MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 2024-09-24
[Table view] |
Text
WBN2Public Resource From: Arent, Gordon [garent@tva.gov]
Sent: Thursday, August 05, 2010 4:19 PM To: Lamb, John Cc: Campbell, Stephen; Raghavan, Rags; Milano, Patrick; WBN2HearingFile Resource; Wiebe, Joel; Crouch, William D
Subject:
RE: Question - WBN Unit 2 - Generic Communications Attachments: Generic Communications Update.docx
- John, Per our conversation, attached is the status of the items noted below. Additionally, the information for ATWS (GL 83
- 28) is also provided.
Gordon From: Lamb, John [1]
Sent: Thursday, August 05, 2010 12:32 PM To: Arent, Gordon; Crouch, William D Cc: Campbell, Stephen; Raghavan, Rags; Milano, Patrick; WBN2HearingFile Resource; Wiebe, Joel
Subject:
Question - WBN Unit 2 - Generic Communications Gordon & Bill, With reference to the open pre-1995 generic communications contained in NUREG-0847, Supplement 21, could you please tell me where the TVA Action is addressed for the following pre-1995 generic communications?
GL 1982-28: Inadequate Core Cooling Instrumentation System GL 1989-04: Guidelines on Developing Acceptable In-service Testing Programs GL 1992-08: Thermo-Lag 330-1 Fire Barriers BL 1992-01: Failure of Thermo-Lag 330 Fire Barrier System to Perform its Specified Fire Endurance Function Thanks.
John 1
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 54 Mail Envelope Properties (14495210B2808F499555F3B6E04436570C559EA8)
Subject:
RE: Question - WBN Unit 2 - Generic Communications Sent Date: 8/5/2010 4:18:39 PM Received Date: 8/5/2010 4:20:31 PM From: Arent, Gordon Created By: garent@tva.gov Recipients:
"Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>
Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>
Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Wiebe, Joel" <Joel.Wiebe@nrc.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov>
Tracking Status: None Post Office: TVANUCXVS1.main.tva.gov Files Size Date & Time MESSAGE 1027 8/5/2010 4:20:31 PM Generic Communications Update.docx 20250 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Document Action Status B 92-001 No Action Required (C) This bulletin was provided for information only to plants with Failure of Thermo-Lag 330 Fire construction permits.
Barrier System to Maintain Cabling in Wide Cable Trays and See Generic Letter 92-08 for Small Conduits Free From Fire Thermo-lag related actions.
Damage GL 82-028 Unit 2 Action: Install LICENSE CONDITION -
Westinghouse Common Q PAM Inadequate Core Cooling system. (CI) Detectors for Inadequate core Instrumentation System cooling (II.F.2) In the original SER, the review of the ICC instrumentation was incomplete.
The January 24, 1992, letter superseded the previous responses on this issue. TVA letter for Units 1 and 2 dated January 24, 1992, committed to install Westinghouse ICCM-86 and associated hardware. NRC completed the review for Units 1 and 2 in SSER10.
For Unit 2 due to obsolescence of the ICCM-86 system, TVA intends to install the Westinghouse Common Q Post-Accident Monitoring System.
GL 83-028 "Required Actions Based on Generic Implications of Salem ATWS Events:
1.2 - Post Trip Review Data and No Action Required (C) TVA: letters dated November 7, Information Capability 1983 and December 4, 1987 NRC: IR 50-390, 391/86-04 2.1 - Equipment Classification Unit 2 Action: Ensure that TVA: letters dated November 7, and required information on Critical 1983 and August 24, 1990 Vendor Interface (Reactor Trip Structures and Components is System Components) properly incorporated into NRC: letters dated October 20, procedures. (CI) 1986 and June 18, 1990 2.2 - Equipment Classification Unit 2 Action: Enter engineering NA and component background data in
Vendor Interface (All SR INPO's Equipment Performance Components)" and Information Exchange System (EPIX) for Unit 2. (CI) 3.1 - Post-Maintenance Testing Unit 2 Action: Test and Developmental Revision A of the (Reactor Trip System maintenance procedures and Unit 2 TS (including the TS Components) Technical Bases) was submitted on March Specifications will include post- 4, 2009.
maintenance operability testing of safety-related components of The Bases for TS Surveillance the reactor trip system (S) Requirement 3.0.1 states, in part, Upon completion of Test and Maintenance maintenance, appropriate post procedures require inspection. maintenance testing is required to declare equipment OPERABLE. This includes ensuring applicable Surveillances are not failed and their most recent performance is in accordance with SR 3.0.2.
3.2 - Post-Maintenance Testing Unit 2 Action: Test and Developmental Revision A of the (All SR Components) maintenance procedures and Unit 2 TS (including the TS Technical Bases) was submitted on March Specifications will include post- 4, 2009.
maintenance operability testing of safety-related components of The Bases for TS Surveillance the reactor trip system (S) Requirement 3.0.1 states, in part, Upon completion of Test and Maintenance maintenance, appropriate post procedures require inspection. maintenance testing is required to declare equipment OPERABLE. This includes ensuring applicable Surveillances are not failed and their most recent performance is in accordance with SR 3.0.2.
4.1 - Reactor Trip System Unit 2 Action: Confirm vendor- TVA: letter dated May 19, 1986 Reliability recommended DS416 breaker (Vendor Related Modifications) modifications are implemented.
(CI) 4.2 - Reactor Trip System Unit 2 Action: Ensure Developmental Revision B of the Reliability maintenance instruction Unit 2 TS was submitted on (Preventive Maintenance and procedure and February 2, 2010.
Surveillance Program for Reactor Technical Specifications support Trip Breakers) reliable reactor trip breaker Item 17. (Reactor Trip Breakers) operation. (S) of TS Table 3.3.1-1 states the requirement for the reactor trip Maintenance procedures require breakers.
inspection.
4.3 - Reactor Trip System No Action Required TVA: letters dated November 7, Reliability 1983, March 22, 1985 (Automatic Actuation of Shunt Trip NRC: IR 50-390/86-04 and 50-
Attachment) 391/86-04; letter dated June 18, 1990 4.5 - Reactor Trip System Unit 2 Action: Address in Developmental Revision B of the Reliability Technical Specifications, as Unit 2 Technical Specifications (Automatic Actuation of Shunt appropriate. (S) (TS) was submitted on February Trip 2, 2010.
Attachment)
Item 18. (Reactor Trip Breaker Undervoltage and Shunt Trip Mechanisms) of TS Table 3.3.1-1 states the requirement for the shunt trip attachment.
GL 89-004 Unit 2 Action: Submit an ASME Section XI Inservice Test Guidelines on Developing Program for the first ten year Acceptable Inservice Testing interval six months before Programs receiving an Operating License.
(OV)
GL 92-008 Unit 2 Actions: 1) Review Watts TVA configurations for Thermo-Bar design and installation Lag 330-1 were reviewed in Thermo-Lag 330-1 Fire Barriers requirements for Thermolag 330- SSER18 and accepted in NRC 1 fire barrier system and evaluate letter dated January 6, 1998 the Thermolag currently installed (includes a supplemental SE).
in Unit 2.
- 2) Remove and replace, as required, or prepare an approved deviation. (OV)