Letter Sequence Other |
---|
|
|
MONTHYEARML0928102282009-09-29029 September 2009 Request for Relief from the American Society of Mechanical Engineers (ASME) Code, Section Xl, Reactor Vessel Weld Inspection Frequency - Relief Request No. 44 Project stage: Request ML1015905162010-05-27027 May 2010 Response to Request for Additional Information Relief Request No. 44 Project stage: Response to RAI ML1021604872010-08-27027 August 2010 Relief Request No. RR-44, Reactor Vessel Weld Visual Examination Interval Extension for Third 10-Year Inservice Inspection Interval Project stage: Other 2010-05-27
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML22124A2412022-05-12012 May 2022 Relief Request 67 for an Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML22049A0572022-02-23023 February 2022 Relief Request 69 to Extend Inservice Inspection of Containment Tendon by Four Months Due to the Covid 19 Pandemic (EPID L 2022 Llr 0011 (Covid 19)) ML21278B0912021-10-0606 October 2021 Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (EPID L-2021-LRM-0104) (Slides) ML21228A1042021-08-12012 August 2021 RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (EPID L-2021-LLR-0050) (Email) ML21089A0102021-04-0202 April 2021 Relief Request 66 to Defer Inservice Inspection of Containment Tendon by One Year Due to Covid-19 Pandemic ML20088A5332020-03-27027 March 2020 Relief Request 65 - Unit 2, COVID-19, Request for Relief from Bottom Mounted Instrumentation Nozzles and a Pressurizer Nozzle to Surge Line Weld Overlay Examination ML19263F8752019-09-20020 September 2019 Relief Request VRR-01: Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)C3)(xi) ML19107A3722019-04-19019 April 2019 Relief Request 62 Regarding Proposed Alternative Pressurizer Heater Sleeve Repairs ML19044A6412019-02-19019 February 2019 Relief Request No. 58 for the Third 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers for Certain Class 1 and Class 2 Welds ML18285A0292018-10-19019 October 2018 Relief Request 59 for the Deferral of Reactor Vessel Beltline Region Interior Attachment Examinations ML18079A7252018-03-17017 March 2018 Relief Request 58 - Unit 2 Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML18016A1722018-01-12012 January 2018 Relief Request 50 - Request for Alternative to American Society of Mechanical Engineers Section XI Requirements for Pressure Retaining Boundary During System Leakage Tests ML17074A2092017-03-16016 March 2017 Relief Request GRR-01 to ASME Code Case OMN-20 for Third 10-Year Interval Pump and Valve Inservice Testing Program ML16172A0382016-06-23023 June 2016 Relief Request 54 to Approve an Alternative to Flaw Removal for Reactor Coolant Pump 2A Suction Pressure Instrument Nozzle, for the Third 10-Year Inservice Inspection Interval ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal ML15079A0062015-03-30030 March 2015 Relief Request 52 - Request for Approval of Alternate to Flaw Removal, Flaw Characterization and Successive Examinations, for the Remainder of Its Useful Life ML14093A4072014-04-10010 April 2014 Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval ML13091A1772013-04-12012 April 2013 Relief Request 48 - Alternative to ASME Section III, Phased Array Ultrasonic Exam Techniques in Lieu of Radiography for Remainder of Third 10-Year Inservice Inspection Interval ML13085A2542013-04-0404 April 2013 Relief Request 49, Alternative to ASME Code, Section XI, for Reactor Vessel Head Flange Seal Leak Detection Piping, Third 10-Year Inservice Inspection Interval ML12257A1412012-09-18018 September 2012 Request for Relief to Use Subsequent Edition and Addenda of ASME Code, Section XI, for Examination Categories B-L-1, B-M-1, and C-G, for the Third 10-Year Inservice Inspection Interval ML1026700802010-10-14014 October 2010 Relief Request No. 47, from Certain ASME Code Requirements for Reactor Vessel Nozzle to Vessel Welds for Second 10-Year Inservice Inspection Interval ML1025001432010-09-21021 September 2010 Relief Request No. 45 from Certain ASME Code Class 1 Weld and Component Volumetric Exams of Reactor Vessel Outlet Nozzles for Second 10-Year Inservice Inspection Interval ML1021604872010-08-27027 August 2010 Relief Request No. RR-44, Reactor Vessel Weld Visual Examination Interval Extension for Third 10-Year Inservice Inspection Interval ML0921603982009-07-17017 July 2009 Submittal of Relief Request from the American Society of Mechanical Engineers (ASME) Code, Section XI - Relief Request No. 46 ML0917001972009-07-0202 July 2009 Relief Request No. 39, Alternative to Repair Weld Methods, ASME Code, Section XI for Remainder of Operating License ML0916304492009-06-0202 June 2009 Inservice Testing Relief Request for High Pressure Safety Injection Pump Testing - Pump Relief Request PRR-08, Revision 1 ML0905801992009-02-17017 February 2009 Relief Request 41, to Use Appendix I of ASME Code Case N-729-1 ML0830105722008-11-10010 November 2008 Relief Request Nos. 18 and 36, Proposed Alternatives for the Third Interval 10-Year Inservice Inspection Program Interval ML0825905562008-10-0202 October 2008 Relief Request No. 34 for Second 10-Year Inservice Inspection Interval ML0822506752008-07-11011 July 2008 American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative Repair Method - Relief Request No. 39 ML0817002812008-06-0606 June 2008 Request for Extension to Complete the Final Confirmatory Analysis and Validation of Containment Sump Strainers Associated with NRC GL-04-002 ML0715600082007-06-21021 June 2007 Relief Request Nos. 36 and 37 Alternatives to Weld Overlay Requirements for Inservice Inspection ML0711400332007-05-16016 May 2007 Supplement to Relief Request No. 34 Request to Extend the Second 10-Year Inservice Inspection Program Interval for Reactor Vessel Weld Examinations ML0629302082006-11-0303 November 2006 Relief Request No. 32, Risk-Informed Inservice Inspection Program ML0626401992006-10-0404 October 2006 Relief Request No. 35 Request to Extend the Second 10-Year Inservice Inspection Program Interval for Reactor Vessel Visual Examinations ML0624905132006-09-20020 September 2006 Relief, Request to Extend the Second 10-Year Inservice Inspection Program Interval ML0623003332006-09-12012 September 2006 Relief Request No. 31, Revision 1, Proposed Alternative Repair for Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles ML0615702092006-05-26026 May 2006 Additional Information to Support the Request to Extend the Second 10-Year, American Society of Mechanical Engineers Section IX, Inservice Inspection Program Interval for Reactor Vessel Weld Examinations - Relief Request No. 34 ML0610803942006-04-0707 April 2006 Relief, Request to Use a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities at PVNGS in Accordance with 10 CFR 50.55a(g)(4)(iv) ML0518901452005-06-28028 June 2005 Revision 1 to 10 CFR 50.55a(a)(3)(i) Request for Alternatives to 10 CFR 50.55a(c) Requirement to Comply with ASME Section III, Subsection NB-1120, Temperature Limits, for a Portion of the Plant Pressurizer That Was Subjected To. ML0512901232005-05-0505 May 2005 Relief, Relief Request No. 31 Proposed Alternative Repair for Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles ML0434201672004-11-24024 November 2004 Relief Request No. 25 for Palo Verde, Unit 2 - Relaxation from First Revised NRC Order EA-03-009 - Additional Analysis Information for Control Element Drive Mechanism (CEDM) Nozzles ML0432706262004-11-19019 November 2004 Palo Verde - Correction to Approval Letter for Relief Request No. 30 ML0328705392003-10-0909 October 2003 Relief, Inservice Inspection Program Surface Examination Requirements, (TACs MC0830, MC0831, and MC0832) ML0321105422003-07-30030 July 2003 Relief Request 23 Alternative to Temper Bead Welding Requirements for Inservice Inspection Program (Tac. MB8973, MB8974 and MB8975) ML0314000512003-05-15015 May 2003 CFR 50.55a Alternative Repair Request for the Second 10-Year Interval of the Inservice Inspection Program: Relief Request 23, Pressurizer Heater Sleeves ML0302902122003-01-27027 January 2003 Relief, Requirements of American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code (Code) Concerning Use of Electrical Discharge Machining (Edm), MB6439, MB6440 & MB6441 ML0302801692003-01-24024 January 2003 Mechanical Nozzle Seal Assembly Type 2 Code Replacement Request for Relief from 10 CFR 50.55a ML0235200682002-12-11011 December 2002 Resubmittal of 10 CFR 50.55a Alternative Repair Request for the Second 10-Year Interval of the Inservice Inspection Program (Relief Request 18) ML0227404992002-09-25025 September 2002 CFR 50.55a Alternative Repair Request for the Second 10-Year Interval of the Inservice Inspection Program (Relief Request 22) 2022-05-12
[Table view] Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] Category:Safety Evaluation
MONTHYEARML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable ML22334A0702022-12-15015 December 2022 Issuance of Amendment Nos. 220, 220, and 220, to Revise Technical Specifications to Adopt TSTF-487, Relocate DNB Parameters to the COLR ML22178A0042022-08-11011 August 2022 Issuance of Amendment Nos. 219, 219, and 219, to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump Ts to Address GSI-191 Issues ML22049A0572022-02-23023 February 2022 Relief Request 69 to Extend Inservice Inspection of Containment Tendon by Four Months Due to the Covid 19 Pandemic (EPID L 2022 Llr 0011 (Covid 19)) ML21347A0032021-12-22022 December 2021 Issuance of Amendment Nos. 217, 217, and 217 Regarding Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML21307A1312021-11-17017 November 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21225A0932021-08-17017 August 2021 Ng Station, Units 1, 2,& 3 - Issuance of Amendment Nos. 216, 216, and 216 Regarding Revision to Technical Specifications to Adopt TSTF-501, Rev.1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21118B0282021-05-25025 May 2021 Letter/Se Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation ML21105A3402021-04-21021 April 2021 Issuance of Amendment Nos. 215, 215, and 215 Revision to Technical Specifications to Adopt TSTF-563, Revision 0 ML21089A0102021-04-0202 April 2021 Relief Request 66 to Defer Inservice Inspection of Containment Tendon by One Year Due to Covid-19 Pandemic ML20350B8032021-02-0808 February 2021 Issuance of Amendment Nos. 214, 214, and 214 to Make Administrative Changes to the Technical Specifications ML20216A5392020-08-0606 August 2020 Relief Request 65 for Inspection of Reactor Pressure Vessel Bottom Mounted Instrument Nozzles and Pressurizer Surge Line Weld Overlay ML20163A0372020-07-31031 July 2020 the Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 213, 213, and 213 to Revise Emergency Plan Staff Augmentation Times ML20114E3252020-04-30030 April 2020 Relief Request 64 for Impractical Examinations for the Third 10-Year Inservice Inspection Interval ML20031C9472020-03-0404 March 2020 Nonproprietary, Issuance of Amendment Nos. 212, 212, and 212 to Revise Technical Specifications to Support the Implementation of Framatome High Thermal Performance Fuel ML20016A4582020-02-10010 February 2020 Issuance of Amendment Nos. 211, 211, 211, to Extend Implementation Date for Amendment Nos. 209, 209, and 209 Associated W/Initiative 4b That Permit the Use of Risk-Informed Completion Times on the TS ML19309F3042019-12-18018 December 2019 Issuance of Amendment Nos. 210, 210, and 210, to Revise Technical Specifications to Adopt Traveler TSTF-529, Revision 4,Clarify Use and Application ML19304C5622019-11-0505 November 2019 Safety Evaluation - Arizona Public Service Company - Palo Verde Nuclear Generating Station - License Amendment Request to Adopt TSTF-529 ML19085A5252019-05-29029 May 2019 Issuance of Amendments Nos. 209, 209, and 209 - Regarding Adoption of Risk Informed Completion Times in Technical Specifications (CAC Nos. MF6576, MF6577, and MF6578; EPID L-2015-LLA-0001) ML19107A3722019-04-19019 April 2019 Relief Request 62 Regarding Proposed Alternative Pressurizer Heater Sleeve Repairs ML19070A2182019-04-0303 April 2019 Issuance of Amendment Nos. 208, 208, and 208 - Regarding Response Time Testing of Pressure Transmitters ML19044A6412019-02-19019 February 2019 Relief Request No. 58 for the Third 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers for Certain Class 1 and Class 2 Welds ML19037A0552019-02-19019 February 2019 Relief Requests 60 & 61 for the Fourth 10-Year Inservice Inspection Interval, Request for Relief from the American Society of Mechanical Engineers Half-Nozzle Repairs (EPID L-2018-LLR-0111 & EPID L-2018-LLR-0112) ML18285A0292018-10-19019 October 2018 Relief Request 59 for the Deferral of Reactor Vessel Beltline Region Interior Attachment Examinations ML18243A2802018-10-10010 October 2018 Issuance of Amendment Nos. 207, 207, and 207 to Adopt 10 CFR 50.69 (CAC Nos. MF9971, MF9972, and MF9973; EPID L-2017-LLA-0276) ML17254A4992017-09-27027 September 2017 Issuance of Amendment Nos. 204, 204, and 204 to Modify the Completion Date for Implementation of Milestone 8 of the Cyber Security Plan ML17188A4122017-07-28028 July 2017 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Issuance of Amendment Nos. 203, 203, and 203 to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis (CAC Nos. MF7138, MF7139, and MF7140) ML17123A4352017-05-16016 May 2017 Issuance of Amendment Nos. 202, 202, and 202 to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML17090A1642017-04-27027 April 2017 Issuance of Amendment No. 201, 201, and 201 to Revise Technical Specifications Related to Degraded and Loss of Voltage Relay Modifications ML17074A2092017-03-16016 March 2017 Relief Request GRR-01 to ASME Code Case OMN-20 for Third 10-Year Interval Pump and Valve Inservice Testing Program ML17004A0202017-01-0404 January 2017 Issuance of Amendment No. 200, Revise Technical Specification 3.8.1, AC Sources - Operating, for One-Time Extension of the Diesel Generator Completion Time, Risk-Informed (Emergency Circumstances) ML17003A0832017-01-0303 January 2017 Safety Evaluation Input Regarding Changes to Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML17004A2092017-01-0303 January 2017 Safety Evaluation Input for Palo Verde Nuclear Generating Station, Unit 3, Llcense Amendment Request for a One-Time Extension of the 3B Emergency Diesel Generator Completion Time ML17003A3892017-01-0303 January 2017 Safety Evaluation Input Regarding the Palo Verde Nuclear Generating Station Unit 3 Emergency Request to Extend Diesel Generator 3B Completion Time ML16358A4152016-12-23023 December 2016 Technical Specifications for One-Time Extension of Completion Time for Emergency Diesel Generator ML16358A6762016-12-23023 December 2016 Issuance of Amendment No. 199, Request for One-Time Extension of the Diesel Generator Completion Time (Emergency Circumstances) ML16180A1092016-09-0808 September 2016 Issuance of Amendment Nos. 198, 198, and 198, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. ML16194A3232016-07-22022 July 2016 Review and Approval of Request for Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 11-04A, Nuclear Generation Quality Assurance Program Description ML16088A2612016-07-20020 July 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16172A0382016-06-23023 June 2016 Relief Request 54 to Approve an Alternative to Flaw Removal for Reactor Coolant Pump 2A Suction Pressure Instrument Nozzle, for the Third 10-Year Inservice Inspection Interval ML16004A0132016-02-19019 February 2016 Issuance of Amendment No. 197, 197, and 197, Adopt Technical Specification Task Force Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML15266A0052015-09-25025 September 2015 Issuance of Amendment No. 196, Revise Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 (Exigent Circumstances) ML15238B6612015-09-15015 September 2015 Relief Request 53, Alternative to ASME Code Section XI Requirements Related to Flaw Removal ML15070A1242015-03-30030 March 2015 Issuance of Amendment Nos. 195, 195, and 195, Adopt TSTF-486, Revision 2, Revise Mtc Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) and TSTF-406, Revision 2 ML15079A0062015-03-30030 March 2015 Relief Request 52 - Request for Approval of Alternate to Flaw Removal, Flaw Characterization and Successive Examinations, for the Remainder of Its Useful Life ML15058A0292015-03-27027 March 2015 Staff Assessment Regarding Review of Pressurized-Water Reactor Vessel Internals Aging Management Program Plan ML14202A3782014-09-0909 September 2014 Issuance of Amendment Nos. 194, 194, and 194, Request to Revise TS 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip (TAC Nos. MF2879-81) ML14115A0452014-06-25025 June 2014 Issuance of Amendment Nos. 193, 193, and 193, Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML14093A4072014-04-10010 April 2014 Relief Request 51, Alternative to ASME Code for Flaw Removal, Reactor Vessel Bottom-mounted Instrumentation Nozzle, Third 10-Year ISI Interval 2023-09-13
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 27, 2010 Mr. Randall K. Edington Executive Vice President Nuclear/
Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034 SUB..IECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 2 AND 3 - RELIEF REQUEST NO, RR-44, REACTOR VESSEL WELD VISUAL EXAMINATION INTERVAL EXTENSION (TAC NOS. ME2335 AND ME2336)
Dear Mr. Edington:
By letter dated September 29,2009, as supplemented by letter dated May 27,2010, Arizona Public Service Company (the licensee), requested Nuclear RegUlatory Commission (NRC) approval of Relief Request No. 44 (RR-44), to use an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),
Section XI, for examination of the Class 1 reactor vessel (RV) interior attachments beyond the beltline region and the removable core support structure at Palo Verde Nuclear Generating Station (PVNGS), Units 2 and 3. Specifically, pursuant to paragraph 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the licensee requested approval to extend the current inservice inspection (lSI) interval for visual examination of these RV components at PVNGS, Units 2 and 3, until 2027 and 2028, respectively, to coincide with the VOlumetric examination schedules for certain RV welds, authorized by the NRC staff for Relief Request No. 40, issued on February 22, 2010.
The NRC staff has completed its review of the information provided by the licensee for RR-44.
The staff concludes that the information provided supports the granting of the proposed alternative of RR-44 pursuant to 10 CFR 50.55a(a)(3)(ii), because compliance with the ASME Code,Section XI lSI interval requirements represents a hardship without a compensating increase in the level of quality and safety for the subject ASME Code Class 1 components at PVNGS, Units 2 and 3. The licensee's proposed alternative is approved for the specified components, for the extended inspection interval dates of 2027 and 2028, for PVNGS, Units 2 and 3, respectively.
R. Edington -2 A copy of the Safety Evaluation is enclosed. All other ASME Code,Section XI requirements for which relief has not been specifically requested and approved remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Sincerely, Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-529 and 50-530
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION INSERVICE INSPECTION PROGRAM RELIEF REQUEST NO. 44 REACTOR PRESSURE VESSEL VISUAL EXAMINATION INTERVAL EXTENSION PALO VERDE NUCLEAR GENERATING STATION, UNITS 2 AND 3 ARIZONA PUBLIC SERVICE COMPANY DOCKET NOS. STN 50-529 AND STN 50-530
1.0 INTRODUCTION
By letter dated September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092810228), as supplemented by letter dated May 27,2010 (ADAMS Accession No. ML101590516), Arizona Public Service Company (the licensee) submitted Relief Request No. 44 (RR-44), for the Palo Verde Nuclear Generating Station (PVNGS), Units 2 and 3. In RR-44, the licensee requested an alternative to the examination requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI for a number of ASME Code Class 1 components at PVNGS, Units 2 and 3. Specifically, the licensee requested approval to extend the current inservice inspection (lSI) interval for visual examination of the reactor vessel (RV) interior attachments beyond the beltline region and the removable core support structure at PVNGS, Units 2 and 3, until 2027 and 2028, respectively. The proposed alternative would allow the licensee to conduct the subject visual examinations coincident with the volumetric examination schedules for certain RV welds authorized by the U.S. Nuclear Regulatory Commission (NRC) staff on February 22, 2010 (ADAMS Accession No. ML100290415). The staff reviewed and evaluated the licensee's request pursuant to the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(a)(3)(ii).
2.0 REGULATORY EVALUATION
Inservice inspection (lSI) of ASME Code Class 1, 2, and 3 components is performed in accordance with Section XI of the ASME Code and applicable addenda as required by 10 CFR 50.55a(g), except where specific relief has been granted by the NRC pursuant to 10 CFR 50.55a(g)(6)(i). The regulations in 10 CFR 50.55a(a)(3) state that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if (i) the proposed alternatives would provide an acceptable level of quality and safety or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Enclosure
-2 Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulation requires that inservice examination of components and system pressure tests conducted during the first 1O-year interval and subsequent intervals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The applicable Code of record for the third 1O-year interval lSI program at PVNGS, Units 2 and 3 is the 2001 Edition of the ASME Code,Section XI, with 2003 Addenda. The third 10-year interval lSI program at PVNGS, Unit 2 ends on March 17, 2017. The third 1O-year interval lSI program at PVNGS, Unit 3 ends on January 10, 2018.
3.0 TECHNICAL EVALUATION
3.1 Component Identification RR-44 addresses the following ASME Code,Section XI, Examination Categories and Item Numbers covering examinations of ASME Code Class 1 components (the subject components) for the third 1O-year interval lSI program at PVNGS, Units 2 and 3. The following examination categories and item numbers are from Table IWB-2500-1 of the 2001 Edition and 2003 Addenda of the ASME Code,Section XI.
ASME Code Examination Class Category Item Number(s) Component Description 1 B-N-2 and B13.60 and Interior Attachments Beyond Beltline Region B-N-3 B13.70 Core Support Structure 3.2 NRC Staff Evaluation Pursuant to 10 CFR 50.55a(a)(3)(ii), the licensee submitted RR-44 in order to obtain authorization for an alternative to the examination requirements of the ASME Code,Section XI for the subject Class 1 components at PVNGS, Units 2 and 3. The 2001 Edition and 2003 Addenda of the ASME Code,Section XI, Article IWB-2500 requires that components be examined and tested as specified in Table IWB-2500-1 of the ASME Code,Section XI.
Table IWB-2500-1 defines the specific examination requirements for the subject Class 1 components.
In RR-44, the licensee requested an alternative to the ASME Code,Section XI examination requirements specified in Table IWB-2500-1, Examination Categories B-N-2 and B-N-3, for the RV interior attachments beyond the beltline region and the removable core support structure at PVNGS, Units 2 and 3. The ASME Code,Section XI, requires a visual test level 3 (VT-3)
-3 examination of all accessible welds for the RV interior attachments and all accessible surfaces for the removable core support structure components once each 1O-year inspection interval.
The licensee requested approval to increase the interval for performing the required VT-3 examinations of these components at PVNGS, Units 2 and 3 because, according to the licensee, compliance with the ASME Code,Section XI requirements for completing these examinations during the scheduled third 10-year interval lSI programs for both units would result in hardship without a compensating increase in the level of quality and safety. The licensee proposed to defer the VT-3 examinations for these Examination Category B-N-2 and B-N-3 components until 2027 and 2028 for PVNGS, Units 2 and 3, respectively. The VT-3 examinations for these components were last performed in 2008 for Unit 2 and in 2009 for Unit 3.
The licensee stated that the increased inspection interval proposed for these components would align the VT-3 examinations of these components with the currently scheduled volumetric examinations of the Examination Category B-A and B-D RV welds. The licensee stated that the schedule for the examinations of the Examination Category B-A and B-D RV welds was addressed in a previous relief request. In that request, "Request for Relief From the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Reactor Vessel Weld Inspection Frequency - Relief Request No. 40," dated July 1,2009 (RR-40) (ADAMS Accession No. ML091870432), the licensee proposed the deferral of the ASME Code, Section XI-required volumetric examinations for the Examination Category B-A and B-D RV welds based upon WCAP-16168-NP-A, Revision 2, "Risk-Informed Extension of the Reactor Vessel In-Service Inspection Interval," dated June 13,2008 (ADAMS Accession No. ML082820046). In RR-40, the licensee requested an alternative to allow the volumetric examinations for the subject RV welds at PVNGS, Units 1, 2, and 3 to be deferred until 2016, 2027, and 2028, respectively.
The licensee stated that the visual examinations of the RV interior attachments beyond the beltline region and the core support structure require that the fuel and core support barrel be removed from the RV. Therefore, the licensee has historically performed these visual examinations during the same refueling outage as the volumetric examinations for the RV welds. The licensee stated that performing the visual examinations of the subject components during the same refueling outage as the RV weld volumetric examinations will result in a significant reduction in radiation exposure because the RV internals will only be removed once to accommodate both examinations. According to the licensee, an unnecessary risk is created by the removal of the fuel and core barrel more than once within an inspection interval for the sole purpose of performing a visual examination of these internal components. Furthermore, according to the licensee, the radiation exposure resulting from the performance of the visual examinations for these components would essentially double if the subject examinations did not occur during the same refueling outage as the volumetric examinations for the RV welds.
The licensee stated that the visual examinations of the RV interior attachments beyond the beltline region and core support structure have been performed several times at PVNGS, Units 2 and 3, with no relevant indications noted during the examinations. The visual examinations were last performed at PVNGS, Units 2 and 3, in 2008 and 2009, respectively, with acceptable results. According to the licensee, a review of industry operating experience
- 4 reveals that these examinations have been performed many times by the industry with no significant findings.
The NRC staff reviewed the information provided by the licensee concerning its request to defer the VT-3 examinations of the RV interior attachments beyond the beltline region (Examination Category B-N-2) and removable core support structures (Examination Category B-N-3) until 2027 for PVNGS, Unit 2 and 2028 for PVNGS, Unit 3. The VT-3 examinations for these components were last performed in 2008 for Unit 2 and 2009 for Unit 3, with acceptable results.
The end date for the third 1O-year interval lSI program is March 17, 2017, for Unit 2 and January 10,2018, for Unit 3. The ASME Code,Section XI, Subarticle IWB-2430, paragraph (d) states that for components inspected under Inspection Program B, the lSI intervals may be extended or decreased by as much as 1 year, and the adjustments to the length of lSI intervals shall not cause successive lSI intervals to be altered by more than 1 year from the original pattern of intervals for the plants. Therefore, the ASME Code,Section XI requires that these examinations be performed prior to March 17, 2018 for Unit 2 and January 10, 2019, for Unit 3.
Accordingly, the examination deferral proposed in RR-44 would postpone the subject VT-3 examinations for 9 years beyond the time limit for performing these examinations required by the ASME Code,Section XI.
The NRC staff reviewed the licensee's justification for deferring the subject VT-3 examinations and agreed with the licensee's determination that the deferral proposed in RR-44 is necessary in order to align the VT-3 examinations for the subject components with the scheduled volumetric examinations for the Examination Category B-A and B-D RV welds. The staff verified that the licensee had submitted a separate request for an alternative to the ASME Code,Section XI examination requirements in order to defer the volumetric examinations for the Examination Category B-A and B-D RV welds until the 2027 and 2028 refueling outages for PVNGS, Units 2 and 3, respectively. The NRC staff authorized this 10-year deferral of the RV weld vOlumetric examinations in a safety evaluation that was transmitted to the licensee by letter dated February 22, 2010. The deferral of the volumetric examinations for the Examination Category B-A and B-D RV welds was authorized based on the licensee having demonstrated that it had met the risk-informed criteria of WCAP-16168-NP-A for the RV welds.
The NRC staff agreed with the licensee's determination that performing VT-3 examinations of the RV internal attachments beyond the beltline and core support structure so that the timing of these examinations would meet the lSI interval requirements of the ASME Code,Section XI represents a hardship without a compensating increase in the level of quality and safety. The staff agreed with this determination because: (1) an unnecessary risk is created by the removal of the fuel and core support barrel from the RV in order to perform these examinations, and (2) the radiation exposure resulting from the performance of these VT-3 examinations would double if these examinations were performed at a time different from the RV weld volumetric examinations. The staff agreed that the removal of the fuel and core support barrel is necessary in order to perform the VT-3 examinations of the RV interior attachments and core support structure and that these VT-3 examinations have historically been performed during the same refueling outage as the volumetric examinations for the RV welds. None of the previous examinations of the Examination Category B-N-2 and B-N-3 components at PVNGS, Units 2 and 3 have found indications of cracking or service-induced degradation. The staff also noted that no other nuclear power plant performs these VT-3 examinations on a different interval schedule than that for the Examination Category B-A and B-D RV welds.
- 5 Based on the above considerations, the NRC staff determined that performing the VT-3 examinations of the RV interior attachments beyond the beltline (Examination Category B-I\I-2) and the removable core support structures (Examination Category B-N-3) in order to meet the lSI interval requirements of the ASME Code,Section XI represents a hardship without a compensating increase in the level of quality and safety for PVNGS, Units 2 and 3. Therefore, the staff concludes that the licensee's request to defer the subject examinations until 2027 for PVI\lGS, Unit 2, and until 2028 for PVNGS, Unit 3 is acceptable.
4.0 CONCLUSION
The NRC staff has completed its review of RR-44 for PVNGS, Units 2 and 3. The staff concludes that compliance with the ASME Code,Section XI lSI interval requirements represents a hardship without a compensating increase in the level of quality and safety for the subject ASME Code Class 1, Examination Category B-N-2 and B-N-3 components at PVNGS, Units 2 and 3. Therefore, RR-44 is authorized pursuant to 10 CFR 50.55a(a)(3)(ii) for the third 10-year interval lSI program at PVNGS, Units 2 and 3, and the licensee may defer the VT-3 examinations of the RV interior attachments beyond the beltline region and the removable core support structure until 2027 and 2028 for PVNGS, Units 2 and 3, respectively.
All other requirements of the ASME Code,Section XI, for which relief has not been specifically requested and approved, remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: C. Sydnor Date: August 27,2010
R. Edington -2 A copy of the Safety Evaluation is enclosed. All other ASME Code,Section XI requirements for which relief has not been specifically requested and approved remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Sincerely,
/RAJ Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-529 and 50-530
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPMPaloVerde Resource LPLIV r/f RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsNrrDciCvib Resource RidsRgn4MailCenter Resource RidsNrrDorlDpr Resource LTrocine, EDO RIV RidsNrrDorlLpl4 Resource CSydnor, NRRIDCI/CVIB ADAMS Accession No ML102160487 *SE memo dated OFFICE NRR/LPL4/PM NRR/LPL4/LA DCI/CVIB/BC NRR/LPL4/BC NAME JRHall JBurkhardt MMitchell* MMarkley DATE 8/25/10 8/17/10 7/16/10 8/27/10 OFFICIAL AGENCY RECORD