MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22319A0942022-11-10010 November 2022 EN 56219 - Flowserve. 10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation 105 IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 ML22297A2642022-10-25025 October 2022 Project Manager Assignment ML22276A2492022-10-25025 October 2022 Completion of License Renewal Commitment No. 10, Aging Management of Environmentally Assisted Fatigue ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22303A0042022-08-31031 August 2022 Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 ML22195A2432022-07-19019 July 2022 Request for Withholding Information from Public Disclosure Regarding Reactor Vessel Closure Head Repair Alternative ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22222A0092022-07-0101 July 2022 EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV Actuator ML22175A0342022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000413/2022403 and 05000414/2022403 ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3572022-05-16016 May 2022 Letter Issuing Exemption to Catawba IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 2024-02-02
[Table view] |
Text
SDuke GARY R.PETERSON Power Vice President Catawba Nuclear Station A Duke Energy Company Duke Power CNOZ VP / 4800 Concord Rd York, SC 29745 803 831 4251 803 831 3221 fax grpeters@duke-energy.com August 8, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Duke Energy Corporation Catawba Nuclear Station, Units 1 and 2 Docket Numbers 50-413 and 50-414 Severe Accident Mitigation Alternatives
REFERENCE:
- 1) Letter, USNRC to Duke Energy Corporation Dated May 14, 2002,
SUBJECT:
Request for Comments on the Draft Plant-Specific Supplement 9 to the Generic Draft Environmental Impact Statement Regarding Catawba Nuclear Station, Units 1 and 2.
Gentlemen:
Section 5.2.7 of Reference 1 identifies two Severe Accident Mitigation Alternatives (SAMAs): one to provide back-up power to the hydrogen igniters for Station Blackout (SBO) events and the other to install flood protection around the 6900/4160 volt transformers. The NRC staff states that since these SAMAs do not relate to adequately managing the effects of aging during the period of extended operation, they need not be implemented as part of license renewal pursuant to 10 CFR Part 54. The staff intends to pursue these two SAMAs as current operating license issues. Catawba has reviewed these two SAMAs and concurs with the NRC that these two SAMAs are not within the scope of license renewal and should be addressed separate from any license renewal proceedings. This letter provides the Catawba Nuclear Station position on these two SAMAs.
For the first SAMA, concerning the installation of back-up power to the hydrogen ignition system during a SBO event, Catawba agrees with the NRC staff that depending on the design requirements there may be a cost-beneficial modification that provides sufficient alternative power during a SBO to the hydrogen ignition system. The NRC staff has determined that this issue is sufficiently important for PWRs with ice-condenser containment and BWR Mark III containments that the NRC has made the issue a Generic Safety Issue (GSI), GSI-189 Susceptibility of Ice-Condenser and Mark III Containments to Early Failure from Hydrogen Combustion During a Severe Accident. As part of the resolution of GSI-189, the NRC is evaluating potential www duke-energy com A-c)D
U.S. Nuclear Regulatory Commission Page 2 August 8, 2002 improvements to hydrogen control provisions in ice-condenser plants to reduce their vulnerability to hydrogen-related containment failures during a SBO. This will include an assessment of the costs and benefits of various options. Catawba will evaluate various possible plant design and procedural changes to address this issue. However, since this issue is being pursued by the NRC as a generic issue for ice-condenser and BWR Mark III containments, Catawba will monitor the NRC resolution of GSI-189 as a current operating license issue.
For the second SAMA, concerning the installation of flood protection around the 6900/4160 volt transformers, Catawba also agrees with the NRC staff conclusion in Reference 1. Catawba is currently in the process of designing and scheduling the installation of flood protection for the 6900/4160 volt transformers for Units 1 and 2. The current schedule is to have this modification completed by March 31, 2005. Catawba will keep the NRC Staff informed on the progress of this modification and any changes to the schedule. This is the only regulatory commitment contained in this letter.
Duke Energy and Catawba have been actively involved since before 1988 in the development of plant-specific probabilistic risk assessments (PRA), individual plant examinations (IPE/IPEEE), and component/system reliability studies to evaluate severe accidents at Catawba. Risk insights from various Catawba risk assessments have been identified and implemented to improve both the design and operation of the plant.
These changes to the plant have been prioritized based on risk significance and implemented accordingly. The implementation of such improvements has reduced the risk associated with major contributors identified by the Catawba PRA and has enhanced overall plant safety.
Consideration of the two issues identified in Reference 1 continues the activities previously taken by Duke Energy to use risk insights to continuously improve the safety of Catawba Nuclear Station.
If you have any questions regarding this submittal, please contact Randall D. Hart at 803-831-3622.
Sincerely, Peterson RDH/s
U.S. Nuclear Regulatory Commission Page 3 August 8, 2002 xc:
L.A. Reyes U.S. Nuclear Regulatory Commission Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 D.J. Roberts Senior Resident Inspector (CNS)
U.S. Nuclear Regulatory Commission Catawba Nuclear Station C.P. Patel (Addressee Only)
NRC Senior Project Manager (CNS)
U.S. Nuclear Regulatory Commission Mail Stop 08-H12 Washington, D.C. 20555-0001 R.L. Franovich Senior Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 12-G15 Washington, D.C. 20555-0001 J.H. Wilson Senior Project Manager Office of Nuclear Reactor Regulation Mail Stop 12-D3 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Anne Cottingham, Esquire Winston and Strawn 1400 L Street, NW Washington, DC 20005