MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 2024-07-11
[Table view] Category:Part 55 Examination Related Material
MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 2024-07-11
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: ___Point Beach_____ Scenario No.: __1_____ Op-Test No.: 2011301 Examiners: ____________________________ Operators: _____________________________
Initial Conditions: _100% reactor power - EOL Turnover: Emergency diesel generator (G01) is OOS, motor-driven auxiliary feedwater pump (P38A) is OOS. The return to service time for both the G01 and P38A is approximately four hours from now. The plant is under a severe weather watch. G02 is aligned to 1A05 and 2A05 in accordance with OI-35A. IT 07G SW valve stroke time test is scheduled to be conducted immediately after shift turnover.
Event Malf. Event Event No. No. Type* Description N-BOP 1 Conduct IT-07G SW Valve Stroke Time Test N-SRO C-RO 2 C-SRO In-Service Charging Pump Failure TS-SRO I-BOP 3 S/G B Level Transmitter ILT-471 Failure High I-SRO I-RO 4 I-SRO Pressurize Pressure Channel Failure (PT-431) High TS-SRO C-BOP 5 C-SRO Steam Generator Tube Leak TS-SRO R-RO 6 N-SRO Conduct Rx Plant Shutdown N-BOP 7 M- ALL Steam Generator Tube Rupture 8 C-BOP Stuck Open Atmospheric Steam Dump Valve
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: ___Point Beach_____ Scenario No.: __2_____ Op-Test No.: 2011301 Examiners: ____________________________ Operators: _____________________________
Initial Conditions: _ Unit 1 is at 28% power, middle of life.
Turnover: The following equipment is out of service: AB@ safety injection pump in day 3 of 7 of LCO to replace the outboard seal, continuing with power escalation IAW OP-1C, Step 4.120.
Event Malf. Event Event No. No. Type* Description N-BOP 1 Start a Heater Drain Tank Pump.
N-SRO R-RO 2 Increase Reactor Power from 28% at the Normal Rate.
N-SRO I-BOP 2 I-SRO Turbine First Stage Pressure Instrument PT-485 Fails Low.
TS-SRO I-RO 3 I-SRO Pressurizer Level Instrument 1LT-428 Fails Low.
TS-SRO N-BOP 4 Restore normal letdown N-SRO C-BOP 5 C-SRO Power Operated Relief Valve 1RC-430 Seat Leakage.
TS-SRO 6 M- ALL Steam Line Break Upstream of the Unit 1 AA@ MSIV.
7 M-ALL Reactor Trip Breakers Fail to Open (ATWS)
C-BOP Train AA@ ESF Sequencer Fails to Actuate.
C-SRO
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Facility: Point Beach Nuclear Station Scenario No.: 3 Op-Test No.: 2011301 Examiners: D. McNeil Operators:
R. Walton D. Reeser Initial Conditions: Unit 1 is at 23% reactor power, BOL, equilibrium xenon conditions following a reactor trip from full power five days ago due to a failure of the Unit 1 Voltage Regulator. Unit 2 is at 100% reactor power. Present clock time is real time. Normal shift complement with the exception of the 3rd SRO.
Turnover: G-01 EDG is out of service for annual maintenance. It was taken OOS 2 days ago, and is expected to be returned to service in 3 days. G-02 EDG is aligned to 4.16kV buses 1-A05 and 2-A05 IAW OI-35A. P-38B, Electric Auxiliary Feedwater Pump was declared inoperable 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago due to recirculation line cracks and has just been tagged out for repair. A severe thunderstorm watch is in effect for the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The RCS is at normal operating pressure and temperature. Steam Generator water level is being controlled with the Main Feedwater Regulating valves in automatic on a single train of feedwater and condensate. OP-1C, "Low Power Operation to Normal Power Operation" is in progress. You are to continue with unit startup per OP-1C.
Event Malf. Event Event No. No. Type* Description 1 R Normal Up-Power 2 I Thot Instrument (TE-401A) Fails High Running CCW Pump Shaft Seizes w/Failure of Standby CCW 3 C Pump to Auto Start 4 I Controlling SG Pressure Channel (PT-478) Fails High 5 M Small RCS Leak in "A" RCS Loop Degrading to Large Break 6 M Large Break LOCA 7 I Failure of SI to Auto-Actuate 8 C Failure of Containment Accident Fan 1W-1A1 to Auto-Start 9 C Failure of 1SI-852A to Auto-Open
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
@ See scenario description pages 2 & 3 for malfunction numbers.