Withdrawal of License Amendment Request 03-15, Steam Generator Tube Repair Using Leak Limiting Alloy 800 Sleeves and Revision to Technical Specification Table 5.5.9-2, 'Steam Generator (SG) Tube Inspection.'
ML042940400
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/14/2004
From: Oatley D
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-04-124, OL-DPR-80, OL-DPR-82
Download: ML042940400 (3)


Text

Pacific Gas and Electric Company David H.Oatley Diablo Canyon Power Plant October 14, 2004 Vice President and General Manager PO. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-04-124 Fax 805.545.4234 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units I and 2 Withdrawal of License Amendment Request 03-15, "Steam Generator Tube Repair Using Leak Limiting Alloy 800 Sleeves and Revision to Technical Specification Table 5.5.9-2, 'Steam Generator (SG) Tube Inspection"'

Dear Commissioners and Staff:

PG&E Letter DCL-03-132, dated October 22, 2003, submitted License Amendment Request (LAR) 03-15, "Steam Generator Tube Repair Using Leak Limiting Alloy 800 Sleeves and Revision to Technical Specification Table 5.5.9-2, 'Steam Generator (SG) Tube Inspection."' LAR 03-15 proposes to change Technical Specification (TS) Section 5.5.9, "Steam Generator (SG) Tube Surveillance Program," and TS Section 5.6.10, "Steam Generator (SG) Tube Inspection Report," to allow use of leak limiting Alloy 800 sleeves to repair degraded SG tubes as an alternative to plugging the SG tubes. The LAR also proposes to remove an unnecessary reporting requirement contained in TS Table 5.5.9-2, "Steam Generator (SG) Tube Inspection." PG&E Letter DCL-03-132 contained Westinghouse Electric LLC (Westinghouse) WCAP-15919-NP, Revision 00, "Steam Generator Tube Repair for Westinghouse Designed Plants with 7/8 Inch Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves," dated August 2003 (nonproprietary), and WCAP-1 5919-P, Revision 00, 'Steam Generator Tube Repair for Westinghouse Designed Plants with 7/8 Inch Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves," dated August 2003 (proprietary), which document the use of Leak Limiting Alloy 800 Sleeves to repair degraded SG tubes.

PG&E Letter DCL-04-070, "Response to NRC Request for Additional Information Regarding License Amendment Request 03-15, 'Steam Generator Tube Repair Using Leak Limiting Alloy 800 Sleeves and Revision to Technical Specification Table 5.5.9-2, 'Steam Generator (SG) Tube Inspection,"" dated June 4, 2004, responded to the staffs questions dated March 8 and May 14, 2004.

PG&E Letter DCL-04-079, "Transmittal of WCAP-15919-P, 'Steam Generator Tube Repair for Westinghouse Designed Plants with 7/8 Inch Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves,' Revision 01, to Support License Amendment A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk PG&E letter DCL-04-124 October 14, 2004 Page 2 Request 03-15, 'Steam Generator Tube Repair Using Leak Limiting Alloy 800 Sleeves and Revision to Technical Specification Table 5.5.9-2, "Steam Generator (SG) Tube Inspection,""' dated June 25, 2004, submitted revised WCAP-1 5919-NP, Revision 01, and revised WCAP-15919-P, Revision 01.

On June 24 and August 9, the NRC staff provided additional questions related to the redefinition of the pressure boundary transition in the rolled joint region of the tubesheet (TZ) sleeve, the effectiveness of the eddy current inspection method for detecting cracks in the parent tube behind the nickel band in TZ sleeve, and the ability of the rolled joint above the bottom of the microlok band to provide structural and leakage integrity. The effort involved to resolve these technical issues is not expected to be completed until February of 2005. In addition, a revision to WCAP-15919-NP, Revision 01, WCAP-15919-P, Revision 01, and the TS associated with leak limiting alloy 800 sleeves is expected to be required.

Therefore, PG&E is requesting withdrawal of LAR 03-15and closure of the associated TAC numbers. PG&E plans to resubmit proposed TS changes for SG tube repair using leak limiting alloy 800 sleeves upon resolution of the current technical issues.

If you have any questions, or require additional information, please contact Stan Ketelsen at (805) 545-4720.

Sincerely, David H. Oatley Vice President and General Manager kjse/extension 4328 cc: Edgar Bailey, DHS Bruce S. Mallett David L. Proulx Girija S. Shukla Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • South Texas Project . Wolf Creek

PG&E letter DCL-04-124 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

) Docket No. 50-275 In the Matter of ) Facility Operating License PACIFIC GAS AND ELECTRIC COMPANY) No. DPR-80

)

Diablo Canyon Power Plant ) Docket No. 50-323 Units 1 and2 ) Facility Operating License

) No. DPR-82 AFFIDAVIT David H. Oatley, of lawful age, first being duly sworn upon oath says that he is Vice President and General Manager - Diablo Canyon of Pacific Gas and Electric Company; that he has executed this withdrawal of LAR 03-15 on behalf of said company with full power and authority to do so; that he is familiar with the content thereof; and that the facts stated therein are true and correct to the best of his knowledge, information, and belief.

David H. Oatley Vice President and GeneralManager Subscribed and sworn to before me this 14th day of October 2004.

I ~KOMf t MASON -

ComngsCo on#142845 Notary Public L'uis Obiso Coud I County of San Luis Obispo  ;. Ha93.207 I..

W_ -

State of California