Inspection/Activity Plan for 09/01/2003 - 09/30/2004
ML032390298
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/26/2003
From:
NRC/RGN-II
To:
Shared Package
ML032390290 List:
References
Download: ML032390298 (2)


Text

Page 1 of 2 Vogtle 08/26/2003 10:40:12 Inspection / Activity Plan Report 22 09/01/2003 - 09/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 1, 2 IP 7111121 Safety System Design and Performance Capability 09/08/2003 09/12/2003 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U1 2 1 IP 7111108P Inservice Inspection Activities - PWR 10/06/2003 10/10/2003 Baseline Inspections BR2-FP - FLOOD PROTECTION 1 1, 2 IP 7111106 Flood Protection Measures 11/03/2003 11/05/2003 Baseline Inspections EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI 5 1, 2 IP 7111121 Safety System Design and Performance Capability 11/03/2003 11/07/2003 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 11/17/2003 11/21/2003 Baseline Inspections EB2-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 01/05/2004 01/09/2004 Baseline Inspections EB2-MR - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 02/09/2004 02/13/2004 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 03/01/2004 03/05/2004 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 03/01/2004 03/05/2004 Baseline Inspections PS-RP - RADIATION PROTECTION 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/12/2004 04/16/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/12/2004 04/16/2004 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 04/12/2004 04/16/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/12/2004 04/16/2004 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/19/2004 04/23/2004 Baseline Inspections PS-RP - RADIATION PROTECTION 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/26/2004 04/30/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/26/2004 04/30/2004 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 04/26/2004 04/30/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/26/2004 04/30/2004 Baseline Inspections EB1-TFP - TFP PRE-INSPECTION VISIT 4 1, 2 IP 7111105T Fire Protection 07/26/2004 07/30/2004 Baseline Inspections EB1-TFP - TRIENNIAL FIRE PROTECTION 4 1, 2 IP 7111105T Fire Protection 08/16/2004 08/20/2004 Baseline Inspections 1, 2 IP 7111105T Fire Protection 08/30/2004 09/03/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Vogtle 08/26/2003 10:40:12 Inspection / Activity Plan Report 22 09/01/2003 - 09/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EP - EP EXERCISE 2 1, 2 IP 7111401 Exercise Evaluation 09/20/2004 09/24/2004 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/20/2004 09/24/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/20/2004 09/24/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.