Category:Letter
MONTHYEARRS-24-097, Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 12024-10-23023 October 2024 Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 1 ML24256A0422024-10-0404 October 2024 Updated Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24242A3032024-09-0909 September 2024 Letter - Three Mile Island Station, Unit 2, Issuance of Amendment No. 68, Historic and Cultural Resources IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 ML24240A2222024-08-27027 August 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24135A3292024-08-0909 August 2024 Amendment No 68, Historic and Cultural Resources Cover Letter IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24135A1972024-06-13013 June 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0091 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24120A3242024-05-24024 May 2024 TMI-2 Email to Fws RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24120A2552024-04-29029 April 2024 Annual Radiological Environmental Operating Report ML24113A0212024-04-18018 April 2024 (TMI-2), Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A0012024-03-28028 March 2024 (TMI-2), Decommissioning Trust Fund Annual Report ML24065A0042024-03-28028 March 2024 Submittal of 2023 Aircraft Movement Data Annual Report ML24088A0122024-03-28028 March 2024 Notification of Amended Post-Shutdown Decommissioning Activities Report (PSDAR) in Accordance with 10 CFR 50.82(a)(7), Revision 6 ML24085A2152024-03-25025 March 2024 (TMI-2) - Annual Notification of Property Insurance Coverage RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24052A0602024-03-20020 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0061 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24074A3922024-03-14014 March 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML24075A0062024-03-14014 March 2024 List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24044A0092024-02-12012 February 2024 License Amendment Request – Three Mile Island, Unit 2, Historic and Cultural Resources Review, Response to Request for Additional Information IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 ML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 SHPO Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23213A2342023-08-0101 August 2023 Submittal of Defueled Safety Analysis Report and Decommissioning Quality Assurance Plan ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA SHPO to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to SHPO Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance 2024-09-09
[Table view] Category:Technical Specifications
MONTHYEARML23033A1032023-01-27027 January 2023 Supplement to License Amendment Request - Proposed Changes to TMl-2 Possession Only License and Technical Specifications ML22087A3942022-03-28028 March 2022 Supplemental Information Supporting License Amendment Request - Proposed Revision to License Conditions and Permanently Defueled Technical Specifications for Permanent Removal of Irradiated Fuel from the Spent Fuel Pool (ISFSI-Only Technica ML21118A0572021-04-13013 April 2021 Submittal of Changes to Technical Specifications Bases ML20352A3812020-12-18018 December 2020 TMI-2 License Transfer Conforming Amendment ML20261H9252020-12-0202 December 2020 Issuance of Amendment No. 299 for Unit 1 Permanently Defueled Emergency Plan and Emergency Action Level Scheme Changes ML19065A1142019-04-18018 April 2019 Issuance of Amendment No. 296 for Unit 1 Changes to Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML19065A2172019-03-0606 March 2019 Supplement - License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML15225A1582015-10-0101 October 2015 Issuance of Amendment for Temporary Restoration of the Borated Water Storage Tank Cleanup and Recirculation Operation (TAC No. 6504) ML15090A5842015-07-28028 July 2015 Issuance of Amendments Technical Specifications to Modify Reactor Coolant System Pressure Isolation Check Valve Maximum Allowable Leakage Limits ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) TMI-15-072, Supplement to License Amendment Request - Modify Reactor Coolant System Pressure Isolation Check Valve Technical Specification Maximum Allowable Leakage Limts2015-06-10010 June 2015 Supplement to License Amendment Request - Modify Reactor Coolant System Pressure Isolation Check Valve Technical Specification Maximum Allowable Leakage Limts TMI-15-064, Supplement to the Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2015-05-0707 May 2015 Supplement to the Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process TMI-13-033, Technical Specification Change Request 352, Revise Technical Specification 3.14.2 and the Licensing Basis Flood Hazard Contained in the Updated Final Safety Analysis Report2013-04-10010 April 2013 Technical Specification Change Request 352, Revise Technical Specification 3.14.2 and the Licensing Basis Flood Hazard Contained in the Updated Final Safety Analysis Report TMI-12-169, Request for Amendment to Eliminate Certain Technical Specification Reporting Requirements2013-02-0404 February 2013 Request for Amendment to Eliminate Certain Technical Specification Reporting Requirements TMI-12-064, Supplemental Response to Request for Additional Information Related to the Proposed Administrative Changes to the Technical Specifications2012-04-11011 April 2012 Supplemental Response to Request for Additional Information Related to the Proposed Administrative Changes to the Technical Specifications TMI-11-171, Response to Request for Additional Information Related to the Proposed Administrative Changes to the Technical Specifications2012-01-20020 January 2012 Response to Request for Additional Information Related to the Proposed Administrative Changes to the Technical Specifications TMI-11-103, License Amendment Request to Revise Technical Specifications to Incorporate Administrative Changes2011-10-18018 October 2011 License Amendment Request to Revise Technical Specifications to Incorporate Administrative Changes TMI-10-035, Technical Specification Change Request No. 351: Maximum Allowable Power with Inoperable Main Steam Safety Valves2010-09-24024 September 2010 Technical Specification Change Request No. 351: Maximum Allowable Power with Inoperable Main Steam Safety Valves ML1003204932010-03-11011 March 2010 License Amendment Technical Specification Changes Adopting TSTF-490-A, Revision 0, Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification ML0927104632009-10-22022 October 2009 Renewed Facility Operating License ML0927104012009-10-22022 October 2009 Issuance of Renewed Facility Operating License No. DPR-50 for Three Mile Island, Unit 1 TMI-09-082, Response to Request for Additional Information Related to License Amendment Request No. 326 to Adopt TSTF-490-A, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical....2009-07-0202 July 2009 Response to Request for Additional Information Related to License Amendment Request No. 326 to Adopt TSTF-490-A, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical.... ML0831201222008-11-0606 November 2008 License Amendment Request No. 326 to Adopt TSTF-490-A, Revision 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification Using the Consolidated Line Item Improvement.. ML0828001742008-09-29029 September 2008 Technical Specification Change Request No. 342 Control Rod Drive Control System Upgrade and Elimination of the Axial Power Shaping Rods ML0827402962008-09-15015 September 2008 Supplement: Technical Specification Change Request for Technical Specification Change Request (Tscr) No. 86 Deletion of Technical Specification Sections 6.5, Review and Audit ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0821301362008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Tech Spec Pages for Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators RA-08-024, Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.2008-04-21021 April 2008 Amergen, Energy LLC, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. ML0809101272008-04-16016 April 2008 Technical Specifications to Amendment ML0807700842008-03-14014 March 2008 Additional Information for Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 RS-08-012, Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications2008-02-28028 February 2008 Amergen Company, Request for Amendment to Administrative Controls Section of Technical Specifications ML0727100352007-09-27027 September 2007 Tech Spec Pages for Amendment 261 Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process and Generic Letter 2006-01 ML0726904252007-09-26026 September 2007 Tech Spec Pages for Amendment 260 Regarding Relocation of Technical Specification Requirements for Refueling and Spent Fuel Pool Area Radiation Monitors ML0725402542007-09-0404 September 2007 Additional Information - Technical Specification Change Request No. 331: Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity RS-07-078, Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators2007-07-19019 July 2007 Amergen - License Amendment Request to Change Technical Specification Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML0718003192007-06-29029 June 2007 Tech Spec Pages for Amendment 259, One-Time Type a Test Interval Extension ML0715606022007-06-0505 June 2007 Response to Request for Additional Information Concerning Technical Specifications Change Request No. 334 - One-Time Type a Test Interval Extension ML0715202332007-05-31031 May 2007 Response to Request for Additional Information - Technical Specification Change Request No. 331 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0715202292007-05-31031 May 2007 Additional Information - Technical Specification Change Request No. 333, Relocation of Technical Specification Requirements for Refuel and Spent Fuel Pool Area Radiation Monitors. ML0712302682007-04-27027 April 2007 Submittal of Changes to Technical Specification Bases ML0708609682007-03-22022 March 2007 Technical Specification Change Request No. 335, Incorporating Revised Limit or the Variable Low Reactor Coolant System Pressure-Temperature Core Protection Safety Limit ML0628303312006-10-0606 October 2006 Response to Request for Additional Information, Technical Specification Change Request No. 331: Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0626800402006-09-15015 September 2006 Technical Specifications Change Request No. 334 - One-Time Type a Test Interval Extension ML0614202942006-05-15015 May 2006 Technical Specification Change Request No. 331 - Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0610100612006-04-0808 April 2006 Technical Specification Page Allowed Outage Time Extension from 7 Days to 10 Days for Emergency Diesel Generator EG-Y-1A ML0528702192005-10-13013 October 2005 Issuance of Amendment Elimination of Containment Equipment Hatch Closure Requirement During Refueling, Technical Specifications ML0522703622005-08-12012 August 2005 Tech Spec Pages for Amendment 256 Missed Surveillance Criteria Requirements and Addition of a Technical Specifications Bases Control Program ML0522304032005-08-10010 August 2005 Technical Specification Pages Extension of Reactor Trip System and Reactor Trip Device Functional Test Intervals ML0517506582005-06-17017 June 2005 Tech Spec Pages for Amendment - Monthly Operating Reports and Annual Occupational Radiation Reports 2023-01-27
[Table view] |
Text
AmerGen Energy Company, LLC www.exeloncorp.com AmerGen.
An Exelon/British Energy Company 200 Exelon Way Suite 34S Kennett Square, PA 19348 10 CFR 50.90 5928-02-20009 January 24, 2002 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
LICENSE AMENDMENT REQUEST (LAR) NO. 292, TRANSMITTAL OF CAMERA-READY TECHNICAL SPECIFICATION PAGES THREE MILE ISLAND, UNIT 1 (TMI UNIT 1)
OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289 This letter transmits the camera-ready Technical Specification pages to support NRC issuance of an amendment approving TMI Unit 1 License Amendment Request No. 292, which was submitted to the NRC on September 20, 2000.
If you have any questions or require additional information, please do not hesitate to contact us.
I declare under penalty of perjury that the foregoing is true and correct. Executed on January 24, 2002.
Very truly yours, Michael P. Gallagher Director - Licensing and Regulatory Affairs Mid-Atlantic Regional Operating Group
Enclosure:
TMI Unit 1 Technical Specification Revised Pages for License Amendment Request No. 292 cc: H. J. Miller, USNRC Regional Administrator, Region I J. D. Orr, USNRC TMI Unit 1 Resident Inspector T. G. Colburn, USNRC TMI Unit 1 Senior Project Manager File No. 00075 Soo1
ENCLOSURE TMI Unit 1 Technical Specification Revised Pages for License Amendment Request No. 292 (Pages 3-40b, 3-40d, 3-41, 3-41 c, 4-1 Oa, 4-1 Ob, 4-38, and 4-55c)
The Emergency Feedwater System is provided with two channels of flow instrumentation on each of the two discharge lines. Local flow indication is also available for the emergency feedwater system.
Although the pressurizer has multiple level indications, the separate indications are selectable via a switch for display on a single display. Pressurizer level, however, can also be determined via the patch panel and the computer log. In addition, a second channel of pressurizer level indication is available independent of the NNI.
Although the instruments identified in Table 3.5-2 are significant in diagnosing situations which could lead to inadequate core cooling, loss of any one of the instruments in Table 3.5-2 would not prevent continued, safe, reactor operation. Therefore, operation is justified for up to 7 days (48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for pressurizer level). Alternate indications are available for Saturation Margin Monitors using hand calculations, the PORV/Safety Valve position monitors using discharge line thermocouple and Reactor Coolant Drain Tank indications, and for EFW flow using Steam Generator level and EFW pump discharge pressure. Pressurizer level has two channels, one channel from NNI (3 D/P instrument strings through a single indicator) and one channel independent of the NNI. Operation with the above pressurizer level channels out of service is permitted for up to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />. Alternate indication would be available through the plant computer.
The operability of design basis accident monitoring instrumentation as identified in Table 3.5-3, ensures that sufficient information is available on selected plant parameters to monitor and assess the variables following an accident. (This capability is consistent with the recommendations of Regulatory Guide 1.97, "Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant Conditions During and Following an Accident," Rev. 3, May 1983.) These instruments will be maintained for that purpose.
3-40b Amendment No. 78, 1-00, 4-44, 1-6 TABLE 3.5-3 POST ACCIDENT MONITORING INSTRUMENTATION REQUIRED NUMBER MINIMUM NUMBER FUNCTION INSTRUMENTS OF CHANNELS OF CHANNELS ACTION 3
(D 1. High Range Noble Gas Effluent
- a. Condenser Vacuum Pump Exhaust (RM-A5-Hi) 1 1 A
-9.
- b. Condenser Vacuum Pump Exhaust (RM-G25) 1 1 A CD
- c. Auxiliary and Fuel Handling 1 1 A z Building Exhaust (RM-A8-Hi) 0
- d. Reactor Building Purge Exhaust (RM-A9-Hi) 1 1 A
- e. Reactor Building Purge Exhaust (RM-G24) 1 1 A
- f. Main Steam Lines Radiation 1 1 A (RM-G26/RM-G27) each OTSG each OTSG
- 2. Containment High Range Radiation 2 2 A (RM-G22/G-23)
- 3. Containment Pressure 2 1 B
- 4. Containment Water Level
- a. Containment Flood (LT-806/807) 2 1 B 0
0.. b. Containment Sump (LT-804/805) 1 0 C
- 5. DELETED I
- 6. Wide Range Neutron Flux 2 1 A
- 7. Reactor Coolant System Cold Leg Water 2 1 A Temperature (TE-959, 961; TI-959A, 961A)
- 8. Reactor Coolant System Hot Leg Water 2 1 A Temperature (TE-958, 960; TI-958A, 960A)
- 9. Reactor Coolant System Pressure 2 1 A (PT-949, 963; PI-949A, 963)
- 10. Steam Generator Pressure (PT-950, 951, 1180, 2/OTSG 1/OTSG A 1184; PI-950A, 951A, 1180, 1184)
- 11. Condensate Storage Tank Water Level (LT-1 060, 2/Tank 1/Tank A 1061, 1062, 1063; LI-1 060, 1061, 1062, 1063)
3.6 REACTOR BUILDING Applicabilit Applies to the containment integrity of the reactor building as specified below.
Obiective To assure containment integrity.
Specification 3.6.1 Except as provided in 3.6.6, 3.6.8, and 3.6.12, CONTAINMENT INTEGRITY (Section 1.7) shall be maintained whenever all three of the following conditions exist:
- a. Reactor coolant pressure is 300 psig or greater.
- b. Reactor coolant temperature is 200OF or greater.
- c. Nuclear fuel is in the core.
3.6.2 Containment integrity shall be maintained when both the reactor coolant system is open to the containment atmosphere and a shutdown margin exists that is less than that for a refueling shutdown.
3.6.3 Positive reactivity insertions which would result in a reduction in shutdown margin to less than 1 % Ak/k shall not be made by control rod motion or boron dilution unless containment integrity is being maintained.
3.6.4 The reactor shall not be critical when the reactor building internal pressure exceeds 2.0 psig or 1.0 psi vacuum.
3.6.5 Prior to criticality following refueling shutdown, a check shall be made to confirm that all manual containment isolation valves which should be closed are closed and are conspicuously marked.
3.6.6 While the reactor is critical, if a reactor building isolation valve (other than a purge valve) is determined to be inoperable in a position other than the required position, the other reactor building isolation valve in the line shall be verified to be OPERABLE. If the inoperable valve is not restored within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, the OPERABLE valve will be closed or the reactor shall be brought to HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and to the COLD SHUTDOWN condition within additional 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
3.6.7 DELETED 3-41 Amendment No. 87, 1-92, 1-8, 90, 1-98
3.6 REACTOR BUILDING (Continued)
Bases The Reactor Coolant System conditions of COLD SHUTDOWN assure that no steam will be formed and hence no pressure will build up in the containment if the Reactor Coolant System ruptures. The selected shutdown conditions are based on the type of activities that are being carried out and will preclude criticality in any occurrence.
A condition requiring integrity of containment exists whenever the Reactor Coolant System is open to the atmosphere and there is insufficient soluble poison in the reactor coolant to maintain the core one percent subcritical in the event all control rods are withdrawn. The Reactor Building is designed for an internal pressure of 55 psig, and an external pressure 2.5 psi greater than the internal pressure.
An analysis of the impact of purging on ECCS performance and an evaluation of the radiological consequences of a design basis accident while purging have been completed and accepted by the NRC staff. Analysis has demonstrated that a purge isolation valve is capable of closing against the dynamic forces associated with a LOCA when the valve is limited to a nominal 300 open position.
Allowing purge operations during STARTUP, HOT STANDBY and POWER OPERATION (T.S. 3.6.10) is more beneficial than requiring a cooldown to COLD SHUTDOWN from the standpoint of (a) avoiding unnecessary thermal stress cycles on the reactor coolant system and its components and (b) reducing the potential for causing unnecessary challenges to the reactor trip and safeguards systems.
The hydrogen mixing is provided by the reactor building ventilation system to ensure adequate mixing of the containment atmosphere following a LOCA. This mixing action will prevent localized accumulations of hydrogen from exceeding the flammable limit.
3-41c Amendment No. 87, -08, 406,4 -1&, 29 I i TABLE 4.1-4 3
POST ACCIDENT MONITORING INSTRUMENTATION
- 3 CD FUNCTION INSTRUMENTS CHECK TEST CALIBRATE REMARKS z 1. Noble Gas Effluent 0
- a. Condenser Vacuum Pump Exhaust (RM-A5-Hi) W M F (1) Using the installed check source when background is less than twice the expected increase in cpm which would result from the check source alone.
Background readings greater than this value are sufficient in themselves to show that this monitor is functioning.
- b. Condenser Vacuum Pump W(1) M F Exhaust (RM-G25)
- c. Auxiliary and Fuel Handling W M F Building Exhaust (RM-A8-Hi) 0
- d. Reactor Building Purge W M F Exhaust (RM-A9-Hi)
- e. Reactor Building Purge W(1) M F Exhaust (RM-G24)
- f. Main Steam Lines W(1) M F Radiation (RM-G26/RM-G27)
Containment High Range W M
- 2. R Radiation (RM-G22/G23)
- 3. Containment Pressure W N/A F
- 4. Containment Water Level W N/A R
- 5. DELETED
- 6. Wide Range Neutron Flux W N/A F
TABLE 4.1-4 (Continued)
POST ACCIDENT MONITORING INSTRUMENTATION FUNCTION INSTRUMENTS CHECK TEST CALIBRATE REMARKS CD 7. Reactor Coolant System Cold Leg W N/A R Water Temperature (TE-959, 961; TI-959A, 961A) z 0 8. Reactor Coolant System Hot Leg W N/A R (TE-958, 960; TI-958A, 960A)
- 9. Reactor Coolant System Pressure W N/A R (PT-949, 963; PI-949A, 963)
- 10. Steam Generator Pressure W N/A R (PT-950, 951, 1180, 1184; PI-950A, 951A, 1180, 1184)
C 11. Condensate Storage Tank Water W N/A F Level (LT-1060, 1061, 1062, 1063; LI-1060, 1061, 1062, 1063)
(Page 4-38 deleted)
(Page 4-38a deleted)
Amendment No. 87, 4148, 1--5, 4-98,225
Bases Pressure drop across the combined HEPA filters and charcoal adsorbers of less than 6 inches of water at the system design flow rate will indicate that the filters and adsorbers are not clogged by excessive amounts of foreign matter. Pressure drop should be determined at least once every refueling interval to show system performance capability.
The frequency of tests and sample analysis are necessary to show that the HEPA filters and charcoal adsorbers can perform as evaluated. Tests of the charcoal adsorbers with Halogenated hydrocarbon refrigerant shall be performed in accordance with approved test procedures. The charcoal adsorber efficiency test procedures should allow for the removal of one adsorber tray, emptying of one bed from the tray, mixing the adsorbent thoroughly and obtaining at least two samples. Each sample should be at least two inches in diameter and a length equal to the thickness of the bed. If test results are unacceptable all adsorbent in the system should be replaced with an adsorbent qualified according to ASTM D3803-1989. Tests of the HEPA filters with DOP aerosol shall also be performed in accordance with approved test procedures. Any HEPA filters found defective should be replaced with filters qualified according to Regulatory Guide 1.52, March 1978.
Fans AH-E7A & B performance verification is necessary to ensure adequate flow to perform the filter surveillance of T.S. 4.12.2.1 and 4.12.2.3 and can only be demonstrated by running both fans simultaneously. This can only be accomplished when purge valves are note limited to 300 open (i.e., cold shutdown).
The reactor building purge exhaust system no longer is relied upon to serve an operating accident mitigating (i.e. LOCA) function. The retest requirement of T.S. 4.12.2.2a has therefore been changed to reflect the same retest requirements as the auxiliary and fuel handling building ventilation system which similarly serves no operating accident mitigating function.
If significant painting, steam, fire, or chemical release occurs such that the HEPA filter or charcoal adsorber could become contaminated from the fumes, chemicals or foreign material, the same tests and sample analysis shall be performed as required for operational use. The determination of significant shall be made by the Vice President-TMI Unit 1.
References (1) UFSAR, Section 5.6 - "Ventilation and Purge Systems" 4-55c Amendment No. 5, 08, 47, 4-79, 24-8, 2-26