ML18250A305

From kanterella
Revision as of 07:32, 6 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review: Fitzpatrick -Relief Request for the Fourth 10-Year Inservice Inspection Interval
ML18250A305
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/30/2018
From: Tanya Hood
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Corp
References
L-2018-LLR-0103
Download: ML18250A305 (3)


Text

NRR-DMPSPEm Resource From: Hood, Tanya Sent: Thursday, August 30, 2018 2:38 PM To: bryan.hanson@exeloncorp.com Cc: Williams, Christian D:(GenCo-Nuc); Loomis, Thomas R:(GenCo-Nuc)

Subject:

ACCEPTANCE REVIEW: FitzPatrick- Relief Request for the Fourth 10-Year Inservice Inspection Interval (EPID: L-2018-LLR-0103)

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT ACCEPTANCE OF RELIEF REQUEST FOR THE FOURTH 10-YEAR INSERVICE INSPECTION INTERVAL (EPID: L-2018-LLR-0103)

By letter dated July 26, 2018 (Agencywide Documents Access and Management System Accession No. ML18208A150), Exelon Generation Company, LLC (Exelon, the licensee), submitted a relief request for the James A. FitzPatrick Nuclear Power Plant. The purpose of this e-mail is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 260 hours10.833 days <br />1.548 weeks <br />0.356 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is by July 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at (301) 415-1387.

Tanya E. Hood Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2738 301-415-1387 Tanya.Hood@nrc.gov 1

2 Hearing Identifier: NRR_DMPS Email Number: 543 Mail Envelope Properties (Tanya.Hood@nrc.gov20180830143800)

Subject:

ACCEPTANCE REVIEW: FitzPatrick- Relief Request for the Fourth 10-Year Inservice Inspection Interval (EPID: L-2018-LLR-0103)

Sent Date: 8/30/2018 2:38:27 PM Received Date: 8/30/2018 2:38:00 PM From: Hood, Tanya Created By: Tanya.Hood@nrc.gov Recipients:

"Williams, Christian D:(GenCo-Nuc)" <Christian.Williams@exeloncorp.com>

Tracking Status: None "Loomis, Thomas R:(GenCo-Nuc)" <thomas.loomis@exeloncorp.com>

Tracking Status: None "bryan.hanson@exeloncorp.com" <bryan.hanson@exeloncorp.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3037 8/30/2018 2:38:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: