ML20086B847

From kanterella
Revision as of 18:48, 15 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 11 to Security Training & Qualification Plan, Per 10CFR50.54(p)(2).Encl Withheld
ML20086B847
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/29/1995
From: Simpson B
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03404-ECS-S, 102-3404-ECS-S, NUDOCS 9507060126
Download: ML20086B847 (1)


Text

. - ____ _ _ _ _ .

,N i a I

p. 10 CFR 50.54(p)(2) g Arizona Public Service Company PALO VERDE NOCLEAR GENERATING STATION

P O BOX 52034 . PHOENIX. arf 2ONA 85072-2034 -

102-03404-ECS/SAB/DRL i

BER

,  ? SON June 29,1995 NUCLfAR SUPPORT U. S. Nuclear Regulatory Commission ATRt Document Control Desk .

Mail Staticn P1-37

'Nashington, DC 20555-0001 l

Dear Sirs:

j

Subject:

Palo Verde Nuclear Generating Station (PVNGS)  ;

e Units 1,2, and 3 l Docket Nos. STN 50-528/529/530 f Security Training and Qualification Plan, Revision 11  ;

I In accordance with 10 CFR 50.4(b)(4)(iiij, APS is forwarding two copies of Revision 11 to the Security Training and Qualification Plan to the Regional Administrator, NRC Region IV. This -

revision does not decrease the effectiveness of the Security Training and Qualification Plan and is being submitted pursuant to 10 CFR 50.54(p)(2). Revision 11 to the PVNGS Secunty Training and Qualification Plan will reflect a more precise clarification to Section 1, Employment Suitability and Qualification; Subssction 1.0, Suitability.

APS has determined that the Security Training and Qua!ification Plan is a proprietary document and is subject to the controls of 10 CFR 2.790(d). APS requests that the enclosure be withheld from public disclosure in accordance with the provisions of.10 CFR 2.790(d) and should Do_1 be placed in the Public Document Room. ,

Should you have any further questions, please call Larry Houghtby at (602) 393-2527.

Sincerely, -

ECS/SAB/DRUdim Enclosures

1. Summary of Changes to PVNGS Security Training and Qualification Plan, Revision 11
2. PVNGS Security Training and Qualification Plan, Revision 11 cc:- L J. Callan (w/ enclosures and two controlled copies) l

. De L K E. Perkins i L K E. Johnston (7393)

L E. W. McPeek 9507060126 95o629 ,

g ADOCK 05000528 . )1 PDR

p. PDR p- . _ - - -__ - __ _ _ _ -

,fi