ML031710021

From kanterella
Jump to navigation Jump to search

Palo Verde, Meeting Notice with Arizona Public Service Company to Discuss Use of S2M Methodology for SBLOCA at Proposed Higher Power Levels at Palo Verde Nuclear Generating Station, Unit 2
ML031710021
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/20/2003
From: Donohew J
NRC/NRR/DLPM/LPD4
To: Stephen Dembek
NRC/NRR/DLPM/LPD4
Donohew J N, NRR/DLPM,415-1307
References
TAC MB3696
Download: ML031710021 (4)


Text

June 20, 2003 MEMORANDUM TO: Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Jack Donohew, Senior Project Manager, Section 2 /RA by BBenney for/

Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH ARIZONA PUBLIC SERVICE COMPANY ON PALO VERDE NUCLEAR GENERATING STATION, UNIT 2 (TAC NO. MB3696)

DATE & TIME: Thursday, June 26, 2003 10:30 a.m. - 03:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 10-B-4 Rockville, Maryland PURPOSE: The licensee submitted an application dated December 21, 2001, for a license amendment to increase its licensed power level. The licensee requested the meeting to address the staff concerns about the use of the S2M methodology for the small-break loss-of-coolant accident (SBLOCA) at the proposed higher power levels.

CATEGORY:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Portions of this meeting will be closed to the public if the information to be presented has been determined by the staff to be proprietary.

PARTICIPANTS: NRC Participants are in the Office of Nuclear Reactor Regulation NRC UTILITY J. Uhle P. Crawley S. Dembek J. Cleary (contractor)

J. Donohew, et al. T. Weber, et al.

Docket No. STN 50-529

Attachment:

Agenda (ADAMS Accession No. ML031710021) cc w/att: See next page MEETING CONTACTS: Jack Donohew, NRR Alan Wang, NRR 301-415-1307 301-415-1445 jnd@nrc.gov abw@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"

(67 FR 36920), May 28, 2002

ML031710021) cc w/att: See next page MEETING CONTACTS: Jack Donohew, NRR Alan Wang, NRR 301-415-1307 301-415-1445 jnd@nrc.gov abw@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"(67 FR 36920), May 28, 2002 ADAMS Accession No.: ML031710021 NRC-001 OFFICE PDIV-2/PM PDIV-1/LA PDIV-2/SC PDIV:D NAME BBenney for MMcAllister SDembek SDembek for JDonohew HBerkow DATE 6/20/03 6/20/03 6/20/03 6/20/03 DOCUMENT NAME: G:\PDIV-2\PaloVerde\Meeting Notice-06-26-03.pvngs.wpd FORTHCOMING MEETING WITH ARIZONA PUBLIC SERVICE COMPANY ON PALO VERDE NUCLEAR GENERATING STATION, UNIT 2 (TAC NO. MB3696)

Dated: June 20, 2003 DISTRIBUTION:

Hard Copy PUBLIC PDIV-2 Reading Receptionists OWFN/TWFN JDonohew E-mail RidsNrrAdpt (BSheron/MKotzalas)

RidsNrrDlpm (JZwolinski/TMarsh)

RidsNrrDlpmLpdiv (HBerkow)

RidsNrrAdpt (KJohnson)

RidsNrrDlpmLpdiv-2 (SDembek)

RidsNrrLAMMcAllister RidsOpaMail RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsRgn4MailCenter (AHowell)

MFields, EDO BHenderson (OPA)

TMensah(PMAS)

JWermiel (NRR/DSSA/SRXB)

JUhle (NRR/DSSA/SRXB)

FOrr (NRR/DSSA/SRXB)

PMNS Meeting Announcement Coordinator

AGENDA NRC/ARIZONA PUBLIC SERVICE COMPANY MEETING PALO VERDE NUCLEAR GENERATING STATION, UNIT 2 POWER UPRATE AMENDMENT - SBLOCA METHODOLOGY JUNE 26, 2003

  • Introduction
  • Westinghouse S2M Methodology for SBLOCA Dependence on Reactor Power
  • Information Needed by the Staff
  • Public Comments
  • Adjourn Meeting

Palo Verde Generating Station, Unit 2 cc:

Mr. Steve Olea Mr. John Taylor Arizona Corporation Commission Public Service Company of New Mexico 1200 W. Washington Street 2401 Aztec NE, MS Z110 Phoenix, AZ 85007 Albuquerque, NM 87107-4224 Douglas Kent Porter Mr. Jarlath Curran Senior Counsel Southern California Edison Company Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN Law Department, Generation Resources San Clemente, CA 92672 P.O. Box 800 Rosemead, CA 91770 Mr. Robert Henry Salt River Project Senior Resident Inspector 6504 East Thomas Road U.S. Nuclear Regulatory Commission Scottsdale, AZ 85251 P. O. Box 40 Buckeye, AZ 85326 Terry Bassham, Esq.

General Counsel Regional Administrator, Region IV El Paso Electric Company U.S. Nuclear Regulatory Commission 123 W. Mills Harris Tower & Pavillion El Paso, TX 79901 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. John Schumann Los Angeles Department of Water & Power Chairman Southern California Public Power Authority Maricopa County Board of Supervisors P.O. Box 51111, Room 1255-C 301 W. Jefferson, 10th Floor Los Angeles, CA 90051-0100 Phoenix, AZ 85003 Brian Almon Mr. Aubrey V. Godwin, Director Public Utility Commission Arizona Radiation Regulatory Agency William B. Travis Building 4814 South 40 Street P.O. Box 13326 Phoenix, AZ 85040 1701 North Congress Avenue Austin, TX 78701-3326 Mr. Craig K. Seaman, Director Regulatory Affairs/Nuclear Assurance Mr. Gregg R. Overbeck Palo Verde Nuclear Generating Station Senior Vice President, Nuclear P.O. Box 52034 Arizona Public Service Company Phoenix, AZ 85072-2034 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, AZ 85004