Corrected LER 84-018-00:on 840414,shutdown Cooling Sys Isolation Occurred When Technician Lifted Wrong Lead During Performance of Monthly Surveillance.Technician Reprimanded, Lead Terminated & Shutdown Cooling Restored
ML20084P280
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/10/1984
From: Byrd R, Dale L
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
AECM-84-0272, AECM-84-272, LER-84-018-01, LER-84-18-1, NUDOCS 8405180083
Download: ML20084P280 (3)


LER-2084-018, Corrected LER 84-018-00:on 840414,shutdown Cooling Sys Isolation Occurred When Technician Lifted Wrong Lead During Performance of Monthly Surveillance.Technician Reprimanded, Lead Terminated & Shutdown Cooling Restored
Event date:
Report date:
4162084018R00 - NRC Website

text

_

Attcchtsnt to AECM-84/0272

't .

UA NUCLEJ.2(ELULATORY COamsimeoN mRC Form M , .

!

  • APNt0VE3 Dess se0. 3190 4104 LICENSEE EVENT REPORT (LER)

PAGE 336 DOCatT NUGABER tal FACILITY NAAAB til Grrnd Gulf Nuclear Station - Unit 1 0l5101010l4l116 1 lOFl0 f 2 TITLE 446 Shutdown Cooling' Isolation During Surveillance Testing LER NunsetR tel RGroRT DAf t (7) OTHER P ACILITitt INvoLvt0 mi tv0NT DAf t (S)

"' P ACu tTv mAnsee DOCKET NUnsetRist teONTM DAY YEAR YEAR "b* 'n  %

MONTM OAV vtAR NA 015l0l0l0l l4 0l4 1l4 8 4 8 l4 0 l 1l 8 0l0 3 l5 1l0 8l4 s e 0 1 510 1 0 1 0 1 l l gg, TMIS REPORT IB SFTTED PURSUANT TO TMt REQUIREMENTS OF 10 CFR S (Chece one er more e ene asueenn e Itil "o**

  • 4 Se.eaem _

3e.assi.i j es.73wt3HNi _

rs.7:w 90.734sH3Hel 71.716st R 38.eN4sHilte 08.24eH1) n., o i ni n

...Hu.

.miGn. _ gy,g,;,,g 30.734sil3 HvielHA) JESAJ 30.4 (sH1 Hell) 08.730slGH4 30.73tstGH5) gg.73tsH3HeilllBI 38.4eS4sH1 Heel te.730slGHilli SS 73dett3Hal 30.454sH1Hvi LICEluSEE CONTACT POR TMit LER (131 TELtPMONE NUMSER teAnst AREA CODE Ronald W. Byrd/ Licensing Engineer 6p[ 4 p ,7 l i 2i 1l4 l9 ConsPLif t ONE Liest FOR EACH COREPONENT F AILURE DESCRISED IN TM48 RtPORT (13) mP CAUst sysTIM CoasPONtNT "" $'g AC- O CAUS$ SYSTGM COesPONENT "(X[ "h'O l l i I I l l l i I I i i I 1

i 1 1 I I I I I I I I I I I MONTM DAY vtAR OUPPLEMENTAL R4 PORT ERPGCTED (14 SUOMISSION kQ l l l 189 (19 ven. eenmees EMPtCTfD DVOni!3Ss04 O&TC)

AssTR Ac7 rL-e . e.se . a. .,e.- na .,. - ,,s . e., o ,

While performing a Reactor Water Cleanup System (RWCU) functional test, a technician lifted the wrong lead causing an isolation of Shutdown Cooling.

The error was immediately recognized, the lead was terminated and Shutdown Cooling was restored.

8405180083 840510 PDR ADOCK 05000416 S

h[

PDR ll"AT--"

Attcchunt to AECM-84/0272

o. U.S couCLlan EELULATony Conswissaces '

Nec ,oresassa

" LIC5NSEE' EVENT REPORT (LER) TEXT CONTINUATION ae,aovao owe eso mo-eios Expent$ 8/3146 00CRET """" A GI paOS (31

.actLafy seases its Len eeuness te6 sa i g',4 6 . ;

we

  • vtan em Grand Gulf Nuclear Station - Unit 1 0 15 l o l o l 0 l 411 l6 814 -

0 l1 l8 -

0l0 0l2 0F 0 [2 rixT o s, . w w mac a assaw nn A Shutdown-Cooling System isolation occurred at 0208 hours0.00241 days <br />0.0578 hours <br />3.439153e-4 weeks <br />7.9144e-5 months <br /> on April 14, 1984, f when a utility technician lifted the wrong lead during performance of a monthly surveillance. The wire leads required to be lifted in the performance of certain tests were recently labeled to ensure the identification of the correct lead. The technician had identified the correct lead by examination  :

of the label. He was momentarily distracted however, and in relocating the 1ead chose the incorrect termination modulus. i The procedure instructed the technician to lift lead TB16 (+) to TM30, panel l 1H13-P713D. After identifying the correct lead, he looked away to obtain a  !

l screwdriver, he then proceeded to lif t the thermocouple lead TB16 (+) at TM29. '

The lifted lead caused the RHR A equipment area differential temperature  ;

switch to actuato. The technician immediately terminated the wire.

Operations then restored shutdown cooling to operation. ,

The technician was given a letter of reprimand for the error which was i contrary to the procedure. No hardware or procedural changes are considered necessary. This is submitted'as a final report. l l

i i

{ l l

t i

i  !

l l

l F1RM MA

s, ps.j -

2 / r E MISSISSIPPI POWER & LIGHT COMPANY f Helping Build Mississippi P. O. BOX 1840. J ACKSON. MISSISSIPPI 39205 May 10, 1984

\\ CORRECTED COPY://

Report Date on page 1 of the nuctaan encoucnow otrAnmcNT attachment was left blank--

Document Control Desk should have been 5/10/84. #

U. S. Nuclehr Regulatory Commission Washington, D. C. 20555 Gentlemen:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File: 0260/L-835.0 Shutdown Cooling Isolation During Surveillance Testing LER 84-018-0 ,

AECM-84/0272 l Attached is Licensee Event Report (LER) 84-018-0 which is a final report.

Yours truly.

~ '?  %

L. F. Dale Manager of Nuclear Services EBS/SHH:rg Attachment cc: Mr. J. B. Richard (w/a)

Mr. R. B. McGehee (w/o)

Mr. N. S. Reynolds (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. J. P. O'Reilly, Regional Administrator (w/a)

U. S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30303

'/

Member Middle South Utilities System