MONTHYEARML20217G6441999-10-13013 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2.Non-proprietary & Proprietary TS & Info Encl.Proprietary Encl Withheld ML20217B1121999-10-0404 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,to Revise TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 ML20212F3521999-09-22022 September 1999 Supplemental Application for Amend to Licenses NPF-68 & NPF-81,proposing Change to SR 3.8.1.13 to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5441999-08-30030 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,proposing to Raise Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7211999-08-26026 August 1999 Rev to 990413 Application for Amend to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 to Be IAW Versions of LCO 3.0.4 & SR 3.0.4 as They Appear in Rev 1 to NUREG-1431 ML20211E9031999-08-24024 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3111999-05-18018 May 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SRs 3.8.1.3 & 3.8.1.13 to Reduce Loading Requirements for DGs ML20206D6831999-04-28028 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,changing Licensing Basis from Present Requirement to Establish Containment Hydrogen Monitoring within 30 Minutes of Initiation of Safety Injection to within 90 Minutes of LOCA ML20205S3731999-04-19019 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS ML20205Q7781999-04-13013 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 That Appear in Existing TS to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as in Rev 1 to NUREG-1431 ML20154M9911998-10-15015 October 1998 Application for Amends to Licenses NPF-68 & NPF-81,deleting or Modifying Existing License Conditions Which Have Been Completed or Are No Longer in Effect ML20151U1931998-09-0303 September 1998 Application for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Short Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys.Ts Pages Encl ML20236R4631998-07-13013 July 1998 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protection Channels ML20236F1541998-06-26026 June 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20247K4891998-05-15015 May 1998 Suppl Application for Amend to Licenses NPF-78 & NPF-81 Ts. Amend Will Revise New Program 5.5.18 to Extent That Items B,C & D Ref to LCO Action Statement & Revises Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9371998-05-0808 May 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 5.5.7, RCP Flywheel Insp Program, by Specifying Alternate Flywheel Insp Once Every Ten Years ML20199A4041998-01-22022 January 1998 Application for Amends to Licenses NPF-68 & NPF-81,adding Conditions for DGs for Extended DG Completion Time of Fourteen Days ML20199G3721997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes That Would Facilitate Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20199J6591997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Change Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20217H8981997-08-0808 August 1997 Revised Application for Amends to Licenses NPF-68 & NPF-81, Revising TS Re Credit for Boron & Enrichment Increase for Fuel Storage ML20141A8121997-06-13013 June 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.4.10, Pressurizer Safety Valves, to Reduce Nominal Set Pressure by 1% to 2460 Psig & Increase Tolerance to +2% ML20128G9881996-10-0404 October 1996 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20117N6401996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81,changing TS Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20117N6311996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81, Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20101D4081996-03-0505 March 1996 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing TS to Improve for Westinghouse Plants as Represented by NUREG-1431 ML20094N3821995-11-20020 November 1995 Rev to 950501 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Convert Existing TS to Format & Content of NUREG-1431,Westinghouse Improved STS ML20093K2021995-10-16016 October 1995 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J ML20098A4801995-09-22022 September 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 ML20083M0551995-05-12012 May 1995 Application for Amend to License NPF-68,changing TS SR 4.6.1.2 to Support one-time Exemption from Section III.D.1(a) of 10CFR50,App J,Extending Interval for Type a Test from Scheduled 36 Months to Approx 54 Months ML20082T5591995-05-0101 May 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting TSs to Improved TSs for Westinghouse Plants as Represented in NUREG-1431 ML20081J4901995-03-17017 March 1995 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3.9.4 Re Containment Bldg Penetrations,To Allow Personnel Airlock to Be Open During Core Alterations or Movement of Irradiated Fuel within Containment ML20080F7781995-01-20020 January 1995 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 6.4.2 Re Plant Review Board Composition ML20079B1961994-12-29029 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Requesting to Add Automatic Load Sequencer to Plant ML20079A9411994-12-27027 December 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Ts,By Revising Leak Test Frequency for Valves W/Resilient Seals ML20077F2131994-12-0606 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Containment Spray Additive Sys ML20073K3761994-10-0303 October 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS Reactor Pressure Limits as Results of New Analyses That Account for Nonconservatisms Identified in NRC Info Notice 93-058 & Results of RPV Surveillance Capsule Exams ML20073B7181994-09-13013 September 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing Elimination of Containment Spray Additive Sys ML20072F1981994-08-16016 August 1994 Application for Amend to License NPF-68,eliminating Article 2.C.(6) & Associated Attachment 1 of License Re Diesel Maint & Surveillance ML20072F2151994-08-16016 August 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3/4.7.1.1 & Bases Re Setpoint Tolerance for Main Steam Safety Valves ML20070A9841994-06-24024 June 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Values of Z & for Pressurizer Pressure Reactor Trip Instrumentation Trip Setpoints to Allow Use of Alternate Types of Pressure Transmitters ML20069C7271994-05-20020 May 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Heat Flux Channel Factor,Fq(Z),Penalty of 2 Percent in Spec 4.2.2.2.f to cycle-specific COLR to Allow for burnup-dependent Values of Penalty in Excess of 2% ML20070M6711994-04-28028 April 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 3/3.8.1.1, AC Sources Operating, Based on GL 93-05,RG 1.9 & NUMARC 87-00,Rev 1 ML20065F8631994-03-31031 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Revising TS 3/4.7.1.1 & Bases Re Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML20064L7341994-03-18018 March 1994 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes to Ts,Incorporating Technical Substance of Corresponding Spec (LCO 3.3.3) from NUREG-1431,Rev 0 ML20064C7181994-03-0101 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Reinstating Exception 3.0.4 for TS 3.2.4, Quadrant Power Tilt Ratio, ML20063E0591994-02-0303 February 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.7.10,area Temp Monitoring to Section 16.3 of FSAR ML20059D2381993-12-30030 December 1993 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Allow One Time Extension of AOT for RHR Pumps from 3 to 7 Days.One Time Extension Necessary to Allow Mods to RHR Sys While Plant in Mode 1 ML20058A9291993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,proposing Revs to TS Re Dc Sources,Including Rev of SRs of Paragraphs 4.8.2.1.e & F & Table 4.8-2, Battery Srs ML20058A9451993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Table 3.3-2,stating That ESFAS Not Required in Mode 2 When AFW Operating to Supply Sfs.Footnote Will Be Applied to Applicable Modes for Functional Unit 6.e ML20058H9971993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.3.4, Turbine Overspeed Protection to Section 16.3 of Fsar.Ge Proprietary Rept GET-8039 Encl.Proprietary Rept Withheld,Per 10CFR2.790 1999-09-22
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217G6441999-10-13013 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2.Non-proprietary & Proprietary TS & Info Encl.Proprietary Encl Withheld ML20217B1121999-10-0404 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,to Revise TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 ML20212F3521999-09-22022 September 1999 Supplemental Application for Amend to Licenses NPF-68 & NPF-81,proposing Change to SR 3.8.1.13 to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5441999-08-30030 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,proposing to Raise Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7211999-08-26026 August 1999 Rev to 990413 Application for Amend to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 to Be IAW Versions of LCO 3.0.4 & SR 3.0.4 as They Appear in Rev 1 to NUREG-1431 ML20211E9031999-08-24024 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3111999-05-18018 May 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SRs 3.8.1.3 & 3.8.1.13 to Reduce Loading Requirements for DGs ML20206D6831999-04-28028 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,changing Licensing Basis from Present Requirement to Establish Containment Hydrogen Monitoring within 30 Minutes of Initiation of Safety Injection to within 90 Minutes of LOCA ML20205S3731999-04-19019 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS ML20205Q7781999-04-13013 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 That Appear in Existing TS to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as in Rev 1 to NUREG-1431 ML20154M9911998-10-15015 October 1998 Application for Amends to Licenses NPF-68 & NPF-81,deleting or Modifying Existing License Conditions Which Have Been Completed or Are No Longer in Effect ML20151U1931998-09-0303 September 1998 Application for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Short Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys.Ts Pages Encl ML20236R4631998-07-13013 July 1998 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protection Channels ML20236F1541998-06-26026 June 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20247K4891998-05-15015 May 1998 Suppl Application for Amend to Licenses NPF-78 & NPF-81 Ts. Amend Will Revise New Program 5.5.18 to Extent That Items B,C & D Ref to LCO Action Statement & Revises Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9371998-05-0808 May 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 5.5.7, RCP Flywheel Insp Program, by Specifying Alternate Flywheel Insp Once Every Ten Years ML20199A4041998-01-22022 January 1998 Application for Amends to Licenses NPF-68 & NPF-81,adding Conditions for DGs for Extended DG Completion Time of Fourteen Days ML20199J6591997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Change Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20199G3721997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes That Would Facilitate Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20217H8981997-08-0808 August 1997 Revised Application for Amends to Licenses NPF-68 & NPF-81, Revising TS Re Credit for Boron & Enrichment Increase for Fuel Storage ML20141A8121997-06-13013 June 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.4.10, Pressurizer Safety Valves, to Reduce Nominal Set Pressure by 1% to 2460 Psig & Increase Tolerance to +2% ML20128G9881996-10-0404 October 1996 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20117N6401996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81,changing TS Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20117N6311996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81, Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20101D4081996-03-0505 March 1996 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing TS to Improve for Westinghouse Plants as Represented by NUREG-1431 ML20094N3821995-11-20020 November 1995 Rev to 950501 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Convert Existing TS to Format & Content of NUREG-1431,Westinghouse Improved STS ML20093K2021995-10-16016 October 1995 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J ML20098A4801995-09-22022 September 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 ML20083M0551995-05-12012 May 1995 Application for Amend to License NPF-68,changing TS SR 4.6.1.2 to Support one-time Exemption from Section III.D.1(a) of 10CFR50,App J,Extending Interval for Type a Test from Scheduled 36 Months to Approx 54 Months ML20082T5591995-05-0101 May 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting TSs to Improved TSs for Westinghouse Plants as Represented in NUREG-1431 ML20081J4901995-03-17017 March 1995 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3.9.4 Re Containment Bldg Penetrations,To Allow Personnel Airlock to Be Open During Core Alterations or Movement of Irradiated Fuel within Containment ML20080F7781995-01-20020 January 1995 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 6.4.2 Re Plant Review Board Composition ML20079B1961994-12-29029 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Requesting to Add Automatic Load Sequencer to Plant ML20079A9411994-12-27027 December 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Ts,By Revising Leak Test Frequency for Valves W/Resilient Seals ML20077F2131994-12-0606 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Containment Spray Additive Sys ML20073K3761994-10-0303 October 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS Reactor Pressure Limits as Results of New Analyses That Account for Nonconservatisms Identified in NRC Info Notice 93-058 & Results of RPV Surveillance Capsule Exams ML20073B7181994-09-13013 September 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing Elimination of Containment Spray Additive Sys ML20072F1981994-08-16016 August 1994 Application for Amend to License NPF-68,eliminating Article 2.C.(6) & Associated Attachment 1 of License Re Diesel Maint & Surveillance ML20072F2151994-08-16016 August 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3/4.7.1.1 & Bases Re Setpoint Tolerance for Main Steam Safety Valves ML20070A9841994-06-24024 June 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Values of Z & for Pressurizer Pressure Reactor Trip Instrumentation Trip Setpoints to Allow Use of Alternate Types of Pressure Transmitters ML20069C7271994-05-20020 May 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Heat Flux Channel Factor,Fq(Z),Penalty of 2 Percent in Spec 4.2.2.2.f to cycle-specific COLR to Allow for burnup-dependent Values of Penalty in Excess of 2% ML20070M6711994-04-28028 April 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 3/3.8.1.1, AC Sources Operating, Based on GL 93-05,RG 1.9 & NUMARC 87-00,Rev 1 ML20065F8631994-03-31031 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Revising TS 3/4.7.1.1 & Bases Re Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML20064L7341994-03-18018 March 1994 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes to Ts,Incorporating Technical Substance of Corresponding Spec (LCO 3.3.3) from NUREG-1431,Rev 0 ML20064C7181994-03-0101 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Reinstating Exception 3.0.4 for TS 3.2.4, Quadrant Power Tilt Ratio, ML20063E0591994-02-0303 February 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.7.10,area Temp Monitoring to Section 16.3 of FSAR ML20059D2381993-12-30030 December 1993 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Allow One Time Extension of AOT for RHR Pumps from 3 to 7 Days.One Time Extension Necessary to Allow Mods to RHR Sys While Plant in Mode 1 ML20058A9451993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Table 3.3-2,stating That ESFAS Not Required in Mode 2 When AFW Operating to Supply Sfs.Footnote Will Be Applied to Applicable Modes for Functional Unit 6.e ML20058A9291993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,proposing Revs to TS Re Dc Sources,Including Rev of SRs of Paragraphs 4.8.2.1.e & F & Table 4.8-2, Battery Srs ML20058H9971993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.3.4, Turbine Overspeed Protection to Section 16.3 of Fsar.Ge Proprietary Rept GET-8039 Encl.Proprietary Rept Withheld,Per 10CFR2.790 1999-09-22
[Table view] |
Text
, ,
Georga Power Company 40 invemess CenWr Parkway
, Post oSce Bon 1295 Birrrangham Abbama 35201 Tetephone 205 877 7122 liarch 1,1994 .
m C. K. McCoy Georgia Power vce Pm9 dent Nudcar .
Vogde Progt . ge MWrn ehtoc system LCV4282 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECHNICAL SPECIFICATIONS REINSTATEMENT OF EXCEPTION TO 3.0.4 FOR SPECIFICATION 3.2.4 In accordance with the provisions of 10 CFR 50.90 and 10 CFR 50.59, Georgia Power Company (GPC) hereby proposes to amend the Vogtle Electric Generating Plant (VEGP)
Unit 1 and Unit 2 Technical Specifications, Appendix A to Operating Licenses NPF-68 and NPF-81.
The proposed revision will add an exception to the requirements of specification 3.0.4 for specification 3.2.4, quadrant power tilt ratio. This exception was part of the original Technical Specifications. Georgia Power Company requested that it be removed in conjunction with the revised wording of specification 3.0.4 based on NRC Generic Letter 87-09, which allows entry into an operational mode,or other specified condition, in compliance with the action requirements when conformance permits continued operation for an unlimited period of time. The action requirements for specification 3.2.4 allow continued operation at a power level above 50 percent power for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, aller which power is to be reduced to less than 50 percent if the quadrant power tilt ratio (QPTR) is not restored to within its limit. Specification 3.2.4 does not apply below 50 percent power.
In the case of specification 3.2.4, the revised wording of specification 3.0.4 prohibits raising power above 50 percent and entering the action statement if the QPTR has been determined to be out oflimit prior to exceeding 50 percent power. This has resulted in delays in returning to full power operation following a reactor shutdown.
Georgia Power Company requests that this change be approved by May 1,1994.
The proposed change and the basis for the change is described in enclosure I to this letter.
Enclosure 2 provides an evaluation pursuant to 10 CFR 50.92 showing that the proposed change does not involve significant hazards considerations. Instructions for incorporation n rs n 4 co n 9403100182 940301 4 DR ADOCK 0500 i
l l
Georgia Powe'r1 U. S. Nuclear Regulatory Commission Page 2 of the proposed change into the Technical Specifications and a copy of the change are provided in enclosure 3.
In accordance with 10 CFR 50.91, the designated state official will be sent a copy of this letter and all enclosures.
Mr. C. K. McCoy states that he is a vice president of Georgia Power Company and is authorized to execute this oath on behalf of Georgia power company and that, to the best of his knowledge and belief, the facts set forth in this letter and enclosures are true.
l GEORGIA POWER COMPANY By: k C. K. Mc oy Sworn to and subscribed before me this[$_ ay of vbik ,1994.
IlSh 7), b d blv, Notarypublic g l #'E W 4; g
Enclosures:
- 1. Basis for Proposed Change
- 2. 10 CFR 50.92 Evaluation
- 3. Instructions for Incorporation and Revised Pages c(w): Georgi.g Power Company Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle State of Georgia l Mr. J. D. Tanner, Commissioner, Dept. of Natural Resources kv-0282 7[0775
ENCLOSURE 1
. VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECHNICAL SPECIFICATIONS REINSTATEMENT OF EXCEPTION TO 3.0.4 FOR SPECIFICATION 3.2.4 BASIS FOR PROPOSED CHANGE 1
Proposed Change Add action statement "d" to specification 3.2.4 along with the following statement, " The provisions of specification 3.0.4 are not applicable."
A Ilasis The original issue of the Vogtle Electric Generating Plant Technical Specifications contained an exception to the provisions of specification 3.0.4 in the action requirements for specification 3.2.4. At that time, specification 3.0.4 simply prohibited entry into an operational mode when the limiting condition for operation (LCO) could not be met without reliance on the action requirements. Generic letter 87-09 proposed a change to specification 3.0.4 to allow entry into an operational mode, or other specified condition, when compliance with the LCO relies on an action statement if the action statement permits continued operation for an unlimited period of time. In 1992, GPC proposed to amend the VEGP Technical Specifications to incorporate the revised wording of 3
specification 3.0.4 as proposed by the Generic Letter. The new wording of specification 3.0.4 appeared to allow power to be raised above 50 percent when the quadrant power tilt ratio (QPTR) was greater than 1.02 because the action statement allowed continued operation for an unlimited period of time at reduced power. Therefore, the exception to specification 3.0.4 was removed with the implementation of the revised wording of the specification. The LCO for specification 3.2.4 is only applicable in mode 1 above 50 percent power. The action statement only allows operation above 50 percent power for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, after which time, it must be reduced to below 50 percent if the QPTR is not restored to within its limit. Since the action statement ultimately requires a change in plant i operating conditions that puts it outside the applicability requirements of the specification, the revised wording of specification 3.0.4 prohibits raising power above 50 percent and entering the action statement if the QPTR has been determined to be out oflimit prior to exceeding 50 percent power.
During startup, it is common for the QPTR to exceed 1.02 at low power levels. As power increases, the QPTR gradually lowers. This situation has resulted in a number
. El-1
- l. .
l I
I l -
\
ENCLOSURE 1 (CONTINUED)
VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECHNICAL SPECIFICATIONS j REINSTATEMENT OF EXCEPTION TO 3.0.4 FOR SPECIFICATION 3.2.4 BASIS FOR PROPOSED CHANGE of delays in power ascension as a result ofhaving to wait, at a power leveljust under 50 percent, for QPTR to lower below 1.02 before entering the operational conditions where the action requirements of specification 3.2.4 are applicable. By reinstating the exception to specification 3.0.4, power ascension can continue while the LCO is being met in '
accordance with the action statements. The higher power level and time limits allowed by the action statement are sufficient to assure that the QPTR will stabilize without resulting in a requirement to reduce power to a value outside the applicability of the specification.
The margin of safety inherently provided by the technical specification will not be affected since the limitations of the action statement will continue to be met.
f P
El-2 ,
l l
4 ENCLOSURE 2 J
VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECHNICAL SPECIFICATIONS REINSTATEMENT OF EXCEPTION TO 3.0.4 FOR SPECIFICATION 3.2.4 10 CFR 50.92 EVALUATION Pursuant to 10 CFR 50.92, Georgia Power Company (GPC) has evaluated the proposed revision to the Technical Specifications and has determined that operation of the facility in j accordance with the proposed amendment would not involve any significant hazards considerations. I
Background
Limiting condition for operation (LCO) 3.2.4 requires that power operation be reduced 3 percent for each I percent of quadrant power tilt ratio (QPTR) in excess of 1.00 when the QPTR is greater than 1.02. If the QPTR has not been returned to within its limit i within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the action statement allows continued operation only at power levels below 50 percent power. The 24-hour period allows time for correcting the QPTR by operator action or by stabilization as a result of additional burnup. Specification 3.0.4 l does not allow operation above 50 percent power when the plant is being started up unless i the QPTR is already within its limit. By including an exception to specification 3.0.4 in the Vogtle Electric Generating Plant (VEGP) Technical Specifications similar to the one j contained in the original specifications and those of plants of the same design, unnecessary delays in plant startup can be eliminated.
Analysis 4
The QPTR limit assures that the gross radial power distribution remains consistent with
. the design values used in the safety analyses. When the QPTR is greater than 1.02, the 4
power reduction of 3% for each percent of QPTR in excess of 1.00 is a conservative tradeoffof total core power with peak linear power, thus, assuring continued operation in l accordance with the safety analyses. The reinstatement of the exception to specification l 3.0.4 will not result in operation in conditions that are different than those already allowed by the specifications; therefore, the margin of safety provided by the technical specification will not be affected by this change.
L -
l i i
! l 4 ' '
l . ENCLOSURE 2 (CONTINUED) j- VOGTLE ELECTRIC GENERATING PLANT '
l i REQUEST TO REVISE TECHNICAL SPECIFICATIONS
. REINSTATEMENT OF EXCEPTION TO 3.0.4 FOR SPECIFICATION 3.2.4 l 10 CFR 50.92 EVALUATION l l
l l Conclusion j Based on the above considerations, GPC has concluded the following concerning 10 CFR 50.92. >
l
- 1. The proposed change to the Technical Specifications does not involve a significant increase in the probability or consequences of an accident previously evaluated
! because it does not allow operation in a condition that is not already allowed by the
]
l -Technical Specifications.
l
) 2. The proposed change to the Technical Specifications does not create the possibility of j a new or different kind of accident from any accident previously evaluated because it will not allow operation under conditions different from those already allowed by the l technical specifications.
j 3. The proposed addition to the Technical Specifications does not involve a significant reduction in the margin of safety because the action requirements will continue to be met in the same manner as currently required by the Technical Specifications.
Based upon the preceding information, it has been determined that the proposed Technical j Specifications addition does not involve a significant hazards consideration as defined by j 10 CFR 50.92.
1 1 4 1 h
(
4, J
i i
4 4
E2-2 I
i
_ m - , ..-,
1
- \
ENCLOSURE 3
. VOGTLE ELECTRIC GENERATING PLANT l REQUEST TO REVISE TECHNICAL SPECIFICATIONS
- REINSTATEMENT OF EXCEPTION TO 3.0.4 FOR SPECIFICATION 3.2.4
- INSTRUCTIONS FOR INCORPORATION I
- i 1
The proposed change to the Vogtle Electric Generating Plant Technical Specifications i i would be incorporated as follows.
Remove Page Insert Page 3/4 2-1l' and 3/4 2-12 3/4 2-11* and 3/4 2-12 l t !
i l 1 l 1
1 I a
Y 4
2 4
l 3
h 1
i
)
l
?
- Overleafpage contains no changes.