 95-056-026 Enclosed please find an original and three copies (controlled copy numbers 8-3,8-4, and 8-9) of Amendment 37 to the PVNGS Security Plan. The three controlled copies contain replacement pages for copies of the Security Plan pret ioush submitted to the NRC. In accordance with 10 CFR 50.4(b)(4)(iii), and by copy of this IMter, Arizona Public Service Company (APS) is forwarding two controlled copies of Amendment Tr to the Regional Administrator, NRC Region IV.

This amendment does not decrease the effectiveness of the Security Plan, and therefore, is being made pursuant to 10 CFR 50.54(p). A summary of the Onanges is included as Enclosure 1 and the caginal of Security Plan Amendment 37 is included as Enclosure 2.

APS has determined that the original of the Security Plan, and the replacement pages, >

contain Gafeguards Information and are subject to the controls of 10 CFR 73.21. These pages, so designated, are to be withheld from public disclosure ia accordance with the provisions of 10 CFR 2.790(d) and should nA be placed in the Public Document Room.

Should you have any questions, please call Larry K. Houghtb at (602) 393-2527.  ;

Sincerely, EMAJ

~ Ecs \

ECS/AKK/JAK/rv 950224o106 95o215 Enclosures hDR ADGCK 0500 8 / h (

=m= =mus SA,:EGUARJS USEGUARDS INFORMATION.

1TPON SEPARATION THIS

- v e.r_ te necmrmt t r'

,~

.# 4 ', g l

U. S. Nuclear Regulatory Commission Document Control Desk Security Plan Amendment 37 Page 2 cc: L. J. Callan (w/ Enclosures and two controlled copies)

T. W. Dexter A. B. Earnest K. E. Perkins K. E. Johnston E. W. McPeek e

INCLOSURE CONTAINS stiFIG"ARDS INFORMATION.

TON SEPARATION THIS ~ ~ " ' ~ ~ ' '

hAGEISDECONTROLLED.

m .

,,r,  :

e: r . '. 164 ?,UD l

?

-?

! U. S. Nuclear RegulatoryICommission  :

Document Control Desk  !

Security Plan Amendment 37- -l

' Page 3 j I

bec: A. K. Krainik (7636) (w/o Enclosures)  ;

B. A. Grabo (7636) (w/o Enclosures)

L. K. Houghtby (6105)- (w/ Enclosures) l L. G. Leavitt (6122) (w/ Enclosures)

R. E. Geiger (7465) (w/o Enclosures)

Source Document

- Library (7747) (w/o Enclosures)

I

'i t

5 f

'l s i

i

?

p g $ O

.AFE3"fr 3 ISTChMA71 3 [
3. T73?.C?r y inc *2 3 t='- -"
  • 5 m  ? .
gg g ;;;C
.T3PLLC, s' ~ --  !

I 3MEE.9-s,S,I'..C ENCLOSURE 1 Summary of Security Plan Amendment 37 TECLO:UPI CCNTAINS

"'?TSUAPOS INFORMATION.

'JI-ON 2CPARATION THIS

'.3I 1; :ICONTROLLID.

  • .-~

[ yg

) ,. SAFEGUARDS INFORMATION

'1 h, Wh:n- secarated Mm Enclosur* -i 7ancte inis Eccumam a 0xcwollen Following are changes made in Amendment 37 of the PVNGS Security Plan.

l Amendment 37 has been reformatted. Title and position changes l have been made throughout the document. Amendment 37 has l been formatted to single page rather than duplex. Blank pages have been removed. Amendment 37 is being submitted in its entirety, f o

1. Ornanizational Structure PVNGS has made the following changes in its organization:

l Executive Vice President. Nuclear - This position has not changed. The Executive Vice President, t Nuclear reports directly to the President /CEO of APS and is directly responsible for all Nuclear activities i

' at PVNGS.  ;

i Vice President. Nuclear Production - The Vice President, Nuclear Produdion, reports to the Executive i Vice President and is responsible for all activities directly related to the operation of the 3 Units.  !

Vice President. Nuclear Support - The Vice President, Nuclear Support, reports to the Executive Vice President and is responsible for all support activities including Nuclear Security.

Unit Operations Mananers - This position replaces the Unit Managers position.. The Unit Operations }

Manager is responsible for the day-to-day activities in their respect Un!!. '  !

i Director. PVNGS Services -This position has been removed from the PVNGS Organization. The {

Security Department Leader (Manager) no longer reports through this position.

Security Department Leader - The Security Manager title has been change to Security Department l Leader. The Security Department Leader repc rts directly to the Vice President, Nuclear Support and no i longer reports through a Director. The Secunty Department Leader is responsible for all activities of the FVNGS Security department.

Security Operations Section Leader- This is a new position. The Security operations Section Leader  ;

reports to the Security Department Leader and is responsible for supervising the day-to-day activities of the Security Operations section. i i

Security Administration Section Leader- This position title replaces the Administration and Technical l Supervisor. The Secunty Administration Section Luder reports to the Security Department Leader and  ;

is responsible for administrative activities such as the Security Plan, procedures, Safeguards program and 73.71 reporting.

  • i Security Access Control /CPF 8ect6on Leader- This position title has changed from Access Contml &

Training Supervisor. This position no longer is responsible for training activities. The Access .j Control /CPF Section Leader reports to the Security Department Leader and is responsible for  !

background invastigations and authorization of unescorted access to the PVNGS Protected / Vital areas. l SecurPy Traininn Section Leader - This position reports to the Secunty Department Leader and is r responsible for all training activities of the PVNGS Security department.

l l

l {

SAFEGUARDS INFORMATION j I

_. _ , .~.

.t. ._

SAFEGUARDS INFORMATION Nhen separatc.c f rom i~:,c::3an:,

- Mand!e inis 00:am:nt 0; 2.nu a.m,i Security Shift Team Leader- This position has change from Security Shift Supervisor. The Security Shift Team Leader reports to the Security Operations Section Leader and is rnainly responsible for the day-to-day activities of the onshift Security personnelin the Protected Area.

Security Shift Scrwant - This position's title and responsibilities have not changed.

A diagram of the Reporting structure for the Security Organization is found on page 1-30.

2. Access Authorization Authorization for unescorted / escorted access is now the responsibility of the Vice President, Nuclear Production or personnel designated by him/her.  ;
3. Other Chanaes P A description of Seismic Gaps between buildings of each Unit has been added on Page 5-3. Each building in a Unit has required seismic gaps between the buildings to meet federal requirements for structures at nuclear facilities.

Section 1.4.7 - Page 1 The wording

  • except as noted in section 8.2" has been removed from the second paragraph. This was done at the request of the NRC from review of amendment 35 & 36.

Section 4.4, Page 4 Deleted the statement

  • There are no fixed posts as defensive positions in the Protected Area". Security presently utilizes a fixed post to provide for ths Design Basis Threat.

Section 8..'- .?ge 8-6, General - The word " specific" was removed from the second paragraph which read .. . " designed to protect specific Vital equipment". This was done at the request of the NRC from review of amendment 35 & 36.

I Page 1 A new organizational chart has been added.

" When separated from Enclosures, v a.::!c Ws Co mnt as Da:cnt Fed 2

SAFEGUARDS INFORMATION

.c  ;

SAFEGUARDS INFORMATION i When separated from Enclosures.

I

'4ancle rms Cocument as Cacat cuac ,

?

f ENCLOSURE B Security Plan Amendment 37  !

L I

1 l

l I

l 1

When teD3ra!0d ' Om Enc'- ,';--e

  • fC' 3 .C;u?ni .. ..,___ - -

SAFEGUARDS INFORMATION w _ _- _ _ _ _ _ _ _ __ __ . -- . -- -,

t.

, i '. A d . .:,J b ENCLOSURE 2 Security Plan Amendment 37 Ef!CLCSURE CCNTAINS CATEGUARDS INFORMATION.

'JTCN Tr.'?.ULATION THIS 0 .i p 7 ' ' ' ' ' ' '

'aGZ 10 DECON* ROLLED. -

1 i