ML14163A733

From kanterella
Revision as of 11:36, 6 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Arkansas Nuclear One - Notification of Evaluations of Changes, Tests, or Experiments, and Permanent Plant Modifications Inspection (NRC Integrated Inspection Report 05000313/2014004 and 05000368/2014004) and Request For Information
ML14163A733
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/12/2014
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Jeremy G. Browning
Entergy Operations
Farnholtz T R
References
IR-14-004
Download: ML14163A733 (6)


See also: IR 05000313/2014004

Text

June 12, 2014

Mr. Jeremy Browning, Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

1448 SR 333 Russellville, AR 72802-0967

SUBJECT: ARKANSAS NUCLEAR ONE - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, OR EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (NRC INTEGRATED INSPECTION REPORT 05000313/2014004 AND 05000368/2014004) AND REQUEST FOR INFORMATION

Dear Mr. Browning:

From July 28 through August 8, 2014, reactor inspectors from NRC's Region IV office will perform the baseline inspection of changes, tests, experiments, and permanent plant modifications at Arkansas Nuclear One, Units 1 and 2, using NRC Inspection Procedure 71111.17, "Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications." Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Natalie Mosher of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mr. Ronald A. Kopriva, by telephone at 817-200-1104 or by e-mail at Ron.Kopriva@nrc.gov. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Thomas R. Farnholtz, Branch Chief Engineering Branch 1 Division of Reactor Safety Dockets: 50-313; 50-368 Licenses: DRP-51; NPF-6

Enclosure:

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications Request for Information cc: Electronic Distribution for Arkansas Nuclear One