Letter Sequence Other |
---|
|
|
MONTHYEARML0432402132004-11-19019 November 2004 Relief Request No. 30 American Society of Mechanical Engineers Section III Boiler & Pressure Vessel Code Case 1361-2 Parameter Project stage: Other ML0432706262004-11-19019 November 2004 Palo Verde - Correction to Approval Letter for Relief Request No. 30 Project stage: Other 2004-11-19
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML24297A6212024-10-22022 October 2024 Request for Additional Information Relief Request (RR) No. 72: Re-Submittal of RR-39/ASME Code X1 IWC-3420, IWA-3300 ML22124A2412022-05-12012 May 2022 Relief Request 67 for an Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML22049A0572022-02-23023 February 2022 Relief Request 69 to Extend Inservice Inspection of Containment Tendon by Four Months Due to the Covid 19 Pandemic (EPID L 2022 Llr 0011 (Covid 19)) ML21278B0912021-10-0606 October 2021 Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (EPID L-2021-LRM-0104) (Slides) ML21228A1042021-08-12012 August 2021 RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (EPID L-2021-LLR-0050) (Email) ML21089A0102021-04-0202 April 2021 Relief Request 66 to Defer Inservice Inspection of Containment Tendon by One Year Due to Covid-19 Pandemic ML20088A5332020-03-27027 March 2020 Relief Request 65 - Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge Line Weld Overlay Examination ML19263F8752019-09-20020 September 2019 Relief Request VRR-01: Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)C3)(xi) ML19107A3722019-04-19019 April 2019 Relief Request 62 Regarding Proposed Alternative Pressurizer Heater Sleeve Repairs ML19044A6412019-02-19019 February 2019 Relief Request No. 58 for the Third 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers for Certain Class 1 and Class 2 Welds ML18285A0292018-10-19019 October 2018 Relief Request 59 for the Deferral of Reactor Vessel Beltline Region Interior Attachment Examinations ML18079A7252018-03-17017 March 2018 Relief Request 58 - Unit 2 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML18016A1722018-01-12012 January 2018 Relief Request 50 - Request for Alternative to American Society of Mechanical Engineers Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests ML17074A2092017-03-16016 March 2017 Relief Request GRR-01 to ASME Code Case OMN-20 for Third 10-Year Interval Pump and Valve Inservice Testing Program ML16172A0382016-06-23023 June 2016 Relief Request 54 to Approve an Alternative to Flaw Removal for Reactor Coolant Pump 2A Suction Pressure Instrument Nozzle, for the Third 10-Year Inservice Inspection Interval ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal ML15079A0062015-03-30030 March 2015 Relief Request 52 - Request for Approval of Alternate to Flaw Removal, Flaw Characterization and Successive Examinations, for the Remainder of Its Useful Life ML14093A4072014-04-10010 April 2014 Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval ML13091A1772013-04-12012 April 2013 Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Exam Techniques in Lieu of Radiography for Remainder of Third 10-Year Inservice Inspection Interval ML13085A2542013-04-0404 April 2013 Relief Request 49, Alternative to ASME Code, Section XI, for Reactor Vessel Head Flange Seal Leak Detection Piping, Third 10-Year Inservice Inspection Interval ML12257A1412012-09-18018 September 2012 Request for Relief to Use Subsequent Edition and Addenda of ASME Code, Section XI, for Examination Categories B-L-1, B-M-1, and C-G, for the Third 10-Year Inservice Inspection Interval ML1026700802010-10-14014 October 2010 Relief Request No. 47, from Certain ASME Code Requirements for Reactor Vessel Nozzle to Vessel Welds for Second 10-Year Inservice Inspection Interval ML1025001432010-09-21021 September 2010 Relief Request No. 45 from Certain ASME Code Class 1 Weld and Component Volumetric Exams of Reactor Vessel Outlet Nozzles for Second 10-Year Inservice Inspection Interval ML1021604872010-08-27027 August 2010 Relief Request No. RR-44, Reactor Vessel Weld Visual Examination Interval Extension for Third 10-Year Inservice Inspection Interval ML0921603982009-07-17017 July 2009 Submittal of Relief Request from the American Society of Mechanical Engineers (ASME) Code, Section XI - Relief Request No. 46 ML0917001972009-07-0202 July 2009 Relief Request No. 39, Alternative to Repair Weld Methods, ASME Code, Section XI for Remainder of Operating License ML0916304492009-06-0202 June 2009 Inservice Testing Relief Request for High Pressure Safety Injection Pump Testing - Pump Relief Request PRR-08, Revision 1 ML0905801992009-02-17017 February 2009 Relief Request 41, to Use Appendix I of ASME Code Case N-729-1 ML0830105722008-11-10010 November 2008 Relief Request Nos. 18 and 36, Proposed Alternatives for the Third Interval 10-Year Inservice Inspection Program Interval ML0825905562008-10-0202 October 2008 Relief Request No. 34 for Second 10-Year Inservice Inspection Interval ML0822506752008-07-11011 July 2008 American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative Repair Method - Relief Request No. 39 ML0817002812008-06-0606 June 2008 Request for Extension to Complete the Final Confirmatory Analysis and Validation of Containment Sump Strainers Associated with NRC GL-04-002 ML0715600082007-06-21021 June 2007 Relief Request Nos. 36 and 37 Alternatives to Weld Overlay Requirements for Inservice Inspection ML0711400332007-05-16016 May 2007 Supplement to Relief Request No. 34 Request to Extend the Second 10-Year Inservice Inspection Program Interval for Reactor Vessel Weld Examinations ML0629302082006-11-0303 November 2006 Relief Request No. 32, Risk-Informed Inservice Inspection Program ML0626401992006-10-0404 October 2006 Relief Request No. 35 Request to Extend the Second 10-Year Inservice Inspection Program Interval for Reactor Vessel Visual Examinations ML0624905132006-09-20020 September 2006 Relief, Request to Extend the Second 10-Year Inservice Inspection Program Interval ML0623003332006-09-12012 September 2006 Relief Request No. 31, Revision 1, Proposed Alternative Repair for Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles ML0615702092006-05-26026 May 2006 Additional Information to Support the Request to Extend the Second 10-Year, American Society of Mechanical Engineers Section IX, Inservice Inspection Program Interval for Reactor Vessel Weld Examinations - Relief Request No. 34 ML0610803942006-04-0707 April 2006 Relief, Request to Use a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities at PVNGS in Accordance with 10 CFR 50.55a(g)(4)(iv) ML0518901452005-06-28028 June 2005 Revision 1 to 10 CFR 50.55a(a)(3)(i) Request for Alternatives to 10 CFR 50.55a(c) Requirement to Comply with ASME Section III, Subsection NB-1120, Temperature Limits, for a Portion of the Plant Pressurizer That Was Subjected To. ML0512901232005-05-0505 May 2005 Relief, Relief Request No. 31 Proposed Alternative Repair for Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles ML0434201672004-11-24024 November 2004 Relief Request No. 25 for Palo Verde, Unit 2 - Relaxation from First Revised NRC Order EA-03-009 - Additional Analysis Information for Control Element Drive Mechanism (CEDM) Nozzles ML0432706262004-11-19019 November 2004 Palo Verde - Correction to Approval Letter for Relief Request No. 30 ML0328705392003-10-0909 October 2003 Relief, Inservice Inspection Program Surface Examination Requirements, (TACs MC0830, MC0831, and MC0832) ML0321105422003-07-30030 July 2003 Relief Request 23 Alternative to Temper Bead Welding Requirements for Inservice Inspection Program (Tac. MB8973, MB8974 and MB8975) ML0314000512003-05-15015 May 2003 CFR 50.55a Alternative Repair Request for the Second 10-Year Interval of the Inservice Inspection Program: Relief Request 23, Pressurizer Heater Sleeves ML0302902122003-01-27027 January 2003 Relief, Requirements of American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code (Code) Concerning Use of Electrical Discharge Machining (Edm), MB6439, MB6440 & MB6441 ML0302801692003-01-24024 January 2003 Mechanical Nozzle Seal Assembly Type 2 Code Replacement Request for Relief from 10 CFR 50.55a ML0235200682002-12-11011 December 2002 Resubmittal of 10 CFR 50.55a Alternative Repair Request for the Second 10-Year Interval of the Inservice Inspection Program (Relief Request 18) 2024-10-22
[Table view] Category:Letter
MONTHYEARML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML24157A3392024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium ML24144A2772024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 and Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24089A1892024-03-28028 March 2024 Present Levels of Financial Protection ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML24066A0472024-03-0606 March 2024 Response to Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown and TS IR 05000528/20240122024-03-0404 March 2024 Age-Related Degradation Inspection Report 05000528/2024012, 05000529/2024012 and 05000530/2024012 IR 05000528/20230062024-02-28028 February 2024 Annual Assessment Letter for Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Report 05000528/2023006 and 05000529/2023006 and 05000530/2023006 ML24053A3972024-02-22022 February 2024 License Renewal - Alloy 600 Management Program Plan ML24047A3632024-02-16016 February 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX177, AMZDFX178, AMZDFX179 Vertical Concrete Cask Identification No. AMZDNE179, AMZDNE178 2024-09-27
[Table view] Category:Safety Evaluation
MONTHYEARML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable ML22334A0702022-12-15015 December 2022 Issuance of Amendment Nos. 220, 220, and 220, to Revise Technical Specifications to Adopt TSTF-487, Relocate DNB Parameters to the COLR ML22178A0042022-08-11011 August 2022 Issuance of Amendment Nos. 219, 219, and 219, to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump Ts to Address GSI-191 Issues ML22049A0572022-02-23023 February 2022 Relief Request 69 to Extend Inservice Inspection of Containment Tendon by Four Months Due to the Covid 19 Pandemic (EPID L 2022 Llr 0011 (Covid 19)) ML21347A0032021-12-22022 December 2021 Issuance of Amendment Nos. 217, 217, and 217 Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML21307A1312021-11-17017 November 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21225A0932021-08-17017 August 2021 Ng Station, Units 1, 2,& 3 - Issuance of Amendment Nos. 216, 216, and 216 Regarding Revision to Technical Specifications to Adopt TSTF-501, Rev.1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21118B0282021-05-25025 May 2021 Letter/Se Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation ML21105A3402021-04-21021 April 2021 Issuance of Amendment Nos. 215, 215, and 215 Revision to Technical Specifications to Adopt TSTF-563, Revision 0 ML21089A0102021-04-0202 April 2021 Relief Request 66 to Defer Inservice Inspection of Containment Tendon by One Year Due to Covid-19 Pandemic ML20350B8032021-02-0808 February 2021 Issuance of Amendment Nos. 214, 214, and 214 to Make Administrative Changes to the Technical Specifications ML20216A5392020-08-0606 August 2020 Relief Request 65 for Inspection of Reactor Pressure Vessel Bottom Mounted Instrument Nozzles and Pressurizer Surge Line Weld Overlay ML20163A0372020-07-31031 July 2020 the Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 213, 213, and 213 to Revise Emergency Plan Staff Augmentation Times ML20114E3252020-04-30030 April 2020 Relief Request 64 for Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML20031C9472020-03-0404 March 2020 Nonproprietary, Issuance of Amendment Nos. 212, 212, and 212 to Revise Technical Specifications to Support the Implementation of Framatome High Thermal Performance Fuel ML20016A4582020-02-10010 February 2020 Issuance of Amendment Nos. 211, 211, 211, to Extend Implementation Date for Amendment Nos. 209, 209, and 209 Associated W/Initiative 4b That Permit the Use of Risk-Informed Completion Times on the TS ML19309F3042019-12-18018 December 2019 Issuance of Amendment Nos. 210, 210, and 210, to Revise Technical Specifications to Adopt Traveler TSTF-529, Revision 4,Clarify Use and Application ML19304C5622019-11-0505 November 2019 Safety Evaluation - Arizona Public Service Company - Palo Verde Nuclear Generating Station - License Amendment Request to Adopt TSTF-529 ML19085A5252019-05-29029 May 2019 Issuance of Amendments Nos. 209, 209, and 209 - Regarding Adoption of Risk Informed Completion Times in Technical Specifications (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) ML19107A3722019-04-19019 April 2019 Relief Request 62 Regarding Proposed Alternative Pressurizer Heater Sleeve Repairs ML19070A2182019-04-0303 April 2019 Issuance of Amendment Nos. 208, 208, and 208 - Regarding Response Time Testing of Pressure Transmitters ML19044A6412019-02-19019 February 2019 Relief Request No. 58 for the Third 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers for Certain Class 1 and Class 2 Welds ML19037A0552019-02-19019 February 2019 Relief Requests 60 & 61 for the Fourth 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers Half-Nozzle Repairs (EPID L-2018-LLR-0111 & EPID L-2018-LLR-0112) ML18285A0292018-10-19019 October 2018 Relief Request 59 for the Deferral of Reactor Vessel Beltline Region Interior Attachment Examinations ML18243A2802018-10-10010 October 2018 Issuance of Amendment Nos. 207, 207, and 207 to Adopt 10 CFR 50.69 (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) ML17254A4992017-09-27027 September 2017 Issuance of Amendment Nos. 204, 204, and 204 to Modify the Completion Date for Implementation of Milestone 8 of the Cyber Security Plan ML17188A4122017-07-28028 July 2017 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Issuance of Amendment Nos. 203, 203, and 203 to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis (CAC Nos. MF7138, MF7139, and MF7140) ML17123A4352017-05-16016 May 2017 Issuance of Amendment Nos. 202, 202, and 202 to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML17090A1642017-04-27027 April 2017 Issuance of Amendment No. 201, 201, and 201 to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay Modifications ML17074A2092017-03-16016 March 2017 Relief Request GRR-01 to ASME Code Case OMN-20 for Third 10-Year Interval Pump and Valve Inservice Testing Program ML17004A0202017-01-0404 January 2017 Issuance of Amendment No. 200, Revise Technical Specification 3.8.1, AC Sources - Operating, for One-Time Extension of the Diesel Generator Completion Time, Risk-Informed (Emergency Circumstances) ML17004A2092017-01-0303 January 2017 Safety Evaluation Input for Palo Verde Nuclear Generating Station, Unit 3, Llcense Amendment Request for a One-Time Extension of the 3B Emergency Diesel Generator Completion Time ML17003A0832017-01-0303 January 2017 Safety Evaluation Input Regarding Changes to Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML17003A3892017-01-0303 January 2017 Safety Evaluation Input Regarding the Palo Verde Nuclear Generating Station Unit 3 Emergency Request to Extend Diesel Generator 3B Completion Time ML16358A4152016-12-23023 December 2016 Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML16358A6762016-12-23023 December 2016 Issuance of Amendment No. 199, Request for One-Time Extension of the Diesel Generator Completion Time (Emergency Circumstances) ML16180A1092016-09-0808 September 2016 Issuance of Amendment Nos. 198, 198, and 198, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. ML16194A3232016-07-22022 July 2016 Review and Approval of Request for Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 11-04A, Nuclear Generation Quality Assurance Program Description ML16088A2612016-07-20020 July 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16172A0382016-06-23023 June 2016 Relief Request 54 to Approve an Alternative to Flaw Removal for Reactor Coolant Pump 2A Suction Pressure Instrument Nozzle, for the Third 10-Year Inservice Inspection Interval ML16004A0132016-02-19019 February 2016 Issuance of Amendment No. 197, 197, and 197, Adopt Technical Specification Task Force Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML15266A0052015-09-25025 September 2015 Issuance of Amendment No. 196, Revise Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 (Exigent Circumstances) ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal ML15070A1242015-03-30030 March 2015 Issuance of Amendment Nos. 195, 195, and 195, Adopt TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) and TSTF-406, Revision 2 ML15079A0062015-03-30030 March 2015 Relief Request 52 - Request for Approval of Alternate to Flaw Removal, Flaw Characterization and Successive Examinations, for the Remainder of Its Useful Life 2024-08-20
[Table view] |
Text
November 19, 2004 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
CORRECTION TO APPROVAL LETTER FOR RELIEF REQUEST NO. 30 (TAC NOS. MC5080, MC5081, AND MC5082)
Dear Mr. Overbeck:
On November 19, 2004, the Commission issued its approval letter for Relief Request No. 30, requested by Arizona Public Service Company in its letter dated November 11, 2004. The approval was for an alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case 1361-2, "Socket Welds,Section III," to allow a slightly larger diametral clearance between the replacement pressurizer heater sleeves and the heater sheaths.
Based on conversations with your staff, we are re-issuing the first two pages of the safety evaluation to remove references to mid-wall weld repairs associated with the pressurizer half-sleeve repairs activities. The areas of change are indicated by marginal lines. These references were related to the background discussion of the repair activities, and were not germane to the staff<s decision to approve the relief request. We apologize for any inconvenience this may have caused.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529 and STN 50-530
Enclosure:
Safety Evaluation (Pages 1 and 2) cc w/encl: See next page
November 19, 2004 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
CORRECTION TO APPROVAL LETTER FOR RELIEF REQUEST NO. 30 (TAC NOS. MC5080, MC5081, AND MC5082)
Dear Mr. Overbeck:
On November 19, 2004, the Commission issued its approval letter for Relief Request No. 30, requested by Arizona Public Service Company in its letter dated November 11, 2004. The approval was for an alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case 1361-2, "Socket Welds,Section III," to allow a slightly larger diametral clearance between the replacement pressurizer heater sleeves and the heater sheaths.
Based on conversations with your staff, we are re-issuing the first two pages of the safety evaluation to remove references to mid-wall weld repairs associated with the pressurizer half-sleeve repairs activities. The areas of change are indicated by marginal lines. These references were related to the background discussion of the repair activities, and were not germane to the staff<s decision to approve the relief request. We apologize for any inconvenience this may have caused.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-528, STN 50-529 and STN 50-530
Enclosure:
Safety Evaluation (Pages 1 and 2) cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrPMMFields GHill (6)
PDIV-2 r/f RidsNrrLADBaxley KManoly RidsNrrLpdivHBerkow RidsOgcRp JFair RidsNrrLpdiv2RGramm RidsAcrsAcnwMailCenter JDixon-Herrity, EDO RidsRgn4MailCenter (SSchwind)
ACCESSION NO: ML043270626 Nrr-028 OFFICE PDIV-2/PM PDIV-1/LA PDIV-2/SC NAME MFields DBaxley RGramm DATE 11/19/04 11/19/04 11/19/04 OFFICIAL RECORD COPY
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION INSERVICE INSPECTION PROGRAM RELIEF REQUEST NO. 30 ARIZONA PUBLIC SERVICE COMPANY, ET AL.
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 DOCKET NOS. STN 50-528, STN 50-529, AND STN 50-530
1.0 INTRODUCTION
By letter dated November 11, 2004, Arizona Public Service Company (APS or the licensee) submitted Relief Request No. 30, requesting NRC approval of an alternative to an American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Case requirement for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3. The request for relief is from Code Case 1361-2, "Socket Welds,Section III," to allow a slightly larger diametral clearance between the replacement pressurizer heater sleeves and the heater sheaths. This request is associated with the pressurizer half-sleeve weld repairs at all three l units. These repairs were completed for Unit 2 during its fall 2003 refueling outage, are ongoing during the fall 2004 refueling outage for Unit 3, and are scheduled for the fall 2005 refueling outage for Unit 1. The relief is requested for the remainder of plant life at the three units.
2.0 BACKGROUND
The pressurizer lower head, to which the heater sleeves are attached, is manufactured from SA-533, Grade B, Class 1 low alloy steel. The pressurizer in each unit has 36 heater sleeves.
Each sleeve is a tube having nominal 1.66 inch outside diameter and 0.192 inch wall thickness, and is attached to the lower pressurizer head by a partial penetration weld (J-groove weld) made at the pressurizer inside surface. The original sleeves are made from Alloy 600 material, a nickel-based alloy, which has been found to be susceptible to primary water stress corrosion cracking (PWSCC). The attachment weld is made with Alloy 82/182 material which is a nickel-based alloy and is susceptible to PWSCC also. There is an overlay on the inside surface of the pressurizer at the intersection of the sleeve and penetration to reinforce the pressurizer wall.
The heater is inserted into the sleeve and is welded (fillet weld) to the sleeve.
Replacement of these sleeves by excavating the original attachment weld and then re-welding new full-length sleeves is not practical due to inaccessibility of the pressurizer vessel internal surface and high radiation field associated with the pressurizer. Therefore, APS proposes the half-sleeve replacement method. The lower half of the original sleeve is removed in two independent steps. First, the original sleeve is cut approximately 1 inch below the bottom surface of the pressurizer using a grinder. Second, the sleeve is severed within the penetration, approximately mid-wall, using a circular cutting disk, and is then removed. The l half-length replacement Alloy 690 sleeve is then inserted into the penetration by slip fit. The top l
half of the original sleeve and associated attachment weld will remain in service. There will be l a gap between the original half-sleeve and the new half-sleeve in the penetration.
APS stated that the Palo Verde, Unit 1, pressurizer sleeves have not had any repairs; however, as a preventive measure, APS will perform half-sleeve replacement on all 36 heater sleeves in Palo Verde, Unit 1, in the fall of 2005. The Palo Verde, Unit 2, pressurizer sleeves have been repaired using the half-sleeve replacement method and no additional repairs are necessary.
APS will perform half-sleeve replacement on all 36 heater sleeves in Palo Verde, Unit 3, in the fall of 2004.
The Palo Verde, Unit 2, heater sleeve replacement project (fall 2003) identified challenges in sleeve alignment and subsequent installation of heaters. As a result, a significantly longer duration than originally projected was required for sleeve welding. In an attempt to resolve the heater insertion challenges, APS increased the inside diameter of the replacement sleeve from 1.273 inch to 1.300 inch. The heater insertion challenges were essentially resolved utilizing the increased sleeve diameter. Ultimately, less radiation dose was incurred since substantially less time was spent by licensee personnel on the working platform.
The Unit 3 heater sleeve replacement project (fall 2004) incorporated the same heater sleeve inside diameter (1.300 inch). All heaters were inserted into the pressurizer on the initial attempt without rework and, therefore, there was no additional dose to personnel on the working platform due to rework.
The licensee recently determined that increasing the inside diameter of the replacement sleeves adversely impacted compliance with an ASME Section III Code Case.
3.0 REGULATORY REQUIREMENTS The inservice inspection (ISI) of the ASME Code Class 1, 2, and 3 components in nuclear plants is to be performed in accordance with the ASME Code Section XI and applicable edition and addenda as required by 50.55a(g) of Title 10 of the Code of Federal Regulations (10 CFR),
except where specific relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). The regulation at 10 CFR 50.55a(a)(3) states: "Proposed alternatives to the requirements of paragraphs (c), (d), (e), (f), (g), and (h) of this section or portions thereof may be used when authorized by the Director of the Office of Nuclear Reactor Regulation. The applicant shall demonstrate that: (i) The proposed alternatives would provide an acceptable level of quality and safety, or (ii) Compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety." The second 10-year ISI interval code for Palo Verde, Units 1, 2, and 3, is the ASME Code,Section XI, 1992 Edition, 1992 Addenda.
The 1992 Edition, 1992 Addenda, of the ASME Code,Section XI, IWA-4120(a) states that:
"Repairs shall be performed in accordance with the Owner's Design Specification and the original Construction Code of the component or system. Later Editions and Addenda of the Construction Code or of Section III, either in their entirety or portions thereof, and Code Cases may be used." The construction code for the Palo Verde units is ASME Section III, 1971 Edition, and 1973 Winter Addenda, and the installation code is ASME Section III, 1974 Edition, and 1975 Winter Addenda.
Palo Verde Generating Station, Units 1, 2, and 3 cc:
Mr. Steve Olea Mr. John Taylor Arizona Corporation Commission Public Service Company of New Mexico 1200 W. Washington Street 2401 Aztec NE, MS Z110 Phoenix, AZ 85007 Albuquerque, NM 87107-4224 Douglas Kent Porter Ms. Cheryl Adams Senior Counsel Southern California Edison Company Southern California Edison Company 5000 Pacific Coast Hwy Bldg DIN Law Department, Generation Resources San Clemente, CA 92672 P.O. Box 800 Rosemead, CA 91770 Mr. Robert Henry Salt River Project Senior Resident Inspector 6504 East Thomas Road U.S. Nuclear Regulatory Commission Scottsdale, AZ 85251 P. O. Box 40 Buckeye, AZ 85326 Mr. Jeffrey T. Weikert Assistant General Counsel Regional Administrator, Region IV El Paso Electric Company U.S. Nuclear Regulatory Commission Mail Location 167 Harris Tower & Pavillion 123 W. Mills 611 Ryan Plaza Drive, Suite 400 El Paso, TX 79901 Arlington, TX 76011-8064 Mr. John Schumann Chairman Los Angeles Department of Water & Power Maricopa County Board of Supervisors Southern California Public Power Authority 301 W. Jefferson, 10th Floor P.O. Box 51111, Room 1255-C Phoenix, AZ 85003 Los Angeles, CA 90051-0100 Mr. Aubrey V. Godwin, Director Brian Almon Arizona Radiation Regulatory Agency Public Utility Commission 4814 South 40 Street William B. Travis Building Phoenix, AZ 85040 P. O. Box 13326 1701 North Congress Avenue Mr. M. Dwayne Carnes, Director Austin, TX 78701-3326 Regulatory Affairs/Nuclear Assurance Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 310 E. Palm Lane, Suite 310 Phoenix, AZ 85004 November 2003