ML20055F757
| ML20055F757 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/28/1990 |
| From: | Dennis Morey ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20055F742 | List: |
| References | |
| NUDOCS 9007190159 | |
| Download: ML20055F757 (1) | |
Text
.
- 1
', OPERATING DATA REPORT DOCKET No. 50-364 DATE 3/2/90 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS Notes
- 1. Unit Names- -Joseph H. Farley - Unit 2 1) Cumulative data since
- 2. Reporcing Period: Februhry 1990 7-30-81, date of
-3.-Licensed Thermal Power (HWt): 2,65E' commercial operation.
4.-Nameplate Rating (Gross HWe): 860
- 5. Design Electrical Rating (Net HWe): 829
- 6. Maximum Dependable Capacity (Gross HWe): 868.6
- 7. Maximum Dependable Capacity (Net HWe): 828.2
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net HVe): N/A +
- 10. Reasons For Restrictions, If Any: N/A This Month Tr-to-Date Cumulative
- 11. Hours In Reporting Period 672 1,416 75,265
- 12. Number Of Hours Reactor Vas Critical 672.0 1,416 65,299.1 l
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 672.0 1,416.0 _ 64,488.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross' Thermal Energy Generated (MVH) 1,631,313 3,601,619 163,857,886
- 17. Gross Electrical Energy Generated (MVH) 537,460 1,192,390 _53,858,932
- 18. Net Electrical Energy Generated (HVH) 509,660 1,134,424 51,077,814
- 19. Unit Service Factor 100.0 100.0 85.7
- 20. Unit Availability Factor 100.0 100.0 85.7
.21. Unit Capacity Factor (Using HDC Net) 91.6 96.7 83.0
- 22. Unit Capacity Factor (Using DER Net) 91.5 96.6 81.9 l> :23. Unit Forced Outage Rate 0 0.0 4.5 l1 24. Shutdowns Scheduled over Next 6 Honths (Type, Date, and Duration of Each):
L .N/A
=
25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved l
INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 i Form 2/30 9007190159 900711 DR ADOCK0500g4