MONTHYEARML0328705392003-10-0909 October 2003 Relief, Inservice Inspection Program Surface Examination Requirements, (TACs MC0830, MC0831, and MC0832) Project stage: Other 2003-10-09
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML22124A2412022-05-12012 May 2022 Relief Request 67 for an Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML22049A0572022-02-23023 February 2022 Relief Request 69 to Extend Inservice Inspection of Containment Tendon by Four Months Due to the Covid 19 Pandemic (EPID L 2022 Llr 0011 (Covid 19)) ML21278B0912021-10-0606 October 2021 Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (EPID L-2021-LRM-0104) (Slides) ML21228A1042021-08-12012 August 2021 RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (EPID L-2021-LLR-0050) (Email) ML21089A0102021-04-0202 April 2021 Relief Request 66 to Defer Inservice Inspection of Containment Tendon by One Year Due to Covid-19 Pandemic ML20088A5332020-03-27027 March 2020 Relief Request 65 - Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge Line Weld Overlay Examination ML19263F8752019-09-20020 September 2019 Relief Request VRR-01: Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)C3)(xi) ML19107A3722019-04-19019 April 2019 Relief Request 62 Regarding Proposed Alternative Pressurizer Heater Sleeve Repairs ML19044A6412019-02-19019 February 2019 Relief Request No. 58 for the Third 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers for Certain Class 1 and Class 2 Welds ML18285A0292018-10-19019 October 2018 Relief Request 59 for the Deferral of Reactor Vessel Beltline Region Interior Attachment Examinations ML18079A7252018-03-17017 March 2018 Relief Request 58 - Unit 2 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML18016A1722018-01-12012 January 2018 Relief Request 50 - Request for Alternative to American Society of Mechanical Engineers Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests ML17074A2092017-03-16016 March 2017 Relief Request GRR-01 to ASME Code Case OMN-20 for Third 10-Year Interval Pump and Valve Inservice Testing Program ML16172A0382016-06-23023 June 2016 Relief Request 54 to Approve an Alternative to Flaw Removal for Reactor Coolant Pump 2A Suction Pressure Instrument Nozzle, for the Third 10-Year Inservice Inspection Interval ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal ML15079A0062015-03-30030 March 2015 Relief Request 52 - Request for Approval of Alternate to Flaw Removal, Flaw Characterization and Successive Examinations, for the Remainder of Its Useful Life ML14093A4072014-04-10010 April 2014 Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval ML13091A1772013-04-12012 April 2013 Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Exam Techniques in Lieu of Radiography for Remainder of Third 10-Year Inservice Inspection Interval ML13085A2542013-04-0404 April 2013 Relief Request 49, Alternative to ASME Code, Section XI, for Reactor Vessel Head Flange Seal Leak Detection Piping, Third 10-Year Inservice Inspection Interval ML12257A1412012-09-18018 September 2012 Request for Relief to Use Subsequent Edition and Addenda of ASME Code, Section XI, for Examination Categories B-L-1, B-M-1, and C-G, for the Third 10-Year Inservice Inspection Interval ML1026700802010-10-14014 October 2010 Relief Request No. 47, from Certain ASME Code Requirements for Reactor Vessel Nozzle to Vessel Welds for Second 10-Year Inservice Inspection Interval ML1025001432010-09-21021 September 2010 Relief Request No. 45 from Certain ASME Code Class 1 Weld and Component Volumetric Exams of Reactor Vessel Outlet Nozzles for Second 10-Year Inservice Inspection Interval ML1021604872010-08-27027 August 2010 Relief Request No. RR-44, Reactor Vessel Weld Visual Examination Interval Extension for Third 10-Year Inservice Inspection Interval ML0921603982009-07-17017 July 2009 Submittal of Relief Request from the American Society of Mechanical Engineers (ASME) Code, Section XI - Relief Request No. 46 ML0917001972009-07-0202 July 2009 Relief Request No. 39, Alternative to Repair Weld Methods, ASME Code, Section XI for Remainder of Operating License ML0916304492009-06-0202 June 2009 Inservice Testing Relief Request for High Pressure Safety Injection Pump Testing - Pump Relief Request PRR-08, Revision 1 ML0905801992009-02-17017 February 2009 Relief Request 41, to Use Appendix I of ASME Code Case N-729-1 ML0830105722008-11-10010 November 2008 Relief Request Nos. 18 and 36, Proposed Alternatives for the Third Interval 10-Year Inservice Inspection Program Interval ML0825905562008-10-0202 October 2008 Relief Request No. 34 for Second 10-Year Inservice Inspection Interval ML0822506752008-07-11011 July 2008 American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative Repair Method - Relief Request No. 39 ML0817002812008-06-0606 June 2008 Request for Extension to Complete the Final Confirmatory Analysis and Validation of Containment Sump Strainers Associated with NRC GL-04-002 ML0715600082007-06-21021 June 2007 Relief Request Nos. 36 and 37 Alternatives to Weld Overlay Requirements for Inservice Inspection ML0711400332007-05-16016 May 2007 Supplement to Relief Request No. 34 Request to Extend the Second 10-Year Inservice Inspection Program Interval for Reactor Vessel Weld Examinations ML0629302082006-11-0303 November 2006 Relief Request No. 32, Risk-Informed Inservice Inspection Program ML0626401992006-10-0404 October 2006 Relief Request No. 35 Request to Extend the Second 10-Year Inservice Inspection Program Interval for Reactor Vessel Visual Examinations ML0624905132006-09-20020 September 2006 Relief, Request to Extend the Second 10-Year Inservice Inspection Program Interval ML0623003332006-09-12012 September 2006 Relief Request No. 31, Revision 1, Proposed Alternative Repair for Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles ML0615702092006-05-26026 May 2006 Additional Information to Support the Request to Extend the Second 10-Year, American Society of Mechanical Engineers Section IX, Inservice Inspection Program Interval for Reactor Vessel Weld Examinations - Relief Request No. 34 ML0610803942006-04-0707 April 2006 Relief, Request to Use a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities at PVNGS in Accordance with 10 CFR 50.55a(g)(4)(iv) ML0518901452005-06-28028 June 2005 Revision 1 to 10 CFR 50.55a(a)(3)(i) Request for Alternatives to 10 CFR 50.55a(c) Requirement to Comply with ASME Section III, Subsection NB-1120, Temperature Limits, for a Portion of the Plant Pressurizer That Was Subjected To. ML0512901232005-05-0505 May 2005 Relief, Relief Request No. 31 Proposed Alternative Repair for Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles ML0434201672004-11-24024 November 2004 Relief Request No. 25 for Palo Verde, Unit 2 - Relaxation from First Revised NRC Order EA-03-009 - Additional Analysis Information for Control Element Drive Mechanism (CEDM) Nozzles ML0432706262004-11-19019 November 2004 Palo Verde - Correction to Approval Letter for Relief Request No. 30 ML0328705392003-10-0909 October 2003 Relief, Inservice Inspection Program Surface Examination Requirements, (TACs MC0830, MC0831, and MC0832) ML0321105422003-07-30030 July 2003 Relief Request 23 Alternative to Temper Bead Welding Requirements for Inservice Inspection Program (Tac. MB8973, MB8974 and MB8975) ML0314000512003-05-15015 May 2003 CFR 50.55a Alternative Repair Request for the Second 10-Year Interval of the Inservice Inspection Program: Relief Request 23, Pressurizer Heater Sleeves ML0302902122003-01-27027 January 2003 Relief, Requirements of American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code (Code) Concerning Use of Electrical Discharge Machining (Edm), MB6439, MB6440 & MB6441 ML0302801692003-01-24024 January 2003 Mechanical Nozzle Seal Assembly Type 2 Code Replacement Request for Relief from 10 CFR 50.55a ML0235200682002-12-11011 December 2002 Resubmittal of 10 CFR 50.55a Alternative Repair Request for the Second 10-Year Interval of the Inservice Inspection Program (Relief Request 18) ML0227404992002-09-25025 September 2002 CFR 50.55a Alternative Repair Request for the Second 10-Year Interval of the Inservice Inspection Program (Relief Request 22) 2022-05-12
[Table view] Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:Safety Evaluation
MONTHYEARML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable ML22334A0702022-12-15015 December 2022 Issuance of Amendment Nos. 220, 220, and 220, to Revise Technical Specifications to Adopt TSTF-487, Relocate DNB Parameters to the COLR ML22178A0042022-08-11011 August 2022 Issuance of Amendment Nos. 219, 219, and 219, to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump Ts to Address GSI-191 Issues ML22049A0572022-02-23023 February 2022 Relief Request 69 to Extend Inservice Inspection of Containment Tendon by Four Months Due to the Covid 19 Pandemic (EPID L 2022 Llr 0011 (Covid 19)) ML21347A0032021-12-22022 December 2021 Issuance of Amendment Nos. 217, 217, and 217 Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML21307A1312021-11-17017 November 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21225A0932021-08-17017 August 2021 Ng Station, Units 1, 2,& 3 - Issuance of Amendment Nos. 216, 216, and 216 Regarding Revision to Technical Specifications to Adopt TSTF-501, Rev.1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21118B0282021-05-25025 May 2021 Letter/Se Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation ML21105A3402021-04-21021 April 2021 Issuance of Amendment Nos. 215, 215, and 215 Revision to Technical Specifications to Adopt TSTF-563, Revision 0 ML21089A0102021-04-0202 April 2021 Relief Request 66 to Defer Inservice Inspection of Containment Tendon by One Year Due to Covid-19 Pandemic ML20350B8032021-02-0808 February 2021 Issuance of Amendment Nos. 214, 214, and 214 to Make Administrative Changes to the Technical Specifications ML20216A5392020-08-0606 August 2020 Relief Request 65 for Inspection of Reactor Pressure Vessel Bottom Mounted Instrument Nozzles and Pressurizer Surge Line Weld Overlay ML20163A0372020-07-31031 July 2020 the Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 213, 213, and 213 to Revise Emergency Plan Staff Augmentation Times ML20114E3252020-04-30030 April 2020 Relief Request 64 for Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML20031C9472020-03-0404 March 2020 Nonproprietary, Issuance of Amendment Nos. 212, 212, and 212 to Revise Technical Specifications to Support the Implementation of Framatome High Thermal Performance Fuel ML20016A4582020-02-10010 February 2020 Issuance of Amendment Nos. 211, 211, 211, to Extend Implementation Date for Amendment Nos. 209, 209, and 209 Associated W/Initiative 4b That Permit the Use of Risk-Informed Completion Times on the TS ML19309F3042019-12-18018 December 2019 Issuance of Amendment Nos. 210, 210, and 210, to Revise Technical Specifications to Adopt Traveler TSTF-529, Revision 4,Clarify Use and Application ML19304C5622019-11-0505 November 2019 Safety Evaluation - Arizona Public Service Company - Palo Verde Nuclear Generating Station - License Amendment Request to Adopt TSTF-529 ML19085A5252019-05-29029 May 2019 Issuance of Amendments Nos. 209, 209, and 209 - Regarding Adoption of Risk Informed Completion Times in Technical Specifications (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) ML19107A3722019-04-19019 April 2019 Relief Request 62 Regarding Proposed Alternative Pressurizer Heater Sleeve Repairs ML19070A2182019-04-0303 April 2019 Issuance of Amendment Nos. 208, 208, and 208 - Regarding Response Time Testing of Pressure Transmitters ML19044A6412019-02-19019 February 2019 Relief Request No. 58 for the Third 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers for Certain Class 1 and Class 2 Welds ML19037A0552019-02-19019 February 2019 Relief Requests 60 & 61 for the Fourth 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers Half-Nozzle Repairs (EPID L-2018-LLR-0111 & EPID L-2018-LLR-0112) ML18285A0292018-10-19019 October 2018 Relief Request 59 for the Deferral of Reactor Vessel Beltline Region Interior Attachment Examinations ML18243A2802018-10-10010 October 2018 Issuance of Amendment Nos. 207, 207, and 207 to Adopt 10 CFR 50.69 (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) ML17254A4992017-09-27027 September 2017 Issuance of Amendment Nos. 204, 204, and 204 to Modify the Completion Date for Implementation of Milestone 8 of the Cyber Security Plan ML17188A4122017-07-28028 July 2017 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Issuance of Amendment Nos. 203, 203, and 203 to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis (CAC Nos. MF7138, MF7139, and MF7140) ML17123A4352017-05-16016 May 2017 Issuance of Amendment Nos. 202, 202, and 202 to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML17090A1642017-04-27027 April 2017 Issuance of Amendment No. 201, 201, and 201 to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay Modifications ML17074A2092017-03-16016 March 2017 Relief Request GRR-01 to ASME Code Case OMN-20 for Third 10-Year Interval Pump and Valve Inservice Testing Program ML17004A0202017-01-0404 January 2017 Issuance of Amendment No. 200, Revise Technical Specification 3.8.1, AC Sources - Operating, for One-Time Extension of the Diesel Generator Completion Time, Risk-Informed (Emergency Circumstances) ML17003A0832017-01-0303 January 2017 Safety Evaluation Input Regarding Changes to Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML17004A2092017-01-0303 January 2017 Safety Evaluation Input for Palo Verde Nuclear Generating Station, Unit 3, Llcense Amendment Request for a One-Time Extension of the 3B Emergency Diesel Generator Completion Time ML17003A3892017-01-0303 January 2017 Safety Evaluation Input Regarding the Palo Verde Nuclear Generating Station Unit 3 Emergency Request to Extend Diesel Generator 3B Completion Time ML16358A4152016-12-23023 December 2016 Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML16358A6762016-12-23023 December 2016 Issuance of Amendment No. 199, Request for One-Time Extension of the Diesel Generator Completion Time (Emergency Circumstances) ML16180A1092016-09-0808 September 2016 Issuance of Amendment Nos. 198, 198, and 198, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. ML16194A3232016-07-22022 July 2016 Review and Approval of Request for Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 11-04A, Nuclear Generation Quality Assurance Program Description ML16088A2612016-07-20020 July 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16172A0382016-06-23023 June 2016 Relief Request 54 to Approve an Alternative to Flaw Removal for Reactor Coolant Pump 2A Suction Pressure Instrument Nozzle, for the Third 10-Year Inservice Inspection Interval ML16004A0132016-02-19019 February 2016 Issuance of Amendment No. 197, 197, and 197, Adopt Technical Specification Task Force Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML15266A0052015-09-25025 September 2015 Issuance of Amendment No. 196, Revise Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 (Exigent Circumstances) ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal ML15070A1242015-03-30030 March 2015 Issuance of Amendment Nos. 195, 195, and 195, Adopt TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) and TSTF-406, Revision 2 ML15079A0062015-03-30030 March 2015 Relief Request 52 - Request for Approval of Alternate to Flaw Removal, Flaw Characterization and Successive Examinations, for the Remainder of Its Useful Life ML15058A0292015-03-27027 March 2015 Staff Assessment Regarding Review of Pressurized-Water Reactor Vessel Internals Aging Management Program Plan ML14202A3782014-09-0909 September 2014 Issuance of Amendment Nos. 194, 194, and 194, Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip (TAC Nos. MF2879-81) ML14115A0452014-06-25025 June 2014 Issuance of Amendment Nos. 193, 193, and 193, Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML14093A4072014-04-10010 April 2014 Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval 2023-09-13
[Table view] |
Text
October 9, 2003 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
RELIEF REQUEST NO. 23, REVISION 1: ALTERNATIVE TO INSERVICE INSPECTION PROGRAM SURFACE EXAMINATION REQUIREMENTS (TAC NOS. MC0830, MC0831 AND MC0832)
Dear Mr. Overbeck:
By letter dated September 16, 2003, as supplemented by letter dated September 26, 2003, you submitted Revision 1 to Relief Request No. 23, requesting relief from requirements in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (the ASME Code) for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. In your request, you proposed an alternative to the surface examination requirements of ASME Code Section XI Section IWA-4533. In your request, you propose to be able to use the magnetic particle technique as an alternative to the liquid penetrant technique specified in Section IWA-4533 to conduct surface examinations of the preheated band area related to the pressurizer heater sleeve repair effort.
Based on the enclosed Safety Evaluation, the NRC staff concludes that the proposed alternative provides an acceptable level of quality and safety. Therefore, pursuant to Section 10 CFR 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations, the NRC staff authorizes the proposed alternative in Relief Request 23, Revision 1, to the surface examination requirements of ASME Code Section XI Section IWA-4533 at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 for the second 10-year inservice inspection interval.
Sincerely,
/RA/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529, and STN 50-530
Enclosure:
Safety Evaluation cc w/encl: See next page
October 9, 2003 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
RELIEF REQUEST NO. 23, REVISION 1: ALTERNATIVE TO INSERVICE INSPECTION PROGRAM SURFACE EXAMINATION REQUIREMENTS (TAC NOS. MC0830, MC0831 AND MC0832)
Dear Mr. Overbeck:
By letter dated September 16, 2003, as supplemented by letter dated September 26, 2003, you submitted Revision 1 to Relief Request No. 23, requesting relief from requirements in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (the ASME Code) for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3. In your request, you proposed an alternative to the surface examination requirements of ASME Code Section XI Section IWA-4533. In your request, you propose to be able to use the magnetic particle technique in addition to the liquid penetrant technique specified in Section IWA-4533 to conduct surface examinations of the preheated band area related to the pressurizer heater sleeve repair effort.
Based on the enclosed Safety Evaluation, the NRC staff concludes that the proposed alternative provides an acceptable level of quality and safety. Therefore, pursuant to Section 10 CFR 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations, the NRC staff authorizes the proposed alternative in Relief Request 23, Revision 1, to the surface examination requirements of ASME Code Section XI Section IWA-4533 at the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 for the second 10-year inservice inspection interval.
Sincerely,
/RA/
Stephen Dembek, Chief, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation DISTRIBUTION Docket Nos. STN 50-528, STN 50-529, PUBLIC SCoffin and STN 50-530 PDIV-2 r/f GCheruvenki RidsNrrDlpmLpdiv (HBerkow) GHill (6)
Enclosure:
Safety Evaluation RidsNrrPMMFields JClark, EDO RidsNrrLAMMcAllister TChan cc w/encl: See next page RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn4MailCenter (LSmith)
ACCESSION NO: ML032870539 *For previous concurrence, see attached ORC
- No legal objection with changes OFFICE PDIV-2/PM PDIV-1/LA EMCB/SC* OGC** PDIV-2/SC NAME MFields:sp MMcAllister SCoffin SUttal SDembek DATE 10/2/03 10/2/03 10/02/03 10/10/03 10/9/03 OFFICIAL RECORD COPY
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION INSERVICE INSPECTION PROGRAM RELIEF REQUEST NO. 23, REVISION 1 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530
1.0 INTRODUCTION
The Inservice Inspection (ISI) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Class 1, 2, and 3 components is to be performed in accordance with Section XI of the ASME Code and applicable edition and addenda as required by 10 CFR 50.55a(g), except where specific relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). Section 10 CFR 50.55a(a)(3) of Title 10 of the Code of Federal Regulations (10 CFR), states in part that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if the licensee demonstrates that: (i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) will meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The ISI code of record for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 second 10-year ISI interval is the 1992 Edition, 1992 Addenda of Section XI of the ASME Code.
By letter dated September 16, 2003, as supplemented by letter dated September 26, 2003, Arizona Public Service (APS or the licensee) submitted Revision 1 to Relief Request No. 23, requesting relief from requirements in the ASME Code for the Palo Verde units. The licensee proposed an alternative to the surface examination requirements of ASME Code Section XI Section IWA-4533. Specifically, the licensee proposes to be able to use the magnetic particle technique as an alternative to the liquid penetrant technique specified in Section IWA-4533 to conduct surface examinations of the preheated band area related to the pressurizer heater sleeve repair effort.
2.0 INSERVICE INSPECTION PROGRAM RELIEF REQUEST 23, REVISION 1, ALTERNATIVE TO ISI SURFACE EXAMINATION REQUIREMENTS 2.1 ASME Code Component Affected System: Reactor Coolant Component: Pressurizer Code Class: 1 2.2 Code Requirements for which Relief is Requested As stated by the licensee in Section III of the enclosure to its letter dated September 16, 2003:
Section XI, 1992 Edition, 1992 Addenda, IWA-4533 states that the weld repair as well as the preheated band shall be examined by the liquid penetrant method after the completed weld has been at ambient temperature for at least 48 hr.
2.3 Licensees Proposed Alternative to Code As stated by the licensee in Section IV of the enclosure to its letter dated September 16, 2003:
Pursuant to 10 CFR 50.55a(a)(3)(i), APS proposes alternatives to the requirements of IWA-4533 of ASME Section XI. Specifically, APS is requesting to have the option to use an alternate surface examination, such as magnetic particle (MT), for the examination of the preheated band area instead of being required to use the liquid penetrant (PT) examination.
2.4 Licensees Basis for Relief As stated by the licensee in Section V of the enclosure to its letter dated September 16, 2003:
IWA-4533 specifically requires a PT examination of the preheated band. An MT examination is preferred by APS for the proposed application due to time and dose considerations. Liquid penetrant requires several steps: cleaning and surface preparation, drying, application of the penetrant, dwell time of the penetrant, cleaning of the penetrant, drying, application of the developer, developing time, reading the results, and post cleaning. Magnetic Particle examination can be performed on the as-found surface in a one-step process with immediate results and minimal post examination cleaning. As an example of the alternative requested, Code Case N-638 allows the final weld surface and the band around the weld surface to be examined using surface and ultrasonic methods and does not specify what type of surface exam should be performed.
A change to the previously approved alternative (ultrasonic examination of the pad build-up) in lieu of the IWA-4533 required radiographic examination is not being requested.
Since the pressurizer head is manufactured from low alloy carbon steel, it can be effectively examined using MT methods. Magnetic particle testing is an effective
surface examination for low alloy carbon steel. Penetrant testing will locate defects which are open to the surface. However, not only does MT require fewer steps and less surface preparation, it also provides surface and sub surface flaw detection. A reduction in dose could be realized by using MT verses PT in the post weld examination process, since the MT process can be performed in less time than the PT process.
The licensee clarified in its supplemental letter dated September 26, 2003, that the alternative examination proposed (the magnetic particle method) would be limited to the surface examination of the preheated band area of the pressurizer (P3 material). All other required post weld repair examinations would be performed in accordance with ASME Code requirements (i.e., the required liquid penetrant examination of the final weld surface will be performed in accordance with paragraph IWA-4533 of ASME Section XI).
3.0 STAFF EVALUATION According to ASME Section XI, both magnetic particle examination and liquid penetrant examination techniques are classified as effective surface examination techniques. Although IWA-4533 states that the weld repair as well as the preheated band shall be examined by the liquid penetrant method, the intent of this paragraph is to ensure, through a qualified surface examination technique, that clean sound metal is present which is essential for maintaining structural integrity. The reason that only the liquid penetrant technique was referred to in this code requirement is because non-ferritic weld material is used for weld repairs of dissimilar materials, and this type of weld material cannot be effectively examined with the magnetic particle method. The preheated band that is the subject of this relief request is the section of the pressurizer that immediately surrounds the weld repair, which is made of low alloy steel.
The staff agrees with the licensee that magnetic particle examination is an effective surface examination for carbon and low alloy steel base materials. Magnetic particle examination has the capabilities of delineating surface and subsurface indications. The liquid penetrant examination can only identify indications that are open to the surface.
Therefore, the staff finds that the proposed alternative to the requirements of IWA-4533 of ASME Section XI provides an acceptable level of quality and safety. Specifically, the staff finds acceptable the licensees request to have the option to use the magnetic particle method for the examination of the preheated band area, instead of being required to use the liquid penetrant examination. The final examination of the weld pad build-up surface (which is not a magnetic material) on the pressurizer, shall be performed using liquid penetrant method in accordance with the stated requirements of IWA-4533.
While not directly related to the staffs finding that the proposed alternative provides an acceptable level of quality and safety, the magnetic particle examination technique can be performed in less time than the liquid penetrant examination. This will result in lower radiation doses to the individuals performing the surface examinations, which is consistent with 10 CFR 20.1101(b) principles, to achieve occupational doses that are as low as is reasonably achievable.
4.0 CONCLUSION
The NRC staff concludes that the licensees proposed alternative, to be able to use the magnetic particle technique to conduct surface examinations of the preheated band area related to the pressurizer heater sleeve repair effort, provides an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the use of the magnetic particle technique for this specific application only, at the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 for the second 10-year ISI interval. Granting this alternative does not preclude the licensee from examining the preheated band area using the liquid penetrant technique specified in ASME Code Section IWA-4533.
All other requirements of the ASME Code,Section III and XI for which relief has not been specifically requested and approved remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: G. Cheruvenki Date: October 9, 2003
Palo Verde Generating Station, Units 1, 2, and 3 cc:
Mr. Steve Olea Mr. John Taylor Arizona Corporation Commission Public Service Company of New Mexico 1200 W. Washington Street 2401 Aztec NE, MS Z110 Phoenix, AZ 85007 Albuquerque, NM 87107-4224 Douglas Kent Porter Ms. Cheryl Adams Senior Counsel Southern California Edison Company Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN Law Department, Generation Resources San Clemente, CA 92672 P.O. Box 800 Rosemead, CA 91770 Mr. Robert Henry Salt River Project Senior Resident Inspector 6504 East Thomas Road U.S. Nuclear Regulatory Commission Scottsdale, AZ 85251 P. O. Box 40 Buckeye, AZ 85326 Terry Bassham, Esq.
General Counsel Regional Administrator, Region IV El Paso Electric Company U.S. Nuclear Regulatory Commission 123 W. Mills Harris Tower & Pavillion El Paso, TX 79901 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. John Schumann Los Angeles Department of Water & Power Chairman Southern California Public Power Authority Maricopa County Board of Supervisors P.O. Box 51111, Room 1255-C 301 W. Jefferson, 10th Floor Los Angeles, CA 90051-0100 Phoenix, AZ 85003 Brian Almon Mr. Aubrey V. Godwin, Director Public Utility Commission Arizona Radiation Regulatory Agency William B. Travis Building 4814 South 40 Street P. O. Box 13326 Phoenix, AZ 85040 1701 North Congress Avenue Austin, TX 78701-3326 Mr. Craig K. Seaman, Director Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 2702 N. Third Street, Suite 3040 Phoenix, AZ 85004 July 2003