ML022890453

From kanterella
Revision as of 06:39, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Correction to Issuance of Amendments 201 and 206
ML022890453
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/21/2002
From: Spaulding D
NRC/NRR/DLPM/LPD3
To: Cayia F
Nuclear Management Co
References
Download: ML022890453 (3)


Text

October 21, 2002 Mr. Fred J. Cayia Acting Site Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - CORRECTION TO AMENDMENT NOS. 201 AND 206

Dear Mr. Cayia:

On August 8, 2001, the U.S. Nuclear Regulatory Commission issued Amendment No. 201 to Facility Operating License No. DPR-24 and Amendment No. 206 to Facility Operating License No. DPR-27 for the Point Beach Nuclear Plant, Units 1 and 2, respectively. The amendments converted the then-current Technical Specifications (TSs) to improved TSs.

TS page 3.3.1-16 contained a typographical error in the Surveillance Requirements [SRs]

column of Table 3.3.1-1 (page 4 of 8). Specifically, for Function 17.b.(1), Power Range Neutron Flux, SR 3.1.1.11 should be SR 3.3.1.11. Please replace the corrected TS page 3.3.1-16 (enclosed) with the corresponding page issued with Amendment Nos. 201 and 206.

Sincerely,

/RA/

Deirdre Spaulding, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosure:

Corrected TS page 3.3.1-16 cc w/encl: See next page

ML022890453 Point Beach Nuclear Plant, Units 1 and 2 cc:

Mr. John H. ONeill, Jr. Ms. Sarah Jenkins Shaw, Pittman, Potts & Trowbridge Electric Division 2300 N Street, NW Public Service Commission of Wisconsin Washington, DC 20037-1128 P.O. Box 7854 Madison, WI 53707-7854 Mr. Richard R. Grigg President and Chief Operating Officer Mr. Roy A. Anderson Wisconsin Electric Power Company Executive Vice President and 231 West Michigan Street Chief Nuclear Officer Milwaukee, WI 53201 Nuclear Management Company, LLC 700 First Street Site Licensing Manager Hudson, WI 54016 Point Beach Nuclear Plant Nuclear Management Company, LLC Nuclear Asset Manager 6610 Nuclear Road Wisconsin Electric Power Company Two Rivers, WI 54241 231 West Michigan Street Milwaukee, WI 53201 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 March 2002