ML20063P380

From kanterella
Revision as of 02:33, 23 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1982
ML20063P380
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/06/1982
From: Mcbride L
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20063P375 List:
References
NUDOCS 8210130349
Download: ML20063P380 (5)


Text

,

TS,-3 j Att achment-D .

Issue 2 Page 1 of 1 OPERATINC DATA REPORT DOCKET NO. 50-267 DATE October 6. 19R2 CoMr.EnD af L. M. McBride nLErnoNE (303) 785-2224 OPERATI'!G STATUS uans

1. enic Name Fort St. Vrain
2. R. porting period: 820901 through 820930
3. Licensed Thermal Power f/t): 842
4. Nameplate Racing (Cross We): 342
3. Design Electrical Rating (Net We): 330
6. Fav4== Dependable Capacity (Grose We): 342 -
7. Maximus Dependable Capacity (Net We): 330 l S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since test Report, Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net We): 231
10. Reasons for Rastrictions, If Any: NRC restriction .)f 70% oendino resolution of temoerature fluctuations.

This Month Tear to Data Cumulative ti. auurs in Reporting period 720 6.551 28.512

2. :rueer of souts R=ctor va. Criticat 701.9 4.169.4 18.747.8
u. Reactor nesern Shutdown sours 0.0 0.0 0.0
14. aours cenerator on-Line 701.9 3.266.2 13.174.5
15. enic Reserve shutdown nours 0.0 0.0 0.0
16. Cron Thermal Energy Generated (WH) 407,778.9 1,842,485.5 6.776,430.3
17. cros. Electrical EnerSy c.nerated (si) 149,021 635,548 2.326,904 _

ts. set nectrual Energy cen. rated (sm) 140,362 581,845 2.136.104 l 19. Unit Service Factor 97.5 49.9 46.2

20. Unit Availability Factor 97.5 49.9 46.2 l 21. Unit Capacity Factor (Using MDC Net) 59.1 26.9  ?? 7
22. Unit Capacity Factor (Usics DER Net) 59.1 26.9 22.7 2J. Unic Forced Outage Rate 2.5_ 10.7 29.5
24. Shu: downs Scheduled over Next 6 Months (Type. Date, and Duration of Each): Maintenance outaae -

821101 throuah 821215 - 1.080 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Plant recoverv - 821001 th rough 821007 - 168

23. If Shut Down at End of Raport Period. Estimated Date of Startup 821008 hou rs .
26. Units In Test Statue (?tior es Comnercial Operation): Forecas t Achieved INInA1. CRInCAIIn N/A N/A InnAr. Etten cm N/A N/A en-rsew_ or tsAnoN N/A N/A

['3210130349 l PDR ADOCK 05000267 821006

R PDR -

AKP-3 Attachment-3A AVERAGE DAILY UNIT POWER LEVEL Issue 2 Page 1 of 1 Docket No. 50-267 Unit Fort St. Vrain Date October 6. 1982 Completed By L. M. McBride Telephone (303) 785-2224 Month Seotember. 1982 i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL '

(MWe-Net) (MWe-Net) 1 192.1 17 201.0 2 195.2 18 202.5 3 1Ro.R 19 202.5 4 198.7 20 202.8 5 197.7 21 202.0 .

6 197.5 22 202.7 7 198.4 23 203.2 _

8 198.2 24 202.1 9 1R6.0 25 201.7 10 201.5 26 201.1 11 202.6 27 195.0 12 202.1 28 203.1 13 202.4 29 203.4 14 202.0 30 42.4

15 203.5 31 N/A 16 201.9
  • Generator on line but no net generation.

, 1 , '

6 t

, ' t

~

C 3 E

- I O r t

n f H

F.

o t .

R e2 os - R I

cp h I t ai

. -3 C xe ts e t

E er Pt p g R rt St ma' 2 TAI P T n 8 4 N yr i 9 e 2 E V

bo a d 2 E_ t r 1_ i 2 R da V 2 Br 5- P er 6

c B 1 0 we on t r M Z l l e 7 S e .L3 l

o l g 6 b l T

o-2 t o M C fe

- r t 0 A n 0 o q . 3 E ni 5 F L (

V wb

- _ 0__ _ I T du or C tt

. E r f E E u

m nA i o = R R hd mD mx e

N D T

E x

T E

T E

C D 1 san C

i H L n N n v r

r N

T A pa m o

C E

S or U

A oc C

Ls

. T U N

R E

8 1

0 T fE S l I N

. UVI CE I

f D

TE SD H

YO B S 2 SC I l

l U

8 T 9 C

U J

1 1_

F R' ra R~ e F b i

n m e

l'( t_

p

- D A N

A e /

  • S_ N s

t f

- I W t n

i R

E D N L T o U

H n F S T R

OGN R

~

T I

o r

DI OT O

T N t TNC U u 1 1UWA 3 EHOE P SDR 8

10 5

A E

H .

R N 1 O .

I

_. T 8 A 1 R

fM E

P F Y

T 0

3 E 9 T

A 0 D 2 B

4 1

). 0 2-t M

3

R"UET.*7G I. /CREL""_CN T

1. Neste of 7ec111t-r. Fort St. Vrzin Uni: No. 1
2. Scheduled date for mezc refueling shutdevn. Oc:ober 1. 1983
3. Scheeuled date for . w .

l following refueline. c.c.e .,i. ion 3 l .

4. Wf " refueling or resumption of ,

~~

operacion thereafter require a tacha % ' specificacion change or other license -d-t? Yes l

If answer is yea, what, in

( tener:1, will these be? Use of type H-451 graohite. , , ,

l t If answer is so, has the reload fuel design and core c=nfigura- .

1on been reviewed by your Planc Safecy Reviaw Cc.mait:se to decer-
i== whether any unreviewed safety questions are associated

-e % che core sload (3eference 10C71 See:1cn 50.39)?

If =a cuch review has taken -

olace, when is it scheduled?

5. Scheduled da:e(s) for submi::dag proposed licensing action and i suumorting infor=stion. Not scheduled at this tic:e: to be determined.

( -

l 6. Impor:xa: licensing considera-ciots u sociated vi.h refueling, e.g., new or differene fuel de-sign or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operacing pro-endurss.

7. ne number of fuel assemblies 1482 ETGR fuel elenen:s (a) in de core and (b) in - spenc s. GR fuel eier.ents l the scene fuel storste ecol.
3. 3e presen: licensed spene fuel l pool storage capaci:7 and de Capaci:7 is 11=1:ed in si:a to abou: one-l size of any increase in licensed dir:i of core (approximacaly 500 CGR l storage capac1:7 :ha: Sas been elemen:s). No change is planned.

l l requested or is planned, in l [ sumber of fuel assemblies.

l l

l t

t REFUEI,ING INFORMATION (CONTINUED) 1

9. The projected date of the ' 1992 under Agreements AT(04-3)-633 and last refueling that can be ' DE-SC07-791D01370 between Public Service discharged to the spent. fuel Company of Colorado, General Atomic.

pool assuming the present Company,.and DOE.*

licensed capacity.

  • The 1992 estimated date is based on the understanding that spent fuel discharged during the term of the Agreements will be stored by DOE at the Idaho Chemical Processing Plant. The storage capacity has evidently been sized to accomodate eight fuel segments. It is estimated that the eighth fuel segment will be discharged in 1992.

.