Correction to Amendment No. 218, Technical Specification Page 3.1-12
ML061240377
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/03/2006
From:
Nebraska Public Power District (NPPD)
To:
Office of Nuclear Reactor Regulation
Benney B, NRR/DLPM, 415-3764
Shared Package
ML061240137 List:
References
TAC MC6760
Download: ML061240377 (1)


Text

Control Rod Scram Ti-nes 3.1.4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 C:ontrol Rod Scram Times LCO 3.1.4 a. No more than 10 OPERABLE control rods shall be "slow," in accordance with Table 3.1.4-1; and

b. No more than 2 OPERABLE control rods that are "slow" shall occupy adjacent locations.

APPLICABILITY: MODES 1 and 2.

ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A. Requirements of the LCO A.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> not met.

SURVEILLANCE REQUIREMENTS

- .-------------------------- NOTE-------------------------------------

During single control rod scram time Surveillances, the control rod drive (CRD) pumps shall be isolated from the associated scram accumulator.

SURVEILLANCE FREQUENCY I

SR 3.1.4.1 Verify each control rod scram time is within the limits Prior to exceeding of Table 3.1.4-1 with reactor steam dome pressure 40% RTP after

> 800 psig. each reactor shutdown

> 120 days SR 3.1.4.2 Verify, for a representative sample, each tested 200 days control rod scram time is within the limits of cumulative Table 3.1.4-1 with reactor steam dome pressure operation in

> 800 psig. MODE 1 Cooper 3.1 -12 Amendment No. 218