Letter Sequence Other |
---|
|
|
MONTHYEARML0300207432003-01-0202 January 2003 Facsimile Transmission of Issues Discussed in 12/10/2002 Conference Call Project stage: Other ML0305804242003-02-14014 February 2003 Proposed TS Change Deletion of Monthly Analog Rod Position Test Request for Additional Information Project stage: Request ML0310101972003-04-14014 April 2003 Memo to File Re. Facsimile Transmission of Issues to Be Discussed in a Conference Call Project stage: Other ML0316714602003-06-0909 June 2003 Proposed Technical Specifications Change Deletion of Monthly Analog Rod Position Test Request for Additional Information Project stage: Request ML0318400092003-07-0303 July 2003 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure For. Project stage: Withholding Request Acceptance ML0328014412003-10-0101 October 2003 Technical Specification Page for Amendment Nos. 237 and 236, Surry, Units 1 and 2, Respectively Project stage: Other ML0327903012003-10-0101 October 2003 Issuance of Amendment Nos. 237 and 236, Respectively, Revising the TS to Delete the Monthly Analog Rod Position Test for the Control Rod Bottom Bistables Project stage: Approval 2003-02-14
[Table View] |
Similar Documents at Surry |
---|
Category:Technical Specifications
MONTHYEARML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML22300A1882022-10-27027 October 2022 License Amendment Request 10-Day Allowed Outage Time for Opposite Unit Auxiliary Feedwater Cross-Connect Capability Response to Request for Additional Information ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis ML21277A0652021-09-30030 September 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines ML21106A2792021-05-0404 May 2021 Technical Specifications ML20301A4522020-10-28028 October 2020 Non-Proprietary, Issuance of Amendment Nos. 300 and 300 to Revise Technical Specifications 6.2.C, Core Operating Limits Report ML20115E2372020-05-0707 May 2020 Issuance of Exigent Amendments Nos. 299 and 299, to Revise TS 6.4.Q, Steam Generator (SG) Program, to Allow a One-Time Deferral of the Inspection of Surry Unit 2 Sg B Spring 2020 Refueling Outage ML19196A1102019-07-0909 July 2019 Attachments 2, 3 & 4 - Response to NRC Request for Additional Information and Correction of SBLOCA Analysis Error and Revised Marked-Up/Typed NAPS and SPS Technical Specifications Pages ML17326A2252018-02-0909 February 2018 Issuance of Amendments Regarding License Amendment Request to Revise Residual Heat Removal and Component Cooling System Technical Specifications Requirements (CAC Nos. MF9124 and MF9125; EPID L-2017-LLA-0166) ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML14169A3592014-08-12012 August 2014 Stations, Units 1 and 2, Issuance of Amendments Regarding Addition of an Analytical Methodology to the Core Operating Limits Reports and an Increase to the Surry Minimum Temperature for Criticality ML14148A2352014-07-0303 July 2014 Issuance of Amendment to Extend the Containment Type a and Type C Leak Rate Test Frequency ML13260A2502013-09-0909 September 2013 Proposed License Amendment Request Regarding Relocation of Snubber Surveillance Requirements from Technical Specifications 4.17 to Snubber Program - Supplement ML12279A2822012-09-26026 September 2012 Proposed License Amendment Request Regarding Temporary Service Water Jumper to the Component Cooling Heat Exchangers ML12222A3402012-07-31031 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML12109A2702012-04-17017 April 2012 Issuance of Amendments Regarding Virginia Electric and Power Company License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML12081A0162012-03-14014 March 2012 Supplemental Response to Request for Additional Information Related to License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML1106602302011-03-0404 March 2011 Supplemental Information &Typed TS Pages for Proposed License Amendment Request Risk-Informed Justification for Relocation of Specific Surveillance Frequency Requirement to Licensee Controlled Program (Adoption of TSTF-425, Rev 3) ML1035502062010-12-16016 December 2010 Proposed Technical Specification Change Temporary Alternate Repair Criteria for Steam Generator Tube Repair for Unit 2 ML1030502732010-11-0202 November 2010 Correction to Amendment Regarding Technical Specification Revisions Related to the Measurement Uncertainty Recapture (Mur) Power Uprate ML1027203442010-09-28028 September 2010 Attachment 2 to Email Regarding Typed Page 2.3-2 for Surry Dnbcolr LAR ML1013106042010-05-0606 May 2010 License Amendment Request Revised Cumulative Core Burnup Applicability Limit for Heatup and Cooldown Curves, Low Temperature Overpressure Protection System Setpoint, and Ltops Enable Temperature ML1001405592010-02-26026 February 2010 License Amendment, Correction of Technical Specification Table 3.7.1 Operator Action 3.b ML0929606162009-10-16016 October 2009 Proposed License Amendment Request Relocation of Core Operating Limits to the Core Operating Limits Report (COLR) and Addition of COLR References ML0910401472009-04-13013 April 2009 Proposed License Amendment Request Correction to Technical Specification Table 3.7-1 Operator Action 3.b ML0822500262008-09-17017 September 2008 Units, 1 and 2, Tech Spec Pages for Amendments 261 and 261 Regarding the Revision to Various Setting Limits and the Overtemperature T/Overpower T Time Constants ML0817506992008-07-0707 July 2008 Tech Spec Pages for Amendments 260 & 260 Regarding Control Room Habitability ML0814200442008-06-17017 June 2008 Tech Spec Pages for Amendments 259 and 259, Regarding the Increase of Maximum Service Water Temperature Limit from 95 F to 100 F ML0813401152008-05-16016 May 2008 Technical Specifications - Issuance of Exigent Amendment Regarding Interim Alternate Criteria for Steam Generator Tube Repair ML0810800442008-04-14014 April 2008 Proposed License Amendment Request, Interim Alternate Repair Criteria (Iarc) for Steam Generator (SG) Tube Repair ML0810211952008-04-11011 April 2008 Proposed License Amendment Request Revised Setting Limits and Overtemperature T/Overpower T Time Constants Response to Request for Additional Information (RAI) ML0809402872008-04-0202 April 2008 Proposed License Amendment Request Revision of Technical Specifications Design Features ML0802401202008-01-23023 January 2008 Tech Spec Pages for Amendments 258 and 257 Regarding Replacement of Main Control Room and Emergency Switchgear Room Air-Conditioning System Chilled Water Piping ML0735505992007-12-19019 December 2007 Units, 1 and 2, Tech Spec Pages for Amendments 257 and 256 Regarding Increase in Lead Rod Average Burnup Limit ML0733212712007-11-28028 November 2007 Proposed Additional Technical Specifications Change, Operable Definition Modification for Air Handling Units While in Temporary 45-day Allowed Outage Times to Perform Required Surveillances ML0732306102007-11-15015 November 2007 Technical Specifications for Surry, Units 1 and 2, Issuance of Amendments Use of Gothic Code for Recirculation Spray System Exigent Circumstances ML0729004772007-10-15015 October 2007 Technical Specifications, Revised Technical Specification Surveillance Requirement for the Inspection of the Containment Recirculation Sump (Tac Nos. MD3168 and MD3169) ML0724906142007-09-0606 September 2007 Technical Specifications, Issuance of Amendments Regarding Use of Westinghouse Best-Estimate Large Break Loss-of-Coolant (TAC Nos. MD3609 & MD3610) ML0723300982007-08-20020 August 2007 Proposed License Amendment Request Control Room Habitability Supplemental Response ML0719703012007-07-13013 July 2007 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Control Room Habitability ML0712402632007-05-0303 May 2007 Technical Specifications, Issuance of Amendments Regarding Missed Surveillance Requirements TSTF-358 (TAC Nos. MD4206 & MD4207) ML0709200372007-03-29029 March 2007 Tech Spec Pages for Amendments 251 and 250 Regarding Steam Generator Tube Integrity ML0703201782007-01-31031 January 2007 Proposed Technical Specifications Change Missed Surveillance Requirements ML0701906552007-01-19019 January 2007 Proposed License Amendment Request Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube Integrity Response to Request for Additional Information ML0630000242006-10-12012 October 2006 Tech Spec Pages for Amendments 250 and 249 Regarding Implementation of Generic Safety Issue 191 ML0627702082006-10-0303 October 2006 Proposed License Amendment Request Containment Sump Inspection Surveillance ML0622301142006-08-10010 August 2006 Technical Specifications, Issuance of Amendments Regarding Change to Exclusion Area Boundary, MC8315 & MC8316 2024-05-09
[Table view] |
Text
TABLE 4.1-1 MINIMUM FREQUENCIES FOR CHECK CALIBRATIONS AND TEST OF INSTRUMENT CHANNELS Channel Descriytion Check 'Calibrate t
- 1. Nuclear Power Range S D(1,5) Q(2) I) Against a heat balance standard, above 15% RATED POWER Q(3,5) 2) Signal at AT; bistable action (permissive, rod stop, trip)
R(4) 3) Upper and lower chambers for symmetric offset by means of the movable incore detector system
- 4) Neutron detectors may be excluded from CHANNEL CALIBRATION
- 5) The provisions of Specification 4.0.4 are not applicable
- 2. Nuclear Intermediate Range *S R(2,3) P(l) 1) Log level; bistable action (permissive, rod stop, trip)
(below P-10 setpoint) 2) Neutron detectors may be excluded from CHANNEL CALIBRATION
- 3) The provisions of Specification 4.0.4 are not applicable
- 3. Nuclear Source Range *S R(2,3) P(l) 1) Bistable action (alarm, trip)
(below P-6 setpoint) 2) Neutron detectors may be excluded fmm CHANNEL CALIBRAITON
- 3) The provisions ofSpecifcation 4.0.4 are not applicable
- 4. Reactor Coolant Temperature *S R Q(1) 1) Overtemperature AT Q(2) 2) Overpower AT Reactor Coolant Flow S R Q Pressurizer Water Level S R Q i 7. Prssurizer Pressure S R Q
- q. 7 High & Low)
Z 8. 4 KV Voltage and Frequency N.A. R Q(l) 1) Setpoint verification not required
- 9. Analog Rod Position *S(1,2) R N.A. 1) With step conters NJ 0.
(3) 2) 3)
Each six inches of rod motion when data logger is out ofservice NA. when reactor is in HOT, INTERMEDIATE OR COLD SHUTDOWN I
WA