ML21144A240

From kanterella
Jump to navigation Jump to search
LTR 75 Day Submittal
ML21144A240
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/13/2021
From: Gregory Roach
Operations Branch III
To:
NRC/RGN-III/DRS/OLB
Roach G
Shared Package
ML20136A302 List:
References
U-60458
Download: ML21144A240 (2)


Text

-

=="

Clinton, IL 61727

- i U-604588 December 17,2020 Regional Administrator,Region 111 U.S. Nuclear Regulatory Commission 2443Warrenville Road, Suite 210 Lisle, IL60532-4352 ClintonPower Station, Unit 1 Facility Operating License No. NPF-62 NRCDocket No.50-461

Subject:

Submittal ofIntegrated Initial License Training Examination Materials Enclosed aretheexamination materials, which Clinton Power Station (CPS) issubmitting in support initial of the licenseexam scheduled for the w eeks o f 03/29/21 through 04/09/21, at CPS.

This submittal includestheSenior ReactorOperator andReactor Operator Written Examinations, JobPerformance Measures, andIntegrated Plant Operation Scenario Guides.

These examination materialshave beendeveloped inaccordance with NUREG-1021, "Operator Licensing Examination Standards forPower Reactors," Revision 11 Please note that reference materialsareincluded inthepackage.

Since the150daysubmittal, modifications have beenmadetothe Integrated Examination Outlines with regards toScenarios 1,2 and4 toimprove content andensure criticaltask validity. These changes improve examination and qualityarein compliance with NUREG-1021, Revision 11,"Operator Licensing Examination Standards for Power Reactors."

Somemodifications oradjustments tothe examination material mayberequired dueto procedural changes.

Inaccordance with NUREG-1021, Revision 11,Section ES-201, please ensure that these materials are withheldfrom public disclosure untilafter theexaminations arecomplete.

U.S. Nuclear Regulatory Commission U-604588 Page 2 of2 There are no regulatory commitmentscontained inthis Should letter. youhave any questions concerning thisletter please contactMr.Trevor Krawcyk, SeniorManager Site Training at(217) 937-4000. Forquestions concerning examination materialspleasecontact Mr.Matthew Beeler, Lead Operations Instructor,at(217) 937-4078.

Respectfully, m

ThomasD.Chalmers Site VicePresident Clinton Power Station

Enclosures:

(Mailed toGreg Roach, NRC Region Ill Chief Examiner)

= RO/SRO Composite Examination withreferences attached

= Control RoomSystems andFacility Walk-Through JobPerformance Measures with references attached

= Administrative TopicJobPerformance Measures with references attached

= Integrated Plant Operation Scenario Guides

= Completed Checklists:

e Operating TestQuality Checklist(Form ES-301-3) a Simulator Scenario Quality Checklist(Form ES-301-4) a Transient andEvent Checklist(Form ES-301-5) e Competencies Checklist (Form ES-301-6)

Written ExamQuality Checklist(Form ES-401-6)

= Examination Security Agreements (Form ES-201-3)

= Record ofRejected K/As (Form ES-401-4) cc: Chief, NRCOperator Licensing Branch (without Enclosures)

NRCSenior Residentinspector -

Clinton Power Station(withoutEnclosures)

NRCProject Manager, NRR Clinton Power Station (withoutEnclosures)

NRCDocument ControlDesk(without Enclosures)