CLINTON POWER STATION Job Performance Measure Equalize Around and Open MSIVs per CPS No. 4411.09 JPM Number: 4411.0901 Revision Number: 01 Date: 7/8/03 Developed By: T. Pickley 7/8/03 Instructor Date Validated By: J. Anderson 10/17/03 SME or Instructor Date Review By: P. K. Ryan _7/28/03 Operations Representative Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 11

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 Revision Record (Summary)

1. Revision 01, Reformatted from 15200J07 Page 3 of 11

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 Operators Name: SSN:

Job

Title:

NLO RO SRO STA SRO Cert JPM Title/Number: Equalize Around and Open MSIVs per CPS No. 4411.09 Revision Number: 01 Task Number and

Title:

441109.01, Complete control room actions to perform RPV pressure control sources using normal system lineup/operation Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: No Perform Alternate Path: No Time Critical: No Estimated Time to Complete: 30 _minutes Actual Time Used: minutes

References:

CPS No. 4411.09 RPV PRESSURE CONTROL SOURCES EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: __________________________

Evaluators Signature: Date:

Page 4 of 11

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues.

When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SET-UP CONDITIONS:

Reset to a shutdown IC, at ~300 psig with a vacuum pump, CW in operation and Main Turbine reset, then:

1) Close the Inboard MSIVs
4) Depressurize equalizing header with BPV jack to ~50 psig
5) Set pressure set at >315 psig TASK STANDARDS:

Operator actions performed per CPS No. 4411.09 TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

None PROCEDURAL/

REFERENCES:

CPS No. 4411.09 RPV PRESSURE CONTROL SOURCES EVALUATOR INSTRUCTIONS:

Amplifying cues are provided within the JPM steps.

INITIAL CONDITIONS AND INITIATING CUE:

A loss of IA resulted in closure of the Inbd. MSIVs. IA has been recovered. EOP-1 has been entered and to assist in RPV pressure control you are directed to reopen the Inbd. MSIVs per CPS No. 4411.09.

START TIME:

Page 5 of 11

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01

==============================================================

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

==============================================================

PERFORMANCE STEPS 2.2.1 MAIN STEAM - CONDENSER/BYPASS VALVES/MSL DRAINS

1. IF This section was entered from EOP-2, EOP-3 or SAG-2, THEN 1) OK to defeat isolations per CPS 4410.00C007, Defeating RPV Vent Interlocks.
2) OK to exceed 100°F/hr cooldown.
2. Reset any cleared GROUP 1 isolations.

Standard Determines that no pressure control system interlocks need to be defeated and that Group 1 isolation is reset.

CUE Comments SAT UNSAT Comment Number Page 6 of 11

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01

3. Regardless if Circ Water (CW) is available or not:
1) Establish vacuum per CPS 3112.01, Condenser Vacuum (CA), or
2) If vacuum cannot be established, open 1CA007, Condenser Vacuum Breaker Valve.

Standard Determines that Condenser vacuum is already established.

CUE Comments SAT UNSAT Comment Number

4. Verify/set pressure set at least 15 psig > RPV pressure to prevent inadvertent BPV operation.

Standard Verifies that the pressure at least 15 psig > RPV pressure or adjusts as needed.

CUE Comments SAT UNSAT Comment Number

5. Shut/verify shut:
1) 1B21-F022B(D, A, C), Main Steam Line B (D, A, C) Inbd MSIV.
2) 1B21-F016, MS Drn & MSIV Byp Inbd Isol Valve.
3) 1B21-F019, MS Drn & MSIV Byp Outbd Isol Valve.
4) 1B21-F020, MSIV Byp Vlv For MS Line Warm Up.

Standard 1) 1B21-F022B(D, A, C), are verified shut (Green lights on)

2) 1B21-F016, F019 and F020, are verified shut (Green lights on)

CUE Comments SAT UNSAT Comment Number Page 7 of 11

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01

6. Open/verify open:
1) 1B21-F098B(D, A, C), Main Steam Shutoff Valves.
2) 1B21-F028B(D, A, C), Main Steam Line Outbd MSIVs.

Standard 1B21-F098B(D, A, C) and 1B21-F028B(D, A, C) are verified open (red lights on)

CUE Comments SAT UNSAT Comment Number

  • 7. Equalize around the Inbd MSIVs (F022s) to establish a P 200 psid across the MSIVs by opening:
1) 1B21-F016, MS Drn & MSIV Byp Inbd Isol Valve.
2) 1B21-F019, MS Drn & MSIV Byp Outbd Isol Valve.
3) 1B21-F020, MSIV Byp Vlv For MS Line Warm Up.

Standard Opens 1B21-F016, 1B21-F019 and 1B21-F020 CUE Comments SAT UNSAT Comment Number Page 8 of 11

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01

? OK to shut following drains to assist in the dP attempt.

o 1B21-F015, MS Low Points Drn Shutoff Valve.

o 1B21-F021, Inbd MSIV Before Seat Warmup Drn Valve.

o 1B21-F033, Inbd MSIV Before Seat Warmup Drn Valve.

o 1B21-F068, Outbd MSIV Before Seat Warmup Drn Vlv.

o 1B21-F069, Outbd MSIV Before Seat Norm Drn Vlv.

o 1B21-F070, MS Low Point Warm Up Drn Vlv.

o 1B21-F071, MS Low Point Normal Drn Vlv.

o 1TD-SV1(3,5,7), Mn Turb Stop Vlv #1(2,3,4) Drn Vlv.

Standard Shuts the drains as needed CUE Comments SAT UNSAT Comment Number

8. Re-verify pressure set at least 15 psig > RPV pressure to prevent inadvertent BPV operation when Inbd F022s open.

Standard Verifies that the pressure at least 15 psig > RPV pressure.

CUE Comments SAT UNSAT Comment Number

Standard The Inboard MSIVs are open CUE Comments SAT UNSAT Comment Number Page 9 of 11

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 STOP TIME: _____________

TERMINATING CUES:

The inboard MSIVs are open.

K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 239001 A4.01 4.2* 4.0 A4.02 3.2 3.2 A4.07 3.3 3.3 Page 10 of 11

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 4411.0901 REVISION: 01 INITIATING CUE A loss of IA resulted in closure of the Inbd. MSIVs. IA has been recovered. EOP-1 has been entered and to assist in RPV pressure control you are directed to reopen the Inbd. MSIVs per CPS No. 4411.09.

Page 11 of 11