Vogtle Inspection / Activity Plan 09/01/2003 - 09/30/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/26/2003 10:40:12 Report 22 2
EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 09/08/2003 09/12/2003 Safety System Design and Performance Capability IP 7111121 1, 2 2
EB2-ISI
- INSERVICE INSPECTION-U1 Baseline Inspections 10/06/2003 10/10/2003 Inservice Inspection Activities - PWR IP 7111108P 1
1 BR2-FP
- FLOOD PROTECTION Baseline Inspections 11/03/2003 11/05/2003 Flood Protection Measures IP 7111106 1, 2 5
EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI Baseline Inspections 11/03/2003 11/07/2003 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 11/17/2003 11/21/2003 Safety System Design and Performance Capability IP 7111121 1, 2 1
EB2-HS
- HEAT SINK Baseline Inspections 01/05/2004 01/09/2004 Heat Sink Performance IP 7111107B 1, 2 1
EB2-MR
- MAINTENANCE RULE Baseline Inspections 02/09/2004 02/13/2004 Maintenance Effectiveness IP 7111112B 1, 2 3
EB2-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 03/01/2004 03/05/2004 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 03/01/2004 03/05/2004 Permanent Plant Modifications IP 7111117B 1, 2 2
PS-RP
- RADIATION PROTECTION Baseline Inspections 04/12/2004 04/16/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 04/12/2004 04/16/2004 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 04/12/2004 04/16/2004 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 04/12/2004 04/16/2004 Performance Indicator Verification IP 71151 1, 2 1
EB2-ISI
- INSERVICE INSPECTION-U2 Baseline Inspections 04/19/2004 04/23/2004 Inservice Inspection Activities - PWR IP 7111108P 2
2 PS-RP
- RADIATION PROTECTION Baseline Inspections 04/26/2004 04/30/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 04/26/2004 04/30/2004 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 04/26/2004 04/30/2004 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 04/26/2004 04/30/2004 Performance Indicator Verification IP 71151 1, 2 4
EB1-TFP
- TFP PRE-INSPECTION VISIT Baseline Inspections 07/26/2004 07/30/2004 Fire Protection IP 7111105T 1, 2 4
EB1-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections 08/16/2004 08/20/2004 Fire Protection IP 7111105T 1, 2 Baseline Inspections 08/30/2004 09/03/2004 Fire Protection IP 7111105T 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Vogtle Inspection / Activity Plan 09/01/2003 - 09/30/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/26/2003 10:40:12 Report 22 2
- EP EXERCISE Baseline Inspections 09/20/2004 09/24/2004 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 09/20/2004 09/24/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 09/20/2004 09/24/2004 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.