ML20077S455
From kanterella
ML20077S455 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 01/09/1995 |
From: | NORTHERN STATES POWER CO. |
To: | |
Shared Package | |
ML20077S435 | List: |
References | |
NUDOCS 9501240100 | |
Download: ML20077S455 (3) | |
Similar Documents at Monticello | |
---|---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217C6321999-09-30030 September 1999
[Table view]Proposed Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys, Eliminating Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time ML20211G0391999-02-10010 February 1999 Revised ODCM, Including Revs to Revised ODCM Index,Odcm 01.01 Page 2 Paragraph 1,ODCM 02.01 Page 2 Section 1.0,ODCM 05.01 Page 2 Sections 1.0,2.0 & 3.0 & ODCM 13.05 Page 2 ML20203B3191999-01-28028 January 1999 Proposed Tech Specs Page 60d,incorporating Approved Amend 103 Changes for Use by NRC in Issuing SER ML20206P1331998-12-31031 December 1998 Proposed Tech Specs,Revising pressure-temp Limit Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS ML20154L9551998-10-12012 October 1998 Proposed Tech Specs Re Rev of Statement on Normal Shift Length & Other Misc Changes ML20154L9041998-10-0909 October 1998 Proposed Tech Specs,Incorporating Proposed Changes Re Surveillance Test Interval/Aot Extension Program ML20153F0191998-09-25025 September 1998 Proposed Tech Specs Pages Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer ML20237E9771998-08-20020 August 1998 Rev 4 to EWI-09.04.01, Inservice Testing Program ML20236P5421998-07-0101 July 1998 Proposed Tech Specs Pages 30,50 & 53 Containing Administrative Changes Re Power Rerate Program ML20249C5121998-06-19019 June 1998 Proposed Tech Specs Pages Re Rev 2 to 960726 LAR to License DPR-22,to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of Radiological Consequences of MSLB Accident ML20247K6341998-05-12012 May 1998 Proposed Reprinted Tech Specs Bases Pages,Containing Spelling & Grammatical Corrections ML20216D0021998-03-19019 March 1998 Proposed Tech Specs,Providing Consistent Wording Throughout TS & Providing Sound Basis for Frequency of Actions Required Each Shift ML20248L2001998-03-13013 March 1998 Proposed Tech Specs Revising SLMCPR B210059, Rev 1 to GE-NE-B2100594-1, Radiological Analyses of Design Basis Accidents1998-03-0909 March 1998 Rev 1 to GE-NE-B2100594-1, Radiological Analyses of Design Basis Accidents ML20248L4101998-03-0606 March 1998 Revised Page 39 to Proposed TS Change ML20202H7061997-12-0404 December 1997 Proposed Tech Specs Increasing Plant Max Power Level from 1670 Mwt to 1775 Mwt ML20203A9771997-11-25025 November 1997 Proposed Tech Specs Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer ML20199H5281997-11-0606 November 1997 Software Requirement Specification (SRS) ERDS-SRS-1-3, Process Computer Sys - Emergency Response Data Sys (ERDS) - Data Point Library ML20211J9801997-09-29029 September 1997 Proposed Tech Specs Page 249b & Cleaned Typed Page 249b, Adding Footnote to Topical Rept NEDE-24011-P-A Stating That Topical Rept Is Approved for Cycle 18 Only ML20210Q2971997-08-21021 August 1997 Proposed Tech Specs Re Safety Limit Min Critical Power Ratio ML20141B9181997-06-19019 June 1997 Proposed Tech Specs Re Update of Design Basis Accident Containment Temp & Pressure Response ML20137W2201997-04-11011 April 1997 Proposed Tech Specs 3.6.C Re Coolant Chemistry & TS 3/4.17B Re Control Room Emergency Filtration Sys ML20137B5081997-03-12012 March 1997 Rev 2 to Inservice Insp Exam Plan ML20149M7281997-01-23023 January 1997 Proposed Tech Specs 3.5/4.5.C of TS Bases Describing Min RHR & RHRSW Pump Requirements for Post Accident Containment Heat Removal & Submit Update to Design Basis Accident Containment Temp & Pressure Response ML20132C6531996-11-25025 November 1996 Proposed Tech Specs,Sections 2.1.A Re SLMCPR & 3.11.C Re Olmcpr.Changes Revise SLMCPR Values & Deletes Sentence Re OLMCPR Limit Penalty for Single Recirculation Loop Operation ML20117A1551996-08-15015 August 1996 Proposed Tech Specs Re Revision to TS Administrative Controls Section 6.1.F.1 Stating That Either 8 or 12 H Shifts Will Be Considered Normal & 40 H Will Be Considered Nominal ML20116G8951996-07-26026 July 1996 Proposed Tech Specs Increasing Max Power Level by 6.3% to 1,775 from 1,670 Mwt.Summary of Plant Mods for Power Rerate Implementation & Power Rerate Environ Evaluation Encl ML20116D8361996-07-26026 July 1996 Proposed TS Sections 3.6.C & 3/4.17.B Re Reactor Coolant Equivalent Radioiodine Concentration & CR Habitability ML20115D8621996-06-28028 June 1996 Rev 3 to Engineering Work Instruction (Ewi) EWI-09.04.01, Inservice Testing Program ML20100Q3861996-03-0101 March 1996 Proposed Tech Specs Re Periodic Replacement of Containment Purge & Vent Valve Seat Seal ML20095J4341995-12-20020 December 1995 Proposed Tech Specs Re Main Steam Isolation & App J Leak Rate Test Requirements ML20095E7121995-12-11011 December 1995 Proposed Tech Specs,Removing TS SR 4.7.D.4 & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs ML20094M1981995-11-14014 November 1995 Proposed Tech Specs,Incorporating Requirements of Option B, Section Iii.A for Type a Testing (Primary Containment ILRT) ML20100M4821995-08-29029 August 1995 Revised Sections to Odcm,Including Rev 1 to ODCM-03.01,Rev 1 to ODCM-12.05 & Rev 1 to ODCM-13.05.5 ML20091K6821995-08-18018 August 1995 Proposed Tech Specs Section 3.7/4.7 SGTS ML20087J4251995-08-15015 August 1995 Proposed Tech Specs,Revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh ML20086D8011995-07-0505 July 1995 Proposed Tech Specs Extending Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation ML20085N0991995-06-22022 June 1995 Proposed Tech Specs Supporting Implementation of BWR Thermal Hydraulic Stability Solution ML20083Q8411995-05-18018 May 1995 Rewrite of Rev 2 to Engineering Work Instruction (Ewi) EWI-09.04.01, Inservice Testing Program ML20082N8711995-04-20020 April 1995 Proposed Tech Specs Re SBGTS & Secondary Containment ML20077S4551995-01-0909 January 1995 Startup Physics Testing Rept,Cycle 17 ML20069J1061994-06-0808 June 1994 Proposed TS Re SGTS & Secondary Containment ML20072P8011994-05-17017 May 1994 Rev 8 to Process Control Program, Installed Atcor Solidification Sys ML20065B6691994-03-28028 March 1994 Proposed Tech Specs Re Approved Analytical Methods for Developing Core Operating Limits Rept ML20065B6991994-03-28028 March 1994 Proposed Tech Specs Re Standby Gas Treatment Sys Initiation Instumentation ML20072P8101994-02-22022 February 1994 Offsite Dose Calculation Manual, Rev 0 ML20063C9941994-01-26026 January 1994 Proposed Tech Specs,Requiring Valves to Be Tested at Pressure Greater than or Equal to Calculated Peak Containment Internal Pressure Re Design Basis LOCA ML20062N8731994-01-0404 January 1994 Proposed Tech Specs 3.11, Reactor Fuel Assemblies & Bases Re Methodology for MCPR ML20059E6041994-01-0303 January 1994 Proposed Tech Specs,Revising Surveillance Requirement 4.6.E.1.a to Require Valves to Be Tested Per Section XI Inservice Testing Requirements of ASME Boiler & Pressure Vessel Code ML1132102881993-11-30030 November 1993 Proposed Tech Specs Re Removal of Chlorine Detection Requirements & Changes to Control Room Ventilation Sys Requirements 1999-09-30 Category:TEST REPORT MONTHYEARB210059, Rev 1 to GE-NE-B2100594-1, Radiological Analyses of Design Basis Accidents1998-03-0909 March 1998
[Table view]Rev 1 to GE-NE-B2100594-1, Radiological Analyses of Design Basis Accidents ML20077S4551995-01-0909 January 1995 Startup Physics Testing Rept,Cycle 17 ML20107E0741984-11-0505 November 1984 Rev 1 to Final Rept on Exam,Testing & Evaluation of Irradiated Pressure Vessel Surveillance from Monticello Nuclear Generating Plant ML20066K0021982-11-30030 November 1982 to Design Rept for Recirculation Line Safe-End & Elbow Repairs,Monticello Nuclear Generating Plant ML20066K0661982-10-31031 October 1982 to Design Rept for Recirculation Line End Cap Repair,Monticello Nuclear Generating Plant ML19295A6301980-09-19019 September 1980 Smoke Simulation Testing at Monticello Nuclear Generating Plant. ML20127G5411972-06-12012 June 1972 Vibration Test Summary Rept 1998-03-09 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20077S455&oldid=2763333"