Proposed Tech Spec 3.2.4, Quadrant Power Tilt Ratio
ML20064C724
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/01/1994
From:
GEORGIA POWER CO.
To:
Shared Package
ML20064C722 List:
References
NUDOCS 9403100184
Download: ML20064C724 (1)


Text

.- _ . - . . . . . - - .- - - .. ---_ _ __ _ _ _ _ -_ _ - _ __ _ - - _ -

POWER DISTRIBUTION LIMITS LIMITING CONDITION FOR OPERATION ACTION (Continued)

2. Reduce THERMAL POWER to less than 50% of RATED THERMAL POWER within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and reduce the Power Range Neutron Flux-High Trip Setpoints to less than or equal to 55% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; and
3. Identify and correct the cause of the out-of-limit condition

. prior to increasing THERMAL POWER; subsequent POWER OPERATION above 50% of RATED THERMAL POWER may proceed provided that the QUADRANT POWER TILT RATIO is verified within its limit.at.least once per hour for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or until verified at 95% or greater ,

RATED THERMAL POWER 10'N QH ^*Y Of/l'C" g'*

4

(, Tkd povis/0n 1 of Tject l ea ton SURVEILLANCE REQUIREMENTS 4.2.4.1 The QUADRANT POWER TILT RATIO shall be determined to be within the limit above 50% of RATED THERMAL POWER by:

~

a. Calculating the ratio at least once per 7 days when the alarm is OPERABLE, and
b. Calculating the ratio at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during steady-state operation when the alarm is inoperable.

4.2.4.2 The QUADRANT POWER TILT RATIO shall be determined to be within the limit when above 75% of RATED THERMAL POWER with one Power Range channel inoperable by using the movable incore detectors to confirm that the normalized symmetric power distribution, obtained from two sets' of four symmetric thimble locations or full-core flux map, is consistent with the indicated QUADRANT POWER TILT RATIO at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

V0GTLE UNITS - 1 & 2 3/4 2-12 Amendment No.59 (Unit 1)

Amendment No. 38 (Unit 2)

P