Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 January 9,1995 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Startuo Physics Testino Report. Cycle 17 The Monticello Cycle 17 Startup Physics Testing Report is attached. Startup physics testing consisted of three aspects; (1) a shutdown margin demonstration, (2) one benchmark critical i
and one in-sequence critical, and (3) temperature coefficient data collection. Section 6.7.A.1 of the Monticello Technical Specifications requires that a Startup Report be submitted within 90 days following resumption of commercial operation with fuel installed that has a different design or that has been manufactured by a different fuel supplier. Cycle 17 is the first Monticello cycle to utilize a core loading which includes 8 bundles of the Siemens 9x9-IX (also called the ATRIUM 98) design.
This submittal contains no new NRC commitments nor does it modify any existing commitments. Please contact Marv Engen, Sr Licensing Engineer, at (612) 295-1291 if you require furtherinformation.
4 *
& V =k Roger O Anderson Director Licensing and Management issues I
c:
Regional Administrator-lli, NRC NRR Project Manager, NRC Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg Attachment A - Startup Physics Testing Report, Cycle 17 H: \\ DATA \\NRCCORR\\ C17SUR PT. DOC 9501240092 950109 PDR ADDCK 05000263 e