Letter Sequence Other |
---|
|
|
MONTHYEARML0327904422003-10-0303 October 2003 Tech Spec Pages for Amendment 92, Changes to Technical Specifications Associated with Secondary Coolant Specific Activity Project stage: Other ML0322500182003-10-0303 October 2003 License Amendment, Changes to Technical Specifications Associated with Secondary Coolant Specific Activity Project stage: Other 2003-10-03
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-038, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-037, To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 To Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) 2024-09-25
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements ML22287A1572022-12-0505 December 2022 Issuance of Amendment No. 171 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22230C9242022-09-30030 September 2022 Issuance of Amendment No. 170 Revision of 120-Volt AC Vital Instrument Panel Requirements ML21008A0142021-02-25025 February 2021 Issuance of Amendment No. 168 Revise Technical Specification Table 3.3.4 to Change Time Delay Setpoints for Degraded Voltage Relays ML20293A1572020-12-28028 December 2020 Issuance of Amendment No. 167 Reactor Trip System Instrumentation Technical Specification Changes to Implement WCAP-14333 and WCAP-15376 ML20298A2532020-11-24024 November 2020 Issuance of Amendment No. 166 Revise Technical Specification 3/4.8.1, A.C. Sources Operating ML20318A0032020-11-24024 November 2020 Issuance of Revised Page for Renewed Facility Operating License Atomic Safety and Licensing Board Decisions LBP-20-09 and LBP-20-12 ML20070Q0712020-03-27027 March 2020 Issuance of Amendment No. 165 Emergency Core Cooling System Accumulator Technical Specification Changes ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML19326C4802019-12-0505 December 2019 Issuance of Amendment No. 163 One-Time Change to the Onsite Power Distribution Requirements ML19224A5632019-11-18018 November 2019 Issuance of Amendment No. 162 Revisions to Technical Specifications Associated with Movable Control Rods ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19129A2432019-05-10010 May 2019 Correction to Amendment No. 160 Regarding Measurement and Assessment Frequency for Technical Specification 6.7.6 L, Control Room Envelope Habitability Program ML19065A2152019-03-29029 March 2019 Issuance of Amendment No. 160 Measurement and Assessment Frequency for Technical Specification 6.7.6.l, Control Room Envelope Habitability Program ML18355A4912019-03-12012 March 2019 Renewed Facility Operating License ML18204A2912019-03-11011 March 2019 Issuance of Amendment No. 159 Methodology for Analysis of Seismic Category I Structures with Concrete Affected by Alkali-Silica Reaction ML18247A5382018-11-27027 November 2018 Issuance of Amendment No. 158 Removing Requirement to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications ML18199A6092018-08-0707 August 2018 Issuance of Amendment No. 157 Changes to the Technical Specifications Requirements for DC Batteries (CAC No. MG0046; EPID L-2017-LLA-0289) ML17102A8892017-04-13013 April 2017 Issuance of Amendment Licensing Basis Change for Service Water Cooling Tower ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) SBK-L-16082, Supplement to License Amendment Request 16-01 Request to Extend Containment Leakage Test Frequency2016-05-31031 May 2016 Supplement to License Amendment Request 16-01 Request to Extend Containment Leakage Test Frequency ML16068A1302016-02-27027 February 2016 License Amendment Request 15-02, Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 Development of Emergency Action Levels for Non-Passive Reactors ML15096A2552015-11-0202 November 2015 Issuance of Amendment Regarding License Amendment Request 14-04, Revised Reactor Coolant System Pressure-Temperature Limits Applicable for 44 Effective Full Power Years ML15231A1442015-10-0606 October 2015 Issuance of Amendment No. 150 Regarding Note for Reactor Coolant System Surveillance Requirements ML15096A1312015-07-17017 July 2015 Issuance of Amendment Regarding Changes to Technical Specification 3.3.3.1, Radiation Monitoring for Plant Operations ML15118A6322015-05-18018 May 2015 Issuance of Amendment Regarding License Amendment Request Regarding New Fuel Valut ML15082A2332015-04-24024 April 2015 Issuance of Amendment Regarding Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement ML15058A7062015-04-22022 April 2015 Issuance of Amendment No. 146 Regarding the Cyber Security Plan Implementation Schedule ML15002A2512015-03-31031 March 2015 Unit No.1 - Issuance of Amendment Regarding License Amendment Request 14-06, Application Regarding the Removal of the Cold Leg Injection Permissive from Technical Specifications ML14345A2882015-02-0606 February 2015 Issuance of Amendment Regarding Technical Specifications Task Force Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation Using the Consolidated Line Item Improvement Process ML14363A2752015-02-0404 February 2015 Non-Proprietary SE for Issuance of Amendment Regarding License Amendment Request Regarding Fixed Incore Detector System Analysis ML14184A7952014-09-0303 September 2014 Issuance of Amendment Regarding License Amendment Request Regarding Fuel Storage Changes ML13212A0692014-07-24024 July 2014 Issuance of Amendment Regarding the Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML14029A4452014-03-0606 March 2014 Issuance of Amendment Regarding License Amendment Request 12-04, Application Regarding Cold Leg Injection Permissive ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material ML13107A0162013-10-25025 October 2013 Issuance of Amendment Regarding the License Amendment Request 13-02, Application to Revise Technical Specifications to Adopt TSTSF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.. ML13204A3792013-07-26026 July 2013 Correction to Issuance of Amendment 137 Regarding the Administrative Changes and Corrections to the Technical Specifications ML13074A7602013-06-17017 June 2013 Issuance of Amendment Regarding the Administrative Changes and Corrections to the Technical Specifications ML13114A3172013-04-25025 April 2013 Correction to Issuance of Amendment 136 Addition of Action Statement to Limiting Condition for Operation 3.6.5.1, Containment Enclosure Emergency Air Cleanup System ML1130000632013-04-23023 April 2013 Issuance of Amendment Addition of Action Statement to Limiting Condition for Operation 3.6.5.1, Containment Enclosure Emergency Air Cleanup System ML1208205102013-04-15015 April 2013 Issuance of Amendment Revision to the Applicability of the Reactor Coolant System Pressure-Temperature Limits and the Cold Overpressure Protection Setpoints ML13028A1462013-04-0404 April 2013 Issuance of Amendment Regarding the Extension of the Inspection Interval for the Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process ML12332A3012013-01-31031 January 2013 Issuance of Amendment Emergency Plan ML12237A0942012-11-0202 November 2012 Issuance of Amendment Cyber Security Program ML12178A5372012-09-10010 September 2012 Issuance of Amendment Permanent Application of Steam Generator Tube Alternate Repair Criteria, H* ML1200302712012-02-23023 February 2012 Issuance of Amendment Regarding the Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation ML1120700482011-08-23023 August 2011 Issuance of Amendment Approval of Cyber Security Plan 2024-09-20
[Table view] Category:Safety Evaluation
MONTHYEARML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code ML22287A1572022-12-0505 December 2022 Issuance of Amendment No. 171 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22262A3142022-10-0404 October 2022 Relief Requests 3IR-18 and 3IR-19, Relief from the Requirements of the ASME Code ML22230C9242022-09-30030 September 2022 Issuance of Amendment No. 170 Revision of 120-Volt AC Vital Instrument Panel Requirements ML21008A0142021-02-25025 February 2021 Issuance of Amendment No. 168 Revise Technical Specification Table 3.3.4 to Change Time Delay Setpoints for Degraded Voltage Relays ML20293A1572020-12-28028 December 2020 Issuance of Amendment No. 167 Reactor Trip System Instrumentation Technical Specification Changes to Implement WCAP-14333 and WCAP-15376 ML20298A2532020-11-24024 November 2020 Issuance of Amendment No. 166 Revise Technical Specification 3/4.8.1, A.C. Sources Operating ML20070Q0712020-03-27027 March 2020 Issuance of Amendment No. 165 Emergency Core Cooling System Accumulator Technical Specification Changes ML20073E4342020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML20076D2812020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19340A1282019-12-13013 December 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19326C4802019-12-0505 December 2019 Issuance of Amendment No. 163 One-Time Change to the Onsite Power Distribution Requirements ML19224A5632019-11-18018 November 2019 Issuance of Amendment No. 162 Revisions to Technical Specifications Associated with Movable Control Rods ML19249B1012019-09-30030 September 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code; Relief Request RA-19-001 ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19065A2152019-03-29029 March 2019 Issuance of Amendment No. 160 Measurement and Assessment Frequency for Technical Specification 6.7.6.l, Control Room Envelope Habitability Program ML18204A2912019-03-11011 March 2019 Issuance of Amendment No. 159 Methodology for Analysis of Seismic Category I Structures with Concrete Affected by Alkali-Silica Reaction ML18247A5382018-11-27027 November 2018 Issuance of Amendment No. 158 Removing Requirement to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications ML18199A6092018-08-0707 August 2018 Issuance of Amendment No. 157 Changes to the Technical Specifications Requirements for DC Batteries (CAC No. MG0046; EPID L-2017-LLA-0289) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML17102A8892017-04-13013 April 2017 Issuance of Amendment Licensing Basis Change for Service Water Cooling Tower ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17080A0382017-03-27027 March 2017 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML17046A4432017-03-15015 March 2017 Issuance of Amendment Extension of Containment Leakage Rate Test Frequency ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16321A4182016-12-0101 December 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 (CAC Nos. MF0836 and MF0837) ML15096A2552015-11-0202 November 2015 Issuance of Amendment Regarding License Amendment Request 14-04, Revised Reactor Coolant System Pressure-Temperature Limits Applicable for 44 Effective Full Power Years ML15231A1442015-10-0606 October 2015 Issuance of Amendment No. 150 Regarding Note for Reactor Coolant System Surveillance Requirements ML15205A3332015-07-28028 July 2015 Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Request for Exemption from Table 1 of 10 CFR Part 50, Appendix G NextEra Energy Seabrook, LLC Seabrook Station, Unit 1 Docket No. 50-443 ML15096A1432015-07-28028 July 2015 Exemption from Specific Requirements of 10 CFR Part 50, Appendix G, and 10 CFR 50.60 ML15096A1312015-07-17017 July 2015 Issuance of Amendment Regarding Changes to Technical Specification 3.3.3.1, Radiation Monitoring for Plant Operations ML15118A6322015-05-18018 May 2015 Issuance of Amendment Regarding License Amendment Request Regarding New Fuel Valut ML15082A2332015-04-24024 April 2015 Issuance of Amendment Regarding Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement ML15058A7062015-04-22022 April 2015 Issuance of Amendment No. 146 Regarding the Cyber Security Plan Implementation Schedule ML15002A2512015-03-31031 March 2015 Unit No.1 - Issuance of Amendment Regarding License Amendment Request 14-06, Application Regarding the Removal of the Cold Leg Injection Permissive from Technical Specifications ML14345A2882015-02-0606 February 2015 Issuance of Amendment Regarding Technical Specifications Task Force Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation Using the Consolidated Line Item Improvement Process ML14363A2752015-02-0404 February 2015 Non-Proprietary SE for Issuance of Amendment Regarding License Amendment Request Regarding Fixed Incore Detector System Analysis ML14184A7952014-09-0303 September 2014 Issuance of Amendment Regarding License Amendment Request Regarding Fuel Storage Changes ML13212A0692014-07-24024 July 2014 Issuance of Amendment Regarding the Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML14071A4102014-04-10010 April 2014 Request for Relief RA-14-001 from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection Piping (TAC No. Mfxxxx) ML14029A4452014-03-0606 March 2014 Issuance of Amendment Regarding License Amendment Request 12-04, Application Regarding Cold Leg Injection Permissive ML13213A1432014-03-0505 March 2014 Issuance of Amendment Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material 2024-09-25
[Table view] |
Text
October 3, 2003 Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE:
CHANGES TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH SECONDARY COOLANT SPECIFIC ACTIVITY (TAC NO. MB7713)
Dear Mr. Warner:
The Commission has issued the enclosed Amendment No. 92 to Facility Operating License No.
NPF-86 for the Seabrook Station, Unit No. 1, in response to your application dated February 3, 2003.
The amendment restricts the applicability of Technical Specification (TS) 3/4. 3.7.1.4, Turbine Cycle - Specific Activity, while in MODE 4. Additionally, it revises the applicable surveillance requirement for TS 3.7.1.4 and adopts similar wording as presented in the improved Standard Technical Specifications for Westinghouse plants (NUREG-1431, Revision 2).
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosures:
- 1. Amendment No. 92 to NPF-86
- 2. Safety Evaluation cc w/encls: See next page
October 3, 2003 Mr. Mark E. Warner, Site Vice President c/o James M. Peschel Seabrook Station PO Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE:
CHANGES TO TECHNICAL SPECIFICATIONS ASSOCIATED WITH SECONDARY COOLANT SPECIFIC ACTIVITY(TAC NO. MB7713)
Dear Mr. Warner:
The Commission has issued the enclosed Amendment No. 92 to Facility Operating License No.
NPF-86 for the Seabrook Station, Unit No. 1, in response to your application dated February 3, 2003.
The Amendment restricts the applicability of Technical Specification (TS) 3/4.3.7.1.4, Turbine Cycle - Specific Activity, while in MODE 4. Additionally, it revises the applicable surveillance requirement for TS 3.7.1.4 and adopts similar wording as presented in the improved Standard Technical Specifications for Westinghouse plants (NUREG-1431, Revision 2).
A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Victor Nerses, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosures:
- 1. Amendment No. 92 to NPF-86
- 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC PDI-2 Rdg. CHolden JClifford VNerses CRaynor OGC ACRS GHill(2) WBeckner BMcDermott, RGN-I KKavanagh ADAMS Accession Numbers:
Package: ML Letter: ML032250018 TS(s): ML *See previous concurrence OFFICE PDI-2/PM PDI-2/LA IROB/SC* OGC PDI-2/SC NAME VNerses CRaynor TBoyce AFernandez JClifford DATE 9/4/03 9/2/03 8/28/03 9/15/03 10/2/03 OFFICIAL RECORD COPY
Seabrook Station, Unit No. 1 cc:
Mr. J. A. Stall Mr. Stephen McGrail, Director Senior Vice President, Nuclear and ATTN: James Muckerheide Chief Nuclear Officer Massachusetts Emergency Management Agency Florida Power & Light Company 400 Worcester Road P.O. Box 14000 Framingham, MA 01702-5399 Juno Beach, FL 33408-0420 Philip T. McLaughlin, Attorney General Mr. Peter Brann Steven M. Houran, Deputy Attorney Assistant Attorney General General State House, Station #6 33 Capitol Street Augusta, ME 04333 Concord, NH 03301 Resident Inspector Mr. Donald Bliss, Director U.S. Nuclear Regulatory Commission New Hampshire Office of Emergency Seabrook Nuclear Power Station Management P.O. Box 1149 State Office Park South Seabrook, NH 03874 107 Pleasant Street Concord, NH 03301 Town of Exeter 10 Front Street Mr. Daniel G. Roy Exeter, NH 03823 Nuclear Training Manager Seabrook Station Regional Administrator, Region I FPL Energy Seabrook, LLC U.S. Nuclear Regulatory Commission P.O. Box 300 475 Allendale Road Seabrook, NH 03874 King of Prussia, PA 19406 Mr. Gene F. St. Pierre Office of the Attorney General Station Director One Ashburton Place, 20th Floor Seabrook Station Boston, MA 02108 FPL Energy Seabrook, LLC P.O. Box 300 Board of Selectmen Seabrook, NH 03874 Town of Amesbury Town Hall Mr. M. S. Ross, Attorney Amesbury, MA 01913 Florida Power & Light Company P.O. Box 14000 Mr. Dan McElhinney Juno Beach, FL 33408-0420 Federal Emergency Management Agency Region I Mr. Rajiv S. Kundalkar J.W. McCormack P.O. & Vice President - Nuclear Engineering Courthouse Building, Room 401 Florida Power & Light Company Boston, MA 02109 P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Jack Devine Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019
FPL ENERGY SEABROOK, LLC, ET AL.*
DOCKET NO. 50-443 SEABROOK STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 92 License No. NPF-86
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by the FPL Energy Seabrook, LLC, et al. (the licensee), dated February 3, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and, (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and, E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- FPL Energy Seabrook, LLC (FPLE Seabrook), is authorized to act as agent for the: Hudson Light & Power Department, Massachusetts Municipal Wholesale Electric Company, and Taunton Municipal Light Plant and has exclusive responsibility and control over the physical construction, operation and maintenance of the facility.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-86 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 92, and the Environmental Protection Plan contained in Appendix B are incorporated into Facility License No. NPF-86. FPLE Seabrook shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
James W. Clifford, Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: October 3, 2003
ATTACHMENT TO LICENSE AMENDMENT NO. 92 FACILITY OPERATING LICENSE NO. NPF-86 DOCKET NO. 50-443 Replace the following pages of the Appendix A, Technical Specifications, with the attached revised pages as indicated. The revised pages are identified by amendment number and contain marginal lines indicating the area of change.
Remove Insert vii vii 3/4 7-7 3/4 7-7 3/4 7-8 3/4 7-8 B 3/4 7-2 B 3/4 7-2
-- B 3/4 7-2a
-- B 3/4 7-2b
-- B 3/4 7-2c
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 92 TO FACILITY OPERATING LICENSE NO. NPF-86 FPL ENERGY SEABROOK, LLC SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443
1.0 INTRODUCTION
By application dated February 3, 2003, FPL Energy Seabrook, LLC (the licensee), requested changes to the Technical Specifications (TSs) for Seabrook Station (Seabrook). The proposed changes would revise the Seabrook TS 3/4.7.1.4, Turbine Cycle - Specific Activity.
Specifically, the proposed changes would revise the applicability of TS 3/4.7.1.4 while in MODE 4. Additionally, it revises the applicable surveillance requirement (SR) for TS 3/4.7.1.4 and adopts wording similar to that presented in the improved Standard Technical Specifications (STS) for Westinghouse plants (NUREG-1431, Revision 2).
2.0 REGULATORY EVALUATION
The Seabrook Updated Final Safety Analysis Report (UFSAR) Section 15.1 provides analysis of the design-basis accidents (DBAs) that result in an increase in heat removal by the secondary system. Subsection 15.1.5 analyzes the consequences for a main steamline break (MSLB). In this analysis, it is assumed that iodine will be the dominant factor for release consequences.
This is due to the operation of the Main Steam Condenser Evacuation System, which constantly removes the noble gas inventory of the secondary system. Section 15.B of the UFSAR lists the assumed initial specific activity of the secondary coolant system to be less than or equal to 0.1
µCi/gm DOSE Equivalent I-131 (DEI). Given this and other assumed initial conditions, the Seabrook UFSAR analysis shows that the dose consequences of a MSLB remain within the limits specified in Title 10 of the Code of Federal Regulations (10 CFR), Part 100.
Section 50.36 of 10 CFR sets forth the regulatory requirements for the content of the TSs. This regulation requires, among other categories, that the TSs contain limiting conditions for operation (LCOs). Section 50.36(c)(2)(ii) of 10 CFR gives four criteria to be used in determining whether a LCO is required to be included in the TSs. These criteria are as follows:
- 1. Installed instrumentation that is used to detect, and indicate in the control room, a significant abnormal degradation of the reactor coolant pressure boundary.
- 2. A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
- 3. A structure, system, or component (SSC) that is part of the primary success path and which functions or actuates to mitigate a DBA or transient that either assumes the failure of or presents a challenge to the integrity of a fission product barrier.
- 4. An SSC which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
Existing LCOs and related surveillances included as TS requirements which satisfy any of the criteria stated above must be retained in the TSs. Secondary specific activity limits satisfy Criterion 2 of 10 CFR 50.36(c)(2)(ii). The NRC has previously approved the similar changes on a plant specific basis. This includes North Anna Units 1 and 2, dated April 5, 2002, (ADAMS Accession Number ML021200265).
3.0 TECHNICAL EVALUATION
The licensee has proposed several changes to TS 3/4.7.1.4. The changes proposed would modify the LCOs applicability and SR. Additionally, the licensee has proposed administrative changes that use wording similar to that in the improved STS.
3.1 LCO 3.7.1.4 Applicability LCO 3.7.1.4 requires that the specific activity of the secondary coolant be less than or equal to 0.1 µCi/gm DEI to maintain the radiological consequences of a design basis MSLB within the required limit of 10 CFR Part 100. TS 3.7.1.4 is applicable in MODES 1, 2, 3 and 4. MODE 4 is generally a transitional mode of operation. In MODES 5 and 6, the steam generators (SGs) are not being used for heat removal. Both the Reactor Coolant System (RCS) and SGs are depressurized, and primary to secondary LEAKAGE is minimal. Therefore, monitoring of secondary specific activity is not required for MODES 5 and 6.
The licensee has proposed to condition the current TS Applicability for MODE 4 with the following footnote:
The provisions of Specification 4.0.4 are not applicable for entry into MODE 4, however, once steam generator pressure exceeds 100 psig, the requirements of Specification 4.7.1.4 must be met within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> if not performed within the past 31 days.
The proposed note would allow entry into MODE 4 without performance of the SR (4.7.1.4) for LCO 3.7.1.4 within the stated surveillance interval. However, the note would also require that the requirements of SR 4.7.1.4 be met within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> once the SG pressure exceeds 100 psig if the surveillance was not performed within the past 31 days.
The U.S. Nuclear Regulatory Commission (NRC or the Commission) staff evaluated the proposed note with respect to time, SR 4.7.1.4, and safety significance. This note would only be applicable in MODE 4 for a limited amount of time, i.e., entrance into MODE 4 up to the point where the SG pressure exceeds 100 psig for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The revised SR 4.7.1.4, discussed in Section 3.2, requires verification of specific activity of the secondary coolant to be
less than or equal to 0.1 µCi/gm DEI. In order to get a representative sample, the SGs must have sufficient pressure, temperature, and levels. Therefore, SR 4.7.1.4 can only be performed at the upper operational conditions of MODE 4, i.e., SG pressure > 100 psig. In addition, the SGs are generally drained, sludge lanced, and refilled during refueling outages. Thus, a large amount of any activity that may be present in the SGs would be removed during these operations. Therefore, it is concluded that there would not be a significant amount of activity that could be released if a DBA occurred during the time of the footnote applicability. In addition, any leakage from the RCS into the SG will be limited by TS 3.4.6.2, Reactor Coolant System Leakage, Operational Leakage, for entry into MODE 4. This leakage will be detected prior to the re-establishment of the ability to sample the SGs. Based on the above, the staff concludes that there is reasonable assurance that the secondary coolant will remain below design-basis considerations while in MODE 4 with SG pressure below 100 psig, therefore, maintaining the radiological consequence of a design basis MSLB within the required limit of 10 CFR Part 100.
3.2 SR 4.7.1.4 The current SR 4.7.1.4 states that the specific activity of the secondary coolant system shall be determined to be within the limit by performance of the sampling and analysis program of Table 4.7-1. Table 4.7-1 requires the measurement of gross radioactivity at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and DEI concentration 1) once per 31 days when the gross radioactivity is greater than 10 percent of the allowable limit, and 2) once per six months when the gross radioactivity is less than or equal to 10 percent of the allowable limit. The licensee has proposed to delete Table 4.7-1 and incorporate the STS SR 3.7.18.1 wording. STS SR 3.7.18.1 requires the verification of specific activity of the secondary coolant is # 0.10 µCi/gm DEI once every 31 days. The staff finds this change to be acceptable, as discussed below.
The purpose of measurement of the gross radioactivity (item 1 of Table 4.7-1) requirement is to determine the sampling frequency of DEI. The Seabrook UFSAR considers the contribution of I-131 to be the dominant to the radioactivity release in the event of a MSLB. The contribution of noble gases is considered to be negligible, due to their continuous removal by the Main Steam Condenser Evacuation System. Therefore, gross radioactivity is not considered as an initial condition in the consequence analysis of a MSLB (or any other transient) in the Seabrook UFSAR. Given this consideration, a measurement of gross radioactivity does not meet the four criteria of 10 CFR 50.36(c)(2), and is, therefore, not required to be included in SR 4.7.1.4.
Table 4.7-1, Item 2a, DEI measurement once per 31 days, is incorporated into the revised SR 4.7.1.4 and, therefore, is being maintained in the TSs. Table 4.7-1, Item 2b, allows the sampling frequency of DEI to be extended to once per six months whenever the gross radioactivity determination indicated the iodine concentrations are below 10 percent of the allowable limits. The revised SR 4.7.1.4 instead requires verification of specific activity of the secondary coolant every 31 days whenever the SR is applicable, regardless of the gross radioactivity determination. Therefore, the NRC staff finds this deletion is acceptable because it is more restrictive to have DEI analyzed every 31 days rather than allowing a frequency extension based on the gross radioactivity determination.
3.3 Administrative Changes The licensee has proposed the following administrative changes:
a) deletion of Table 4.7-1 from the index. The index will state This table number is not used b) replace microCurie/gram in the LCO and Action Statement with µCi/gm; and c) replacing Secondary Coolant System in the LCO and Action Statement with secondary coolant.
The NRC staff has reviewed these changes and found them to be administrative in nature having no impact on the public health and safety, and are therefore, acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New Hampshire and Massachusetts State officials were notified of the proposed issuance of the amendment. The State officials had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (68 FR 22748). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner; (2) such activities will be conducted in compliance with the Commission's regulations; and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: K. Kavanagh Date: October 3, 2003