ML21144A240
| ML21144A240 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 04/13/2021 |
| From: | Gregory Roach Operations Branch III |
| To: | NRC/RGN-III/DRS/OLB |
| Roach G | |
| Shared Package | |
| ML20136A302 | List: |
| References | |
| U-60458 | |
| Download: ML21144A240 (2) | |
Text
-
=="
i
- Clinton, IL 61727 U-604588 December 17,2020 Regional Administrator,Region 111 U.S.Nuclear Regulatory Commission 2443Warrenville Road,Suite 210
- Lisle, IL60532-4352 Clinton Power Station, Unit 1 Facility Operating License No.
NPF-62 NRCDocket No.50-461
Subject:
Submittal ofIntegrated Initial License Training Examination Materials Enclosed aretheexamination materials, which Clinton Power Station (CPS) issubmitting in support oftheinitial license examscheduled fortheweeksof 03/29/21 through04/09/21, at CPS.
Thissubmittal includes theSenior Reactor Operator andReactor Operator Written Examinations, JobPerformance
- Measures, andIntegrated Plant Operation Scenario Guides.
Theseexamination materials havebeendeveloped inaccordance with NUREG-1021, "Operator Licensing Examination Standards forPowerReactors,"
Revision 11 Please note that reference materials areincluded inthepackage.
Since the150daysubmittal, modifications havebeenmadetotheIntegrated Examination Outlines withregards toScenarios 1,2and4toimprove content andensure critical task validity.
Thesechanges improve examination quality andareincompliance with NUREG-1021,Revision 11,"Operator Licensing Examination Standards forPowerReactors."
Somemodifications oradjustments totheexamination material mayberequired dueto procedural changes.
Inaccordance with NUREG-1021, Revision 11,Section ES-201, please ensure that these materials arewithheld frompublic disclosure until after theexaminations arecomplete.
U.S.
Nuclear Regulatory Commission U-604588 Page 2of2 There are no regulatory commitmentscontained inthis letter.
Should youhaveany questions concerning this letter please contact Mr.Trevor
- Krawcyk, Senior Manager Site Training at(217) 937-4000.
Forquestions concerning examination materials please contact Mr.Matthew
- Beeler, Lead Operations Instructor, at(217) 937-4078.
Respectfully, m
ThomasD.Chalmers Site VicePresident Clinton PowerStation
Enclosures:
(Mailed toGregRoach, NRC Region Ill Chief Examiner)
=
RO/SROComposite Examination with referencesattached
=
Control RoomSystems andFacility Walk-Through JobPerformance Measures with references attached
=
Administrative Topic JobPerformance Measures with references attached
=
Integrated Plant Operation Scenario Guides
=
Completed Checklists:
e Operating TestQuality Checklist (Form ES-301-3) a Simulator Scenario Quality Checklist (Form ES-301-4) a Transient andEvent Checklist (Form ES-301-5) e Competencies Checklist (Form ES-301-6)
Written ExamQuality Checklist (Form ES-401-6)
=
Examination Security Agreements (Form ES-201-3)
=
Record ofRejected K/As(Form ES-401-4) cc:Chief, NRCOperator Licensing Branch (without Enclosures)
NRCSenior Resident inspector
- Clinton PowerStation (without Enclosures)
NRCProject
- Manager, NRR
- Clinton PowerStation (without Enclosures)
NRCDocument Control Desk(without Enclosures)