MONTHYEARML0204406082002-03-21021 March 2002 Letter Re Request for Withholding Information from Public Disclosure Per 10 CFR 2.790 Concerning the Evaluation of Risk Significant Integrated Leak Rate Test Extension Project stage: Withholding Request Acceptance ML0224804282002-08-27027 August 2002 Response to Request for Additional Information Re Steam Generator Replacement & Power Uprate License Amendment Request Project stage: Response to RAI ML0229403852002-10-11011 October 2002 Westinghouse Electric Co., Response to RAI Application for Amendment to License Concerning Power Uprate for Palo Verde, Unit 2 Project stage: Response to RAI ML0316813132003-06-10010 June 2003 Results of Review for Factual Accuracy in Draft Safety Evaluation Report (SER) Project stage: Draft Other ML0317100212003-06-20020 June 2003 Palo Verde, Meeting Notice with Arizona Public Service Company to Discuss Use of S2M Methodology for SBLOCA at Proposed Higher Power Levels at Palo Verde Nuclear Generating Station, Unit 2 Project stage: Meeting ML0318804842003-06-26026 June 2003 Slides - Handout with Summary of Meeting with Arizona Public Service Co. Proprietary Information Presented. TAC MB3696 Project stage: Meeting ML0318200622003-06-26026 June 2003 Meeting Handouts to Address the Staff'S Concerns About Use of S2M SBLOCA Methodology in the Unit 2 Power Uprate Application Dated 12/21/2001 Project stage: Meeting ML0325411132003-09-11011 September 2003 Summary of Meeting with Arizona Public Service Co. Proprietary Information Presented. Tac. MB3696 Project stage: Meeting ML0327205382003-09-29029 September 2003 9/29/03 - Palo Verde Nuclelar Generating Station, Unit 2 (PVNGS-2) Issuance of Amendment 149 on Replacement of Steam Generators and Uprated Power Operations (Tac. MB3696) Project stage: Approval ML0327306662003-09-29029 September 2003 TS Pages - Palo Verde Amendment 149 Project stage: Other 2003-06-10
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23090A1392023-04-0404 April 2023 April 4, 2023 Presubmittal Meeting Presentation - LAR to Adopt TSTF-266, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (EPID: L?2023?LRM-0017) ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19192A0972019-07-11011 July 2019 License Amendment Request for Emergency Plan, July 11, 2019 ML18299A0722018-09-26026 September 2018 Ionizing Radiation Factsheet-Veterans - Information for Veterans and Their Families ML17320A1932017-11-15015 November 2017 NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML16357A6872016-12-20020 December 2016 One-Time License Amendment Request Unit 3 Train B Diesel Generator ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13308C3402013-11-0404 November 2013 SG Unit 3 Telephone Call ML13025A2832013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Palo Verde ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12243A4382012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT Vs Rt Discussion ML12243A4472012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT in Lieu of Rt for Nuclear Power Plant Applications ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML11188A0722011-07-0606 July 2011 NRC Meeting with NEI and Licensees June 28, 2011 Workshop Engineering Approach Rev F 2024-02-07
[Table view] |
Text
NRC FORM 658 U.S. NUCLEAR REGULATORY COMMISSION
(-1999)
TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE PLACEMENT IN THE PUBLIC DOMAIN This form is to be filled out (typed or hand-printed) by the person who announced the meeting (i.e., the person who issued the meeting notice). The completed form, and the attached copy of meeting handout materlals, will be sent to the Document Control Desk on the same day of the meeting; under no circumstances will this be done later than the working day after the meeting.
Do not Include proprietarymaterials.
DATE OF MEETING The attached document(s), which was/were handed out in this meeting, is/are to be placed 06J26/2003 in the public domain as soon as possible. The minutes of the meeting will be issued in the near future. Following are administrative details regarding this meeting:
Docket Number(s) 50-528 Plant/Facility Name Palo Verde Nuclear Generating Station, Unit 2 TAC Number(s) (if available) TAC No. MB369,6 Reference Meeting Notice ML031710021 Purpose of Meeting (copy from meeting notice) The licensee requested the meeting to address the staff's concerns about use of S2M SBLOCA methodology in the Unit 2 power uprate application dated 12/21/2001.
NAME OF PERSON WHO ISSUED MEETING NOTICE TITLE Jack Donohew Senior Project Manager OFFICE Office of Nuclear Reactor Regulation DMSION Division of Licensing Project Management BRANCH Project Directorate IV Distribution of this form and attachments:
Docket File/Central File PUBLIC 71Fok NRC FORM 658 (9-1999) PRINTED ON RECYCLED PAPER This form was designed using InFornts
\8
, .. 0 - ~
APS/Westinghouse Meeting with NRC June 26, 2003 k,
-The S2M EM Generic TPopctal Report was approved by the NRC in December of 1997 for all CE PWR's without any Conditions or Limitations related to Core Power
-The NRC SER for the S2M EM- concluded the model provided "improved realism" while retaining "significant conservatism"
-The S2M EM is currently the licensing basis for all 3 PV units at 3876 MWt
-In fact, S2M is required to be used by the approved and implemented Zirlo topical
- The Unit 2 power uprate draft SER proposes a License Condition that would impose the S1 M EM at PVNGS on the basis that S2M has not been approved for power levels above 3400 MWt
- This proposal is contrary to NRC's approval of the S2M EM
- The NRC is using the PV docket and this licensing action to reopen the evaluation of an approved EM
- The proposed License Condition (workaround) in the Unit 2 power uprate draft SER creates a licensing basis problem for all 3 PV units not just PV Unit 2 Ad
- We do not see a clear success path through this problem if we are required to revert to SI M due to the complexities it introduces into our current licensing basis
- The power uprate SER would have to supersede previous License Amendment SERs as well as approved topical report SERs
- Gain acceptance that the S2M Evaluation Model, as originally approved by the NRC in the existing SER, is not power level dependent and, as such, is applicable at 3990 MWt
- Obtain a mutually agreed upon schedule for a revision to the applicable section of the Power Uprate draft SER for PVNGS-2
- Success path for achieving stated goals
- The requested sensitivity calculations have been completed
- These demonstrate that the S2M hot rod heatup calculation is not uniquely impacted by variations in core power
- The NRC accepts the applicability of the S1 M to PVNGS-2 at 3990 MWt, and
- The blowdown hydraulics calculation for the S2M is essentially identical to that of the S1 M, therefore
- It is appropriately concluded that the S2M EM is applicable to a core power level of 3990 MWt