Similar Documents at Ginna |
---|
Category:Fuel Cycle Reload Report
MONTHYEARML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML22264A0842022-09-20020 September 2022 R. E. Ginna Nuclear Power Plant - Clarification Letter to the Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22160A4162022-06-0909 June 2022 R. E. Ginna Nuclear Power Plant, Core Operating Limits Report Cycle 43, Revision 1 ML21287A0122021-10-13013 October 2021 Core Operating Limits Report Cycle 43, Revision ML20134H8402020-05-12012 May 2020 Core Operating Limits Report Cycle 42, Revision 0 ML18331A1652018-11-21021 November 2018 R. E. Ginna Nuclear Power Plant Core Operating Limits Report(Colr) Cycle 41 ML18142A2312018-05-16016 May 2018 Core Operating Limits Report Cycle 40, Revision 2 ML17276A3482017-09-26026 September 2017 Generator Tube Inspection Report ML17142A3062017-05-0909 May 2017 Submittal of Core Operating Limits Report Cycle 40, Revision 1 ML15308A1022015-10-29029 October 2015 Cycle 39 Core Operating Limits Report, Revision 0 ML14141A0322014-05-13013 May 2014 Transmittal of Core Operating Limits Report (COLR) for Cycle 38 ML12314A3752012-11-0808 November 2012 R. E. Ginna Nuclear Power Plant, Transmittal of Core Operating Limits Report (COLR) ML11325A1182011-11-15015 November 2011 2011 Steam Generator Tube Inspection Report ML11143A0142011-05-17017 May 2011 Transmittal of Core Operating Limits Report (COLR) ML0926800612009-09-18018 September 2009 R. E. Ginna - Transmittal of Core Operating Limits Report (COLR) ML0828102572008-09-30030 September 2008 R. E. Ginna Nuclear Power Plant Transmittal of Core Operating Limits Report (COLR) ML0819801222008-07-10010 July 2008 R. E. Ginna Nuclear Power Plant - Transmittal of Core Operating Limits Report (COLR) Cycle 34, Revision 1 ML0812905122008-05-0404 May 2008 R. E. Ginna - Transmittal of Core Operating Limits Report (Colr), Cycle 34, Revision 0 ML0631802262006-11-0303 November 2006 Transmittal of Core Operating Limits Report ML0527702432005-09-26026 September 2005 Transmittal of Core Operating Limits Report (COLR) ML0403305712004-01-23023 January 2004 Transmittal of Core Operating Limits Report (COLR) for R.E. Ginna Nuclear Power Plant ML0328203402003-10-0606 October 2003 Transmittal of Core Operating Limits Report, Cycle 31, Revision 0 ML0209900512002-04-0303 April 2002 Core Operating Limits Report (Colr), Revision 0, Cycle 30 ML18143A4471978-08-0707 August 1978 Transmittal of Non-Proprietary Revised Version of Additional Information Re Cycle 8 Fuel Reload 2023-05-01
[Table view] Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] |
Text
R if /iDZ A Subsidiary of RGS Energy Group, Inc.
ROCHESTER GAS AND ELECTRIC CORPORATION ° 89 EAST AVENUE, ROCHESTER, N.Y 14649-0001
- 716 546-2700 www.rge.com ROBERT C. MECREDY April 3, 2002 Vice President Nuclear Operations U.S. Nuclear Regulatory Commission Document Control Desk Attn: Robert Clark Project Directorate I Washington, D.C. 20555
Subject:
Transmittal of Core Operating Limits Report (COLR)
Rochester Gas & Electric Corporation R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref(a): Technical Specification 5.6.5
Dear Mr. Clark:
Ginna Station Technical Specification 5.6.5 requires that RG&E provide the NRC with any revisions of the COLR. As such, attached please find a copy of Revision 0 of this document for Cycle 30.
Future revisions to this document will be forwarded to the NRC in accordance with the applicable technical specification.
Very tryly yours, Robert C. M red c$?
Attachment xc: Mr. Robert Clark (Mail Stop O-8-C2)
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector
/I03qL$?
COLR Cycle 30 f k 6,0 R.E. Ginna Nuclear Power Plant Core Operating Limits Report COLR Cycle 30 Revision 0 Responsible Manager:
Mark Flaherty Effective Date: 04 2002 04-03-2002 Controlled Copy No.
Record Cat.# 4.43.2 -14 R.E. Ginna Nuclear Power Plant COL-R-1 Revision 0
COLR Cycle 30 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for the R.E. Ginna Nuclear Power Plant has been prepared in accordance with the requirements of Technical Specification 5.6.5.
The Technical Specifications affected by this report are listed below:
3.1.1 SHUTDOWN MARGIN (SDM) 3.1.3 MODERATOR TEMPERATURE COEFFICIENT (MTC) 3.1.5 Shutdown Bank Insertion Limit 3.1.6 Control Bank Insertion Limits 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))
3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FNAH) 3.2.3 AXIAL FLUX DIFFERENCE (AFD) 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB)
Limits 3.9.1 Boron Concentration R.E. Ginna Nuclear Power Plant COLR-2 Revision 0
COLR Cycle 30 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 5.6.5. All items that appear in capitalized type are defined in Technical Specification 1.1, Definitions.
2.1 SHUTDOWN MARGIN 1 (LCO 3.1.1) 2.1.1 The SHUTDOWN MARGIN in MODE 2 with Keff < 1.0 and MODES 3 and 4 shall be greater than or equal to the limits specified in Figure COLR - 1 for the number of reactor coolant pumps in operation (non main feedwater operation).
2.1.2 The SHUTDOWN MARGIN in MODE 4 when both reactor coolant pumps are not OPERABLE and in operation and in MODE 5 shall be greater than or equal to the one loop operation curve of Figure COLR - 1.
2.1.3 The SHUTDOWN MARGIN required in LCO 3.1.4, LCO 3.1.5, LCO 3.1.6, LCO 3.1.8, and LCO 3.4.5 shall be greater than the limits specified in Figure COLR 1 for the number of reactor coolant pumps in operation and the status of the main feedwater system.
2.2 MODERATOR TEMPERATURE COEFFICIENT 1 (LCO 3.1.3) 2.2.1 The Moderator Temperature Coefficient (MTC) limits are:
The BOL ARO/HZP - MTC shall be less positive than +5.0 pcm/°F for power levels below 70% RTP and less than or equal to 0 pcm/°F for power levels at or above 70% RTP.
The EOL ARO/RTP - MTC shall be less negative than -42.9 pcm/°F.
where:
ARO stands for All Rods Out BOL stands for Beginning of Cycle Life EOL stands for End of Cycle Life HZP stands for Hot Zero Power RTP stands for RATED THERMAL POWER R.E. Ginna Nuclear Power Plant COLR-3 Revision 0
COLR Cycle 30 2.3 Shutdown Bank Insertion Limit 1 (LCO 3.1.5) 2.3.1 The shutdown bank shall be fully withdrawn which is defined as > 221 steps.
1 2.4 Control Bank Insertion Limits (LCO 3.1.6) 2.4.1 The control banks shall be limited in physical insertion as shown in Figure COLR - 2.
2.4.2 The control banks shall be moved sequentially with a 100 (+/- 5) step overlap between successive banks.
2 2.5 Heat Flux Hot Channel Factor (FQ(Z))
(LCO 3.2.1) 2.5.1 FQ(Z) < ((Fa) *K(Z) / P) when P > 0.5 FQ(Z) < ((FQ) *K(Z) / 0.5) when P < 0.5 where:
Z is the height in the core, FQ = 2.45, K(Z) is provided in Figure COLR - 3, and P = THERMAL POWER / RATED THERMAL POWER 2.6 Nuclear Enthalpy Rise Hot Channel Factor (FNAH)d (LCO 3.2.2) 2.6.1 FNAH -< FRTPAH * (1 + PFAH * (1-P))
where:
FRTPAH= 1.75, PFAH = 0.3, and P = THERMAL POWER / RATED THERMAL POWER R.E. Ginna Nuclear Power Plant COLR-4 Revision 0
COLR Cycle 30 3
2.7 AXIAL FLUX DIFFERENCE (LCO 3.2.3) 2.7.1 The AXIAL FLUX DIFFERENCE (AFD) target band is +/- 5%. The actual target bands are provided by Procedure RE-11.1.
2.7.2 The AFD acceptable operation limits are provided in Figure COLR - 4.
2.8 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) 4 Limits (LCO 3.4.1) 2.8.1 The pressurizer pressure shall be Ž_2205 psig.
2.8.2 The RCS average temperature shall be _<577.5 OF.
2.8.3 The RCS total flow rate shall be _ 177,300 gpm (includes 4% minimum flow uncertainty per Revised Thermal Design Methodology).
1 2.9 Boron Concentration (LCO 3.9.1) 2.9.1 The boron concentrations of the hydraulically coupled Reactor Coolant System, the refueling canal, and the refueling cavity shall be > 2300 ppm.
3.0 REFERENCES
- 1. WCAP-9272-P-A, Westinghouse Reload Safety Evaluation Methodology, July 1985.
- 2. WCAP-1 0054-P-A and WCAP-1 0081 -A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.
- 3. WCAP-1 0924-P-A, Volume 1, Revision 1, "Westinghouse Large-Break LOCA Best Estimate Methodology, Volume 1: Model Description and Validation Responses to NRC Questions," and Addenda 1,2,3, December 1988.
- 4. WCAP-1 0924-P-A, Volume 2, Revision 2, "Westinghouse Large-Break LOCA Best Estimate Methodology, Volume 2: Application to Two-Loop PWRs Equipped with Upper Plenum Injection," and Addendum 1, December 1988.
R.E. Ginna Nuclear Power Plant COLR-5 Revision 0
COLR Cycle 30
- 5. WCAP-1 0924-P-A, Volume 1, Revision 1, Addendum 4, "Westinghouse Large-Break LOCA Best-Estimate Methodology, Volume 1: Model Description and Validation, Addendum 4: Model Revisions," March 1991.
- 6. WCAP-1 3677-P-A, "10 CFR 50.46 Evaluation Model Report: WCOBRAiTRAC Two Loop Upper Plenum Injection Model Updates to Support ZIRLOTM Cladding Option,"
February 1994.
- 7. WCAP-1 261 0-P-A, "VANTAGE + Fuel Assembly Reference Core Report," April 1995.
- 8. WCAP-8385, "Power Distribution Control and Load Following Procedures - Topical Report,", September 1974.
- 9. WCAP-11397-P-A, "Revised Thermal Design Procedure", April 1989.
R.E. Ginna Nuclear Power Plant COLR-6 Revision 0
COLR Cycle 30 IACCEPTABLI S2.5 OPERATION (0.2.45)
I - . -"- (0.2.40) u *- "(0,1.8o)
M 31 (1500,1.00 2i 0
0 1500 1000 500 0 COOLANT BORON CONCENTRATION (ppm)
One Loop Operation - wo Loop Operation-non MFW - -- Two Loop Operatwn MFW NOTE:
Two Loop Operatbon - non MFW means that the main feevtar system is not supplying the steam generators.
Two Loop Opelvion - MFW means Mtat the main feeowater system is supplying the steam gemrators.
Figure COLR - 1 REQUIRED SHUTDOWN MARGIN R.E. Ginna Nuclear Power Plant COLR-7 Revision 0
COLR Cycle 30 e-1--00
. I S( 100, 184)
S160 0-140 "120 DBank
.2 100
(,9I_8o / /_______
o 80 v 60
- 53) S~~(0, ,
a340/
(30,0 0
0 10 20 30 40 50 60 70 80 90 100 Core Power (Percent of 1520 MWT)
"*Thefully withdrawn position is defined as _ 221 steps.
Figure COLR - 2 CONTROL BANK INSERTION LIMITS R.E. Ginna Nuclear Power Plant COLR-8 Revision 0
COLR Cycle 30 1.2 N
00m%
1.0 0.
L. 0.8 o0.6 Total F. 2.450
'x Elevalion (ft) K(Z)
< 0.4 0.0 1.0 "V 11.783 1.0 N
E 0.2 z0 0.0 I 0.0 2.0 4.0 6.0 8&0 10.0 11.783 Elevation (ft)
Figure COLR - 3 K(Z) - NORMALIZED FQ(Z) AS A FUNCTION OF CORE HEIGHT R.E. Ginna Nuclear Power Plant COLR-9 Revision 0
COLR Cycle 30 100 I I DO NOT OPERATE IN THIS AREA WITH AFD OUTSIDE THE TARGET BAND
(-11,90) 1190) 80 ACCEPTABLE OPEATION
............... ..... .................... OUTSMDE W/ITH AFD THE ................... ...............
00% TARGET BAND VwITH <11 HR PENALTY 60 DEVIATION 0~ TNHE
(.31,5o) (31,50)
LL W
l- 40 LU ACCEPTABLE W- OPERATION 20 0
-30 -20 -10 0 10 20 30 AXIAL FLUX DIFFERENCE (%)
Figure COLR - 4 AXIAL FLUX DIFFERENCE ACCEPTABLE OPERATION LIMITS AS A FUNCTION OF RATED THERMAL POWER R.E. Ginna Nuclear Power Plant COLR-1 0 Revision 0
COLR Cycle 30 END NOTES
- 1. (Limits generated using Reference 1)
- 2. (Limits generated using References 1 through 7)
- 3. (Limits generated using References 1 and 8)
- 4. (Limits generated using Reference 9)
R.E. Ginna Nuclear Power Plant COL-R-1 1 Revision 0