MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4722022-01-28028 January 2022 ES-301-6 ML22153A4682022-01-28028 January 2022 ES-301-4 U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2582021-04-13013 April 2021 Scenarios ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A2402021-04-13013 April 2021 LTR 75 Day Submittal ML21144A2372021-04-13013 April 2021 ES-301-4 ML21144A3032021-04-13013 April 2021 Administered RO Written Exam ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A2382021-04-13013 April 2021 ES-301-6 ML21144A2682021-04-13013 April 2021 SRO Admin JPM ML21144A3192021-04-13013 April 2021 ES-301-2 ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A2312021-04-13013 April 2021 Post Exam Submittal Letter 2024-06-27
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 ML23258A0212023-09-15015 September 2023 Form 5.1-1 Post-Examination Check Sheet (Clinton 2023) IR 05000461/20233012023-09-12012 September 2023 NRC Initial License Examination Report 05000461/2023301 ML23258A0132023-08-24024 August 2023 Form 1.3-1 Examination Security Agreement (Clinton 2023) ML23258A0162023-08-24024 August 2023 Form 2.1-1 Examination Prep Checklist (Clinton 2023) ML23258A0222023-08-0101 August 2023 Licensee Post-Exam Submittal Letter (Clinton 2023) ML23258A0232023-08-0101 August 2023 Post-Exam Comments (None, Clinton 2023) ML23191A8772023-07-11011 July 2023 Operator Licensing Examination Approval Clinton Power Station July 2023 ML23258A0502023-07-0808 July 2023 Form 2.3-1 Examination Outline Quality Checklist (Clinton 2023) ML23258A0522023-07-0808 July 2023 Form 3.4-1 Events and Evolutions Checklist (Clinton 2023) ML23258A0942023-07-0606 July 2023 Form 2.3-4 Written Examination Quality Checklist (Clinton 2023) ML23258A0932023-07-0606 July 2023 Form 2.3-2 Operating Test Quality Checklist (Clinton 2023) RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23258A0952023-04-0606 April 2023 Licensee Exam Submittal Letter (Clinton 2023) ML23258A0562023-02-0606 February 2023 Licensee Outline Submission Letter (Clinton 2023) ML22341A6042022-12-0808 December 2022 Confirmation of Initial License Examination IR 05000461/20223012022-04-13013 April 2022 NRC Initial License Examination Report 05000461/2022301 RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22153A5222022-01-28028 January 2022 ES-301-5 Clinton 2022 ML22153A4782022-01-28028 January 2022 ES-301-3 ML22153A5172022-01-28028 January 2022 ES-201-2 Clinton 2022 NRC Written Outline Only U-604643, U-604643 ILT Exam Outline - Clinton 20222022-01-28028 January 2022 U-604643 ILT Exam Outline - Clinton 2022 ML22153A5202022-01-28028 January 2022 ES-201-2 Clinton ML22157A3872022-01-28028 January 2022 Post Exam Submittal Letter Clinton 22 ML22157A3782022-01-28028 January 2022 ES-201-3 Pre Exam ML22153A4762022-01-28028 January 2022 U-604644 - CPS Submittal of Integrated Initial License Training Examination Materials - 75-Day ML22153A4722022-01-28028 January 2022 ES-301-6 ML22157A3772022-01-28028 January 2022 ES-201-3 Post Exam Security Agreement ML22157A3752022-01-28028 January 2022 ES-201-1 Exam Prep Checklist ML22157A3822022-01-28028 January 2022 ES-403-1 Clinton 2022 ML22153A4682022-01-28028 January 2022 ES-301-4 ML22010A0992022-01-11011 January 2022 Operator Licensing Examination Approval ML21215A5732021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21174A3062021-06-25025 June 2021 Confirmation of Initial License Examination IR 05000461/20213012021-04-29029 April 2021 NRC Initial License Examination Report 05000461/2021301 ML21144A2232021-04-13013 April 2021 ES-201-1 ML21144A2292021-04-13013 April 2021 ES-201-3 ML21144A3232021-04-13013 April 2021 ES-D-1 ML21144A2302021-04-13013 April 2021 ES-403-1 ML21144A3222021-04-13013 April 2021 ES-401-3 ML21144A3202021-04-13013 April 2021 ES-401-1 ML21144A3192021-04-13013 April 2021 ES-301-2 ML21144A3132021-04-13013 April 2021 Administered SRO Written Exam ML21144A3102021-04-13013 April 2021 Administered Sim JPM ML21144A3182021-04-13013 April 2021 ES-301-1 ML21145A0332021-04-13013 April 2021 ES-201-2 Written Outline ML21145A0442021-04-13013 April 2021 Operating Test Outline Submittal Letter ML21145A0362021-04-13013 April 2021 ES-201-2 ML21145A0402021-04-13013 April 2021 ES-301-5 2024-06-27
[Table view] |
Text
CLINTON POWER STATION Job Performance Measure Equalize Around and Open MSIVs per CPS No. 4411.09 JPM Number: 4411.0901 Revision Number: 01 Date: 7/8/03 Developed By: T. Pickley 7/8/03 Instructor Date Validated By: J. Anderson 10/17/03 SME or Instructor Date Review By: P. K. Ryan _7/28/03 Operations Representative Date
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, or simulator)
________ 4. Initial setup conditions are identified.
________ 5. Initiating and terminating cues are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
________ 9. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 11
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 Revision Record (Summary)
- 1. Revision 01, Reformatted from 15200J07 Page 3 of 11
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 Operators Name: SSN:
Job
Title:
NLO RO SRO STA SRO Cert JPM Title/Number: Equalize Around and Open MSIVs per CPS No. 4411.09 Revision Number: 01 Task Number and
Title:
441109.01, Complete control room actions to perform RPV pressure control sources using normal system lineup/operation Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: No Perform Alternate Path: No Time Critical: No Estimated Time to Complete: 30 _minutes Actual Time Used: minutes
References:
CPS No. 4411.09 RPV PRESSURE CONTROL SOURCES EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: __________________________
Evaluators Signature: Date:
Page 4 of 11
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues.
When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
SIMULATOR SET-UP CONDITIONS:
Reset to a shutdown IC, at ~300 psig with a vacuum pump, CW in operation and Main Turbine reset, then:
- 1) Close the Inboard MSIVs
- 4) Depressurize equalizing header with BPV jack to ~50 psig
- 5) Set pressure set at >315 psig TASK STANDARDS:
Operator actions performed per CPS No. 4411.09 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
REFERENCES:
CPS No. 4411.09 RPV PRESSURE CONTROL SOURCES EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
INITIAL CONDITIONS AND INITIATING CUE:
A loss of IA resulted in closure of the Inbd. MSIVs. IA has been recovered. EOP-1 has been entered and to assist in RPV pressure control you are directed to reopen the Inbd. MSIVs per CPS No. 4411.09.
START TIME:
Page 5 of 11
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01
==============================================================
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
==============================================================
PERFORMANCE STEPS 2.2.1 MAIN STEAM - CONDENSER/BYPASS VALVES/MSL DRAINS
- 1. IF This section was entered from EOP-2, EOP-3 or SAG-2, THEN 1) OK to defeat isolations per CPS 4410.00C007, Defeating RPV Vent Interlocks.
- 2) OK to exceed 100°F/hr cooldown.
- 2. Reset any cleared GROUP 1 isolations.
Standard Determines that no pressure control system interlocks need to be defeated and that Group 1 isolation is reset.
CUE Comments SAT UNSAT Comment Number Page 6 of 11
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01
- 3. Regardless if Circ Water (CW) is available or not:
- 1) Establish vacuum per CPS 3112.01, Condenser Vacuum (CA), or
- 2) If vacuum cannot be established, open 1CA007, Condenser Vacuum Breaker Valve.
Standard Determines that Condenser vacuum is already established.
CUE Comments SAT UNSAT Comment Number
- 4. Verify/set pressure set at least 15 psig > RPV pressure to prevent inadvertent BPV operation.
Standard Verifies that the pressure at least 15 psig > RPV pressure or adjusts as needed.
CUE Comments SAT UNSAT Comment Number
- 5. Shut/verify shut:
- 1) 1B21-F022B(D, A, C), Main Steam Line B (D, A, C) Inbd MSIV.
- 2) 1B21-F016, MS Drn & MSIV Byp Inbd Isol Valve.
- 3) 1B21-F019, MS Drn & MSIV Byp Outbd Isol Valve.
- 4) 1B21-F020, MSIV Byp Vlv For MS Line Warm Up.
Standard 1) 1B21-F022B(D, A, C), are verified shut (Green lights on)
- 2) 1B21-F016, F019 and F020, are verified shut (Green lights on)
CUE Comments SAT UNSAT Comment Number Page 7 of 11
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01
- 6. Open/verify open:
- 1) 1B21-F098B(D, A, C), Main Steam Shutoff Valves.
- 2) 1B21-F028B(D, A, C), Main Steam Line Outbd MSIVs.
Standard 1B21-F098B(D, A, C) and 1B21-F028B(D, A, C) are verified open (red lights on)
CUE Comments SAT UNSAT Comment Number
- 7. Equalize around the Inbd MSIVs (F022s) to establish a P 200 psid across the MSIVs by opening:
- 1) 1B21-F016, MS Drn & MSIV Byp Inbd Isol Valve.
- 2) 1B21-F019, MS Drn & MSIV Byp Outbd Isol Valve.
- 3) 1B21-F020, MSIV Byp Vlv For MS Line Warm Up.
Standard Opens 1B21-F016, 1B21-F019 and 1B21-F020 CUE Comments SAT UNSAT Comment Number Page 8 of 11
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01
? OK to shut following drains to assist in the dP attempt.
o 1B21-F015, MS Low Points Drn Shutoff Valve.
o 1B21-F021, Inbd MSIV Before Seat Warmup Drn Valve.
o 1B21-F033, Inbd MSIV Before Seat Warmup Drn Valve.
o 1B21-F068, Outbd MSIV Before Seat Warmup Drn Vlv.
o 1B21-F069, Outbd MSIV Before Seat Norm Drn Vlv.
o 1B21-F070, MS Low Point Warm Up Drn Vlv.
o 1B21-F071, MS Low Point Normal Drn Vlv.
o 1TD-SV1(3,5,7), Mn Turb Stop Vlv #1(2,3,4) Drn Vlv.
Standard Shuts the drains as needed CUE Comments SAT UNSAT Comment Number
- 8. Re-verify pressure set at least 15 psig > RPV pressure to prevent inadvertent BPV operation when Inbd F022s open.
Standard Verifies that the pressure at least 15 psig > RPV pressure.
CUE Comments SAT UNSAT Comment Number
Standard The Inboard MSIVs are open CUE Comments SAT UNSAT Comment Number Page 9 of 11
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 STOP TIME: _____________
TERMINATING CUES:
The inboard MSIVs are open.
K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 239001 A4.01 4.2* 4.0 A4.02 3.2 3.2 A4.07 3.3 3.3 Page 10 of 11
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 INITIATING CUE A loss of IA resulted in closure of the Inbd. MSIVs. IA has been recovered. EOP-1 has been entered and to assist in RPV pressure control you are directed to reopen the Inbd. MSIVs per CPS No. 4411.09.
Page 11 of 11