ML041120489
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML041120489 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 03/26/2004 |
From: | United Detailers |
To: | Office of Nuclear Reactor Regulation |
References | |
DC-110152 1C93, SD-040303-001, Rev 0 | |
Download: ML041120489 (1) | |
Similar Documents at Cook | |
---|---|
Category:Calculation
MONTHYEARAEP-NRC-2020-40, Calculation PRA-QNT-009, Rev. 0, Evaluation of Risk Significance of Short-Term ILRT Extension2020-05-22022 May 2020
[Table view]Calculation PRA-QNT-009, Rev. 0, Evaluation of Risk Significance of Short-Term ILRT Extension ML20132A2022020-04-29029 April 2020 Annual Radioactive Effluent Release Report Including Off-site Dose Calculation Manual Changes AEP-NRC-2018-35, Annual Radioactive Effluent Release Report - Off-Site Dose Calculation Manual2018-04-30030 April 2018 Annual Radioactive Effluent Release Report - Off-Site Dose Calculation Manual ML18024A4472018-01-19019 January 2018 Enclosure 2 - Technical Support Center Loss of Coolant Accident Radiological Analysis AEP-NRC-2016-89, to Calculation MD-12-FLOOD-011-N, Flood Hazard Reevaluation Report for the Donald C. Cook Nuclear Plant2016-10-28028 October 2016 to Calculation MD-12-FLOOD-011-N, Flood Hazard Reevaluation Report for the Donald C. Cook Nuclear Plant ML16287A6102016-10-11011 October 2016 Calculation PRA-QNT-007, Calculation of Regulatory Guide 1.177 Risk Parameters for Potential One-Time Emergency Technical Specification Completion Time Change for Unit 1 and Unit 2 Train B Reserve Feed. AEP-NRC-2016-23, Calculation RWA-1313-001, Rev. 1, AST Radiological Analysis Input Parameter Development.2016-02-12012 February 2016 Calculation RWA-1313-001, Rev. 1, AST Radiological Analysis Input Parameter Development. ML15154B0482015-05-29029 May 2015 Risk Analysis to Support Response to Requests for Additional Information Regarding One Time Emergency License Amendment Request to Revise Tech Spec Section 3.8.1 to Permit Extending the Completion Time. (RAI-APLA 2 Through 8) ML15154B0502015-05-29029 May 2015 Risk Analysis to Support Response to Requests for Additional Information Regarding One Time Emergency License Amendment Request to Revise Tech Spec Section 3.8.1 to Permit Extending the Completion Time. (RAI-APLA 1) AEP-NRC-2015-49, Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator2015-05-28028 May 2015 Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator AEP-NRC-2015-14, Response to March 12, 2012, Request for Information, Enclosure 2, Recommendation 2.1: Flooding, Required Response 2, Hazard Reevaluation Report2015-03-0606 March 2015 Response to March 12, 2012, Request for Information, Enclosure 2, Recommendation 2.1: Flooding, Required Response 2, Hazard Reevaluation Report ML14071A4362014-03-0505 March 2014 Enclosure 3 to AEP-NRC-2014-09, Calculation, PRA-ILRT, Rev. 2, Risk Impact Assessment for Permanently Extending Containment Type a Test Interval ML12340A4432012-11-26026 November 2012 Enclosure 2 to AEP-NRC-2012-86 - Flooding Walkdown Report ML0809203932008-03-28028 March 2008 Submittal of Annual Radioactive Effluent Release Report, January 1, 2007, Through December 31, 2007. Pages A3.0-1, Off-Site Dose Calculation Manual, PMP-6010-OSD-001, Revision 22 Through End ML0436401412005-03-11011 March 2005 License Amendment, Request to Use Yield Strength Determined from Measured Material Properties for Reinforcing Bar in Structural Calculations for Control Rod Drive Missile Shields ML0411204982004-03-26026 March 2004 Drawing 2C93, Unit No. 2 Containment Bldg Missile Shield ML0411204892004-03-26026 March 2004 Drawing 1C93, Unit No. 1 Containment Bldg Missile Shield ML0403400952003-11-24024 November 2003 Calculation ST-452, Rev. 0, Structural Evaluation of the D.C. Cook Unit 1 Sgla Closures. 2020-05-22 Category:Drawing MONTHYEARML24159A1672024-05-30030 May 2024
[Table view]Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 10, Figures ML24159A2172024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 8, Figures ML24159A2052024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figures 14.3.1-1A to 14.3.3-8 (Unit 2) ML24159A2132024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) ML24159A1792024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.1, Figures 14.1.0-1 to 14.1.12-2 (Unit 2) ML24159A2002024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.2, Figures 14.2.5-1 to 14.2.8-8 (Unit 2) ML24159A1772024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.2, Figures 14.2.5-1 to 14.2.7-6 (Unit 1) ML24159A1722024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 3, Figures (Unit 1) ML24159A1712024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 2, Figures ML24159A1752024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 7, Figures ML24159A1742024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.4, Figures 14.4.2-1 to 14.4.9-2 (Unit 2) ML24159A1822024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 5, Figures (Redacted) ML24159A2202024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 4, Figures ML24159A1642024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 6, Figures ML24159A1702024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 11, Figures ML24159A1632024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1) ML24159A2382024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 1, Figures (Redacted) ML24159A2222024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1) ML24159A2252024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 3, Figures (Unit 2) ML24159A1962024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) ML24159A1902024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.1, Figures 14.1-1 to 14.1.13-6 (Unit 1) ML24159A2102024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 14, Section 14.3, Figure 14.3.7-1 (Unit 2) ML24159A2152024-05-30030 May 2024 Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 9, Figures ML22340A1342022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Figures ML22340A1522022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 5, Figures (Redacted) ML22340A1892022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Figures ML22340A1692022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2) ML22340A1872022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1) ML22340A1292022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Figures ML22340A1842022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 14.3, Figure 14.3.7-1 (Unit 2) ML22340A1422022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 1) ML22340A1942022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Figures ML22340A2152022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) ML22340A1912022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 8, Figures ML22340A1382022-11-30030 November 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Figure 2024-05-30 |
Text