Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] Category:Licensee 30-Day Written Event Report
[Table view] Category:Written Event Report (30 or 60 day)
[Table view] |
Text
-; Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 INDIANA MICHIGAN POWER November 24, 2003 AEP:NRC:3046-02 10 CFR 50.46 Docket Nos: 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P I-17 Washington, D. C. 20555-0001 Donald C. Cook Nuclear Plant Unit 2 THIRTY-DAY REPORT OF LOSS-OF-COOLANT ACCIDENT EVALUATION MODEL CHANGES
Reference:
I. Letter from John A. Zwolinski, Indiana Michigan Power Company, to U. S. Nuclear Regulatory Commission Document Control Desk, "Donald C. Cook Nuclear Plant Units I and 2 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes," AEP:NRC:3046, dated August 27, 2003 Pursuant to 10 CFR 50.46(a)(3)(ii), Indiana Michigan Power Company (I&M),
the licensee for Donald C. Cook Nuclear Plant (CNP), is submitting this report of loss-of-coolant accident (LOCA) model changes resulting in a significant change in calculated peak fuel cladding temperature (PCT). A significant change is defined as a change or error identified in the model which results in a calculated PCT greater than 50 degrees Fahrenheit (F).
The latest Westinghouse Electric Company (Westinghouse) evaluation, utilizing the NOTRUMP model, demonstrated a PCT increase of +35 0 F for the burst and blockage/time in life and an additional PCT increase of +35 0 F in the NOTRUMP bubble rise/drift flux model resulting in a total PCT increase of 70'F as documented in Attachment 1. Attachments I and 2 demonstrate that all PCT values remain well within the 2200'F PCT limit as required in 10 CFR 50.46(b)(1).
Attachment I of this letter describes the current assessments against the Unit 2 small break (SB) LOCA with the safety injection cross-tie valve closed. The only case affected is the analysis of record with the safety injection cross-tie valves closed. Attachment 2 provides the SBLOCA analysis of record PCT value and error assessments. Attachment 2 also demonstrates that the PCT value remains within the 2200°F PCT limit as required in 10 CFR 50.46(b)(1).
A0D]
U. S. Nuclear Regulatory Commission AEP:NRC:3046-02 Page 2 The overall change to the PCT of the Unit 2 limiting SBLOCA analysis is classified as significant in accordance with 10 CFR 50.46(a)(3)(ii). The schedule for the reanalysis of the Unit 2 SBLOCA was previously transmitted in Reference I and remains unchanged.
There are no new commitments in this submittal. Should you have any questions, please contact Mr. Brian Mann, Acting Manager of Regulatory Affairs, at (269) 697-5806.
Sincerely, John .. Zwolinski Directo of Design Engineering and Regulatory Affairs DB/rdw Attachments c: J. L. Caldwell, NRC Region III K. D. Curry, Ft. Wayne AEP, w/o attachments J. T. King, MPSC, w/o attachments MDEQ - WHMD/HWRPS, w/o attachments NRC Resident Inspector M. A. Shuaibi, NRC Washington, DC
U. S. Nuclear Regulatory Commission AEP:NRC:3046-02 Page 3 bc: T. E. Anderson M. J. Finissi D. W. Jenkins, %v/oattachments J. N. Jensen R. J. Kohrt B. D. Mann, w/o attachments M. K. Nazar J. E. Newmiller D. J. Poupard M. K. Scarpello, w/o attachments T. K. Woods, v/o attachments J. A. Zwolinski, w/o attachments
ATTACHMENT I TO AEP:NRC:3046-02 ASSESSMENT AGAINST THE LOSS-OF-COOLANT ACCIDENT ANALYSES OF RECORD Assessment Against the Small Break Loss-of-Coolant Accident (LOCA) Analysis of Record:
NOTRUMP Bubble Rise / Drift Flux Model Inconsistency Corrections
Background:
NOTRUMP was updated to resolve some inconsistencies in several drift flux models as well as the nodal bubble rise / droplet fall models.
Estimated Effect:
As indicated in the peak fuel cladding temperature (PCT) accounting in Attachment 2, implementation of the NOTRUMP Bubble Rise/Drift Flux Model Inconsistency corrections leads to a bounding 35 degree Fahrenheit (F) increase of the calculated PCT for 10 CFR 50.46 purposes. This 350 F PCT penalty is listed under Category B, Item 1, NOTRUMP bubble rise/drift flux model inconsistency corrections. The 350 F PCT increase from the corrections in NOTRUMP resulted in a further 35 0 F PCT increase due to SPIKE Correlation Revision penalty.
The SPIKE computer program and associated methodology computes PCT increases that would result from fuel rod burst PCT penalties for small break LOCA analyses. The 35 0 F PCT penalty associated with the SPIKE Correlation is included in Attachment 2 under Category A, Item 2, Burst and blockage / time in life. The +95 0 F penalty listed includes a new assessment of +35 0 F from the SPIKE Correlation.
Conclusion This transmittal satisfies the 30-day reporting requirement of 10 CFR 50.46(a)(3)(ii). demonstrates that the PCT value remains within the 2200'F PCT limit specified in 10 CFR 50.46(b)(1).
ATTACHMENT 2 TO AEP:NRC:3046-02 DONALD C. COOK NUCLEAR PLANT UNIT I SMALL BREAK LOSS-OF-COOLANT ACCIDENT PEAK CLAD TEMPERATURE
SUMMARY
J '7 Attachment 2 to AEP:NRC:3046-02 Page 1 CNP UNIT 2 SMALL BREAK LOCA Evaluation Model: NOTRUMP FQ=2.45 FAtl=.666 SGTP=15% 3" cold leg break Operational Parameters: SI System Cross-Tie Valves Closed, 3250 MWt Reactor Power' LICENSING BASIS Analysis-of-Record, March 1992 PCT= 1956 0 F MARGIN ALLOCATIONS (A PCT)
A. PREVIOUS 10 CFR 50.46 ASSESSMENTS 2 I. Limiting NOTRUMP and SBLOCA analysis3 -214 0 F
- 2. Burst and blockage / time in life +950 F
- 3. Asymmetric HHSI Delivery +50 0 F
- 4. NOTRUMP mixture level tracking/region depletion errors +13 0 F B. NEW 10 CFR 50.46 ASSESSMENTS 0F
- 1. NOTRUMP Bubble Rise/Drift Flux Model Inconsistency +35 0 F Corrections C. OTHER 0F D. LICENSING BASIS PCT+ MARGIN ALLOCATIONS PCT= 1935 0 F
' Unit 2 is licensed to a 3468 MWt steady-state power level. However, 3304 MWt is assumed for the small break LOCA analysis with the SI system cross-tie valves closed. This is because Unit 2 Technical Specification 3.5.2 limits thermal power to 3304 MWt with a safety injection cross-tie valve closed. The 3250 MWt power level used in the reanalysis is acceptable because it bounds the Unit 2 3304 MWt steady state power limit in the operating license after adjusting for recapture of feedwater flow measurement and power calorimetric uncertainty.
2 ECCS model assessments are no longer being listed by year of occurrence. Instead the errors are being identified by error type. This is consistent with Westinghouse reporting methods and does not change the overall PCT.
3 This reanalysis is considered an evaluation because a full spectrum of break sizes was not analyzed. This reanalysis incorporated the errors previously reported (Letter from M. W. Rencheck, Indiana Michigan Power Company to Nuclear Regulatory Commission Document Control Desk, "Donald C. Cook Nuclear Plant Unit 2 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes," submittal C1000-07, dated October 27, 2000) in the individual years in which they occurred. The difference between the analysis-of-record limiting break size PCT and the reanalysis PCT is -214'F. Thus, since this reanalysis incorporates the errors previously reported, the errors are no longer being reported individually. Note that this does not impact the resulting PCT as it remains at 1935°F. It is only an accounting change.